03A3928_RFQ_NOTICE.pdf
PDF 907 KB Posted
- Solicitation number
- 03A3928
- Issued by
- Del Norte County, California
About this file
This is a Request for Qualifications (RFQ) notice from the California Department of Transportation (Caltrans) for A&E On-Call Roadway Design, Project Development and Design Support Services during Construction in District 1, which covers Del Norte, Humboldt, Mendocino, and Lake counties. The RFQ seeks qualified firms to provide engineering studies, project development products, PS&E preparation, design support during construction, and other technical support services. The contract term is three years, with project development tasks performed in the first 36 months and design support continuing through the remaining duration. Interviews will be held via WebEx on February 4, 2025, with negotiations scheduled for March 10, 2024. Electronic SOQ submissions are due by 10:00 am on January 17, 2025.
The estimated contract amount ranges from $4,800,000 to $7,800,000. The DBE participation goal for this solicitation is 20%. The fee for profit is set at 10.5%, with defined annual escalation rates ranging from 2.08% to 4.17% over the contract term. The contract will be task order driven, with specific projects assigned through individual task orders. Notable exclusions include traffic engineering, environmental studies, structural engineering, geotechnical engineering, land surveying, and right of way engineering. The Lask Change Grade Project (EA 01-0F820) is specifically excluded as it is intended to be a CMGC project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
December 16, 2024 RFQ Number 03A3928
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION
REQUEST FOR QUALIFICATIONS NOTICE
NUMBER 03A3928
Read carefully as the following revisions have been made to this document:
• On 07/25/24, GENERAL, Executive Order N-12 – Generative Artificial
Intelligence (GenAI) Technology Use and Reporting added
• On 02/15/24, GENERAL the Fee & Escalation table has been revised
• On 03/16/23, GENERAL the Fee & Escalation table has been revised
• On 04/01/22, GENERAL, Ukraine-Russian-related Sanctions
Requirement added
• On 04/01/22, SUBMISSION OF STATEMENTS OF QUALIFICATIONS
(SOQs), the electronic submittal time changed to 10:00am
Note: Questions concerning this Request for Qualifications (RFQ) must be submitted in writing to the attention of Lisa Pallesen at Lisa.Pallesen@dot.ca.gov. Questions must be received no later than seven (7) business days after the RFQ advertisement. Consultants contacting the District or Division directly seeking information about this RFQ will be disqualified from consideration in the selection process.
Proposers are advised that Caltrans has established a federally mandated overall annual DBE goal comprising both race neutral and race conscious elements to ensure equal participation of DBE groups specified in 49 CFR 26.5. In compliance with 49 CFR 26, Caltrans set a contract goal for DBEs participating in this solicitation expressed as a percentage of the total dollar value of the resultant Agreement. The DBE participation goal for this solicitation is twenty percent (20%). See section I.H. in this RFQ for requirements.
I. GENERAL INFORMATION
A. Caltrans is soliciting Statements of Qualifications (SOQs) from qualified firms that may lead to the award of a contract for A&E On-Call Roadway Design, Project Development and Design Support Services during Construction services. In submitting your SOQ, you shall comply with the instructions found herein. In addition to those programs that are specified in this solicitation, prospective consultants are encouraged to consider programs that are available, such as those for the use of small businesses, disadvantaged businesses, disabled veteran businesses, new emerging firms, and other businesses covered by State and Federal programs.
B. The estimated contract amount is $ 4,800,000.00 - $7,800,000.00.
mailto:Lisa.Pallesen@dot.ca.gov
C. The estimated contract term is three (3) years.
D. Interviews will be held via WebEx on February 4, 2025.
Confirmation letters will be sent to those firms short-listed.
E. The most highly qualified consulting firm will be required to submit an electronic copy of the financial documents listed on the appropriate Financial Documents Submittal Checklist available on the AE Contract Information website. The most highly qualified consulting firm will be notified of their selection and receive instructions for the electronic submission of the financial documents.
The most highly qualified consulting firm must submit a complete financial documents package no later than four (4) days after notification of selection. The prime consultant must submit the complete financial documents package in order for Caltrans to have the information necessary to engage in negotiations. The prime consultant is solely responsible for timely and complete submission of financial documents on behalf of the entire proposed team; financial documents will not be accepted from proposed subconsultant firms. Failure to submit a complete financial documents package by the specified due date may result in termination of negotiations with the most highly qualified consulting firm.
F. Negotiations will be held with the top-ranked firm by teleconference/WebEx during the week of March 10, 2024. The fee for profit shall be 10.5 percent, and the escalation shall be as follows:
Year Period Escalation
1 01/17/2025 - 01/31/2026 2.08% 2 02/01/2026 - 01/31/2027 4.17% 3 02/01/2027 - 01/31/2028 4.17% 4 02/01/2028 - 03/25/2028 4.17%
Notes:
1. Partial year will only occur on the last year of the contract term. All other periods are full years.
2. Increases to the loaded billing rates after contract execution is not authorized for any reason per Article IV, Section 17 and Article XVI, Section 6 of the California Constitution.
G. The scheduled date to complete cost negotiations and submit final cost proposal is March 26, 2025.
H. Disadvantaged Business Enterprise Program
1. This solicitation and resultant Agreement is financed in whole or in part with federal funds and therefore subject to Title 49, Code of Federal Regulations, Part 26 (49 CFR 26) entitled "Participation by https://dot.ca.gov/programs/procurement-and-contracts/ae-contract-information
Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs." To ensure equal participation for Disadvantaged Business Enterprise (DBE) groups specified in 49 CFR 26.5, Caltrans specifies a contract goal for DBE participation. The required goal for DBE participation in this solicitation is not less than twenty percent (20%).
2. Only participation by certified DBEs will count toward the contract goal for this solicitation. In order to count toward a contract goal, a firm must be certified as a DBE by the California Unified Certification Program (CUCP) and possess the NAICS and work codes applicable to the type of work the firm will perform on the Agreement by the SOQ submittal due date. NAICS and Work codes are provided by the Office of Civil Rights website.
3. It is the proposer’s responsibility to verity that the DBE firm is certified as a DBE by the specified SOQ submittal due date and time. The list of DBEs certified by the CUCP are located on the Office of Civil Rights website.
4. A DBE must perform a commercially useful function (CUF) for the type of work it will perform on the Agreement as provided in 49 CFR 26.55I(1)-(4). A DBE performs a CUF when it is responsible for the execution of a distinct element of the work of the Agreement and is carrying out its responsibilities by actually performing, managing, and supervising the work involved.
5. See “Statement of Qualifications Submittal Instructions and General Contract Process Information” for detailed information and references to the required forms. Required forms will be made a part of the Agreement. Failure to meet the DBE goal or Good Faith Effort requirements and provide required DBE participation at due date and time of SOQ submittal may result in the SOQ submittal being rejected as non-responsive.
H. Federal and/or State prevailing wage rates may apply. This requirement, if applicable, will be specified in the draft Agreement. See SOQ Submittal Instructions, Section I., H. regarding the California Department of Industrial Relations (DIR) Consultant/Contractor Registration Program on the AE Contract Information website.
I. Caltrans does not guarantee, either expressly or by implication, that any work or services will be required under any contract issued as a result of this RFQ.
J. A Pre-award or Post-award Audit will be performed on any contract issued as a result of this RFQ.
K. Contract boilerplate can be obtained on the AE Contract Information website.
L. Pursuant to Executive Order (EO) N-6-22 issued March 4, 2022, persons identified in the list established by the US Department of the https://dot.ca.gov/programs/civil-rights https://dot.ca.gov/programs/civil-rights https://dot.ca.gov/programs/civil-rights
Treasury are ineligible to bid on, submit a proposal for, enter into, or renew any Agreement with the State for any goods and/or services.
Any person who submits a bid or proposal to Caltrans certifies that it is not identified in the most current lists located https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions.
If applicable, any person who submits a bid or proposal to Caltrans certifies that its subcontractors are not identified in the most current lists located https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions
M. Pursuant to Executive Order N-12 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting
1. The State of California seeks to realize the potential benefits of
GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
2. Bidder / Offeror / Contractor must notify the State in writing if their solution or service includes, or makes available, any GenAI including GenAI from third parties or subcontractors.
3. The State has developed a GenAI Reporting and Factsheet (STD 1000) to be completed by the Bidder / Offeror / Contractor.
4. Failure to submit the GenAI Reporting and Factsheet (STD 1000) will result in disqualification of the Bidder / Offeror / Contractor.
5. Failure to report GenAI to the State may void any resulting contract.
The State reserves its right to seek any and all relief it may be entitled to as a result of such non-disclosure.
6. Upon receipt of a Bidder / Offeror / Contractor GenAI Reporting and Factsheet (STD 1000), the state reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the state.
II. SCOPE OF WORK/DELIVERABLES
The work to be performed for this RFQ is described in the Scope of Work/Deliverables and is hereby incorporated as Attachment 1.
III. CONFLICT OF INTEREST
A. Conflicts of interest may occur due to direct or indirect financial or business interests in the work to be performed or in any real property acquired for such project. Conflicts of interest can include, but are not limited to, past, existing or planned activities or because of relationships with other persons or firms. If there is a conflict of interest, the proposed team, including both the prime consultants and subconsultants, and individual employees of team members would actually or potentially be unable to render impartial assistance or advice to Caltrans. The proposer’s objectivity or availability in https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://home.treasury.gov/policy-issues/financial-sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std1000.pdf https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std1000.pdf performing the contract work may be impaired due to actual or potential conflicts of interest.
B. If the proposed team determines that any actual or potential conflicts of interest exists, it must identify and describe in detail each conflict of interest to Caltrans, using the Disclosure of Potential Conflict of Interest Form, which can be found on the AE Contract Information website. Along with the description of the actual or potential conflicts of interest, the proposed team shall also offer measures to avoid, neutralize, or mitigate all listed conflicts. The list of conflicts, including conflicts that apply to individuals as well as firms, and the mitigation measures on the Disclosure of Potential Conflict of Interest Form must be submitted as a separate section in the Statement of Qualifications.
Disclosure of information will not disqualify a proposed team from competing for a contract. The existence of actual or potential conflicts of interest will be used as a criterion to evaluate team availability during the evaluation and selection process. Caltrans reserves the right to terminate negotiations with the first selected firm and begin negotiations with the next selected firm or to cancel the procurement prior to execution if Caltrans learns that the selected team failed to disclose any actual or potential conflicts, which it knew or should have known about, or if the proposed team provided or omitted information on the disclosure form that results in the information being false or misleading.
C. After award, conflict of interest guidelines and policies shall continue to be monitored and enforced by the Caltrans Contract Manager.
Additional information about Conflict-of-Interest issues can be found in the SOQ Submittal Instructions and General Contract Process Information document (Section V. Post Government Employment Restrictions and Section VI. Conflict of Interest Concerning Consultant(s)) found on the AE Contract Information website (see link below). The State and Federal contract boilerplates on DPAC’s website also contain information on conflict-of-interest issues (Exhibit D) and can be found on the AE Contract Information website (see link below).
D. The prime consultant and subconsultants may be proposed on SOQs for other Caltrans A&E on-call contracts; however, the Caltrans Contract Manager may prohibit work on specific project(s) where Caltrans determines that a conflict of interest exists.
IV. SUBMISSION OF STATEMENTS OF QUALIFICATIONS (SOQs)
A. IMPORTANT: Download “Statement of Qualifications Submittal Instructions and General Contract Process Information” from the AE Contract Information website (Dated Rev. 10/07/2020) .
Failure to follow these instructions may result in rejection of your SOQs.
B. SOQ Package Submittal Instructions Read instructions below carefully. You will be required to submit an electronic SOQ file to Sacramento.
1. The electronic submission of a single unprotected (i.e. not password protected) PDF file of the SOQ is required. The electronic submittal will be accepted until 10:00 a.m. on 01/17/2025. Hard copies of the SOQs are NOT required. Fax copies or copies transmitted by email will not be allowed.
2. You will be required to create a Novell Filr account with Caltrans.
Send an email message to the Contract Analyst, Lisa Pallesen, at Lisa.Pallesen@dot.ca.gov containing the information listed below for a link and instructions to complete the self-registration page and submit the SOQ electronically.
• Your firm’s name
• Your email address
• The solicitation number for which you would like to submit a SOQ The file name shall include the contract number, consultant name (max. 25 characters) separated by an underscore (_), ending with the “.pdf” extension.
Example A: 50A0694_JohnDoeConsulting.pdf Example B: 50A0694_aaa1234engineer.pdf
3. SOQ submittals will be considered non-responsive if the electronic submittal is not received by the date and time specified in this RFQ.
C. Request for RFQ Copies Copies of this RFQ may be obtained on the CaleProcure website.
mailto:Lisa.Pallesen@dot.ca.gov https://www.caleprocure.ca.gov/pages/index.aspx
Attachment 1
SCOPE OF WORK/DELIVERABLES
Roadway Design and related Project Development and Construction Services for Caltrans, North Region Division of Project Development, Office of Design, District 1
On-Call Contract
FOR ROADWAY DESIGN: (Roadway Design and related Project Development and Design Support Services during Construction)
A. Purpose of Work.
The Consultant shall perform consultation, research, professional and technical services required for Roadway Design and related Project Development and Construction Services on an “as-needed” basis to support the Department of Transportation (Caltrans), North Region Division of Project Development, Office of Design, District 1, development and construction of proposed Caltrans transportation facilities. The Caltrans Contract Manager shall assign specific work to the Consultant to assist the Caltrans work force through the issuance of Task Orders describing in detail the services to be performed.
The Consultant shall only perform work that is assigned in an authorized Task Order.
The Contract does not guarantee that a Task Order shall be issued. The Consultant may provide services to Caltrans including, but not limited to, Engineering Studies producing Project Development and Design products and deliverables to support the preparation of the Project Report (or Project Report equivalents), Project Approval report, developing Design Plans, Specifications and Estimates (PS&E); support to the Office Engineers during project Advertisement and Award; project history files; design support during the construction phase; as well as providing analytical and technical support to the Caltrans stafff, on an “as-needed” basis to support the Department of Transportation (Caltrans), North Region Division of Project Development, Office of Design, District 1
The Contract shall be Task Order driven and shall have a three (3) year duration, with Project Development related tasks performed within the first 36 months and Design Support for Construction related tasks to continue through the remaining duration of the Contract. No project development related tasks will be assigned after the first 36 months of the Contract.
1. Exclusion of Work.
The following disciplines are excluded from the Contract:
a. Traffic Engineering - includes traffic forecasting, traffic modeling, traffic studies, and development of Traffic Management Plans. Except for analysis for Design Decision Document collision analysis.
b. Environmental Studies - includes Preparation of Draft and Final Environmental Document and all permit activities to environmental agencies.
c. Structural Engineering - includes new or retrofit design of bridge or major building facility structures.
d. Geotechnical Engineering - includes all geotechnical testing, analysis, studies and reports. Except geotechnical material testing needed for StormWater and NPDES permits
e. Material Testing - field testing of any material for construction material testing. Except geotechnical material testing needed for StormWater and NPDES permits.
f. Land Surveying.
g. Right of Way Engineering.
h. Water Quality. Except for any storm water requirements for mitigation.
i. Visual Impact Analysis.
j. Architecture.
k. Existing Design Support - The Consultant shall not provide support for any elements designed by other consultants.
l. For additional exclusions refer to "Location of Work".
The Consultant shall provide support when Caltrans lacks the expertise or available resources. All design tasks including, but not limited to, reviewing Project Initiation Documents (PID) reviewing and completing Project Reports (PR), providing technical reports, completion of sections or entire plans for Plans Specifications and Estimates (PS&E) Constructability Reviews and comment resolution, or functional design, may be assigned as work under the Contract.
B. Location of Work.
The work shall be performed on projects to improve the State transportation system throughout the counties of Del Norte, Humboldt, Mendocino, and Lake in California For the North Region Division of Project Development, Office of Design, District 1. The specific location within the above-described geographical limits of the work to be performed within this geographic area shall be identified in each Task Order. It may become necessary for Caltrans, North Region Division of Project Development, Office of Design, District 1, projects to extend into another adjoining District 2 or 3 County line.
Certain California County projects may also require studies/work that extends into adjacent counties adjoining Caltrans' District 1 outside of the boundary of Caltrans’
District1. In some instances, data collection may involve regional analysis beyond the counties identified or into adjoining states to properly assess the context and intensity of impacts to the concerned resources. In such instances, the project work shall not extend more than a thirty (30)-mile radius from the District/County, North Region Division of Project Development, Office of Design, District geographic boundary. These services shall be required to be provided domestically within the continental U.S.A. as well as internationally. The Consultant shall be capable of delivering the Roadway Design and related Project Development and Construction Services primarily in the USA. Roadway Design and related Project Development and Construction Services may be required at international locations. The Consultant shall be capable of performing Roadway Design and related Project Development and Construction Services at international locations if needed. The Roadway Design and related Project Development and Construction Services work shall be performed at North Region Division of Project Development, Office of Design, District 1Office.
The Lask Change Grade Project (EA 01-0F820) is intended to be a CMGC project and outside the intent of thie contract and will be excluded from the Contract. If it is determined in the future that there is a need for professional services assistance for this project then it will be determined at that time if a new contract will be needed or TO will be appropriate.
C. Required Services.
1. Pursuant to an authorized Task Order, the Consultant shall provide Roadway Design and related Project Development and Construction Services within the geographical jurisdiction of the Contract set forth in “Location of Work” Section, and all necessary personnel, material, transportation, lodging, instrumentation, and the specialized facilities and equipment necessary to satisfy all appropriate agencies and required to ensure compliance with all applicable Federal, State, and Local statutes, laws, codes, regulations, policies, procedures, ordinances, standards, specifications, performance standards, and guidelines, applicable to the Consultant's services and work product. The Consultant shall assist Caltrans, North Region Division of Project Development, Office of Design, District 1, to perform preliminary engineering, prepare draft and final project reports, and produce a plan by developing a complete and biddable Plans, Specifications and Estimate (PS&E) package.
2. Provided in Attachment 1A is a list of proposed Caltrans projects; North Region Division of Project Development, Office of Design, District 1, however, this list is not exclusive and it does not constitute a commitment that the projects will be initiated or completed or work assigned to the Consultant. Caltrans reserves the right to add or delete from this list of projects that are within the geographical jurisdiction of the Contract set forth in “Location of Work” Section within the North Region Division of Project Development, Office of Design Program, District 1’s jurisdiction.
Caltrans intends to utilize the Contract to complete a specific piece of work as long as it is located within the geographical jurisdiction of the Contract set forth in the “Location of Work” for each of the projects listed in the Contract utilizing the services described in this Scope of Work and as described in a Task Order. In the future, Caltrans may find it necessary to create a separate contract (or contracts) that involves a specific project listed in the Contract and includes part of the work contained in the Contract. Caltrans reserves the right to procure Architectural and Engineering (A&E) services involving the listed projects or unlisted projects (within the geographical jurisdiction of the Contract set forth in “Location of Work” Section) involving in whole or in part the same work using a project-specific agreement if the schedule to complete performance of the specific project extends beyond the term of the Contract or the cost to complete the specific project exceeds the dollar balance remaining in the Contract after accounting for amounts due to the Consultant for work previously performed and for work that is scheduled to be performed in executed task orders.
Should a project-specific agreement be procured under these provisions, the parties mutually agree that, in accordance with Exhibit D, Section III, Termination of the Contract, Caltrans shall terminate for convenience the portion of the Contract that includes the common scope of work identified in the project-specific agreement per Exhibit D, Section III, Termination of the Contract. Such partial termination for convenience shall be processed by amendment to the Contract. Unless otherwise required by law, regulation, or Caltrans policy or procedure, the Consultant may compete for these project-specific Contracts.
3. In the Contract is a list of proposed personnel classifications for which services are anticipated to be needed by Caltrans during the term of the Contract; however, this is not an exclusive list of the personnel classifications of Roadway Design and related Project Development and Construction Services that may be requested. Caltrans reserves the right to add/or delete personnel classifications from this list. Consultant personnel will work under the general direction of a Caltrans Senior.
Project ManagerProject EngineerAssistant Project EngineerLandscape Architect Engineering Technician Draftsman
4. Consultant agrees that:
a. The Consultant Contract Manager or designee shall manage, instruct and supervise all Consultant employees and subcontractors, and shall not allow any other party to manage, instruct and supervise such parties.
b. Consultant shall employ and discharge its own employees and subcontractors.
c. Unless approved in writing by the Caltrans Contract Manager, Consultant shall not hire employees or subcontractors to exclusively and only work on Caltrans matters. Consultant may hire employees and subcontractors for a specific Caltrans matter provided such party has the skills and knowledge to work on other matters and they are assigned to other matters from time to time.
d. The work performed by Consultant, its employees and its subcontractors shall be a regular part of Consultant’s regular and established business.
e. Consultant shall make all of its own business (including personnel) decisions and bear the risk for its decisions.
f. Consultant shall provide its own tools, equipment and supplies, and Consultant shall not rely on Caltrans to provide such tools, equipment and supplies. Notwithstanding the foregoing, Caltrans may, during the term of the Agreement, allow Consultant to access selected items of equipment;
provide non-employee userids and related access to Caltrans computer systems to Consultant employees and subcontractors; and provide non-employee access cards and other such forms of identification to Consultant employees and subcontractors.
g. Consultant shall provide its own training to its employees and subcontractors, and Consultant shall not rely upon Caltrans to provide such training.
5. At the sole discretion of Caltrans, Consultant may be required to provide the required services on safety projects, emergency projects, Emergency Storm Damage Projects, excess parcel assessments, or other current/future transportation projects, including minor projects not listed above, except for those specially excluded above, within the geographical jurisdiction of the Contract set forth in “Location of Work” Section. However, the dollar value of the services not listed in the Contract shall not exceed 10% of the total value of services that are listed and performed in the Contract.
6. The potential projects may vary in scope and size, and may encompass any type of improvement for the State transportation system including, but not limited to, roadway rehabilitation, widening and/or realignment of existing facilities, relocation of existing facilities, and construction of new facilities. The project location, project limits, purpose, expected results, project deliverables, period of performance, project schedule, and scope of work to be performed shall be described in each Task Order.
7. Consultant shall be available, on two (2) days’ written notice:
a. To meet with Caltrans; to participate in internal Project Development
Team (PDT) meetings or other Caltrans meetings.
b. To attend public meetings (day and evening) where an expert is required.
c. To participate in any public hearings necessary for a Project.
d. To provide technical expertise on an “as-needed” basis.
8. Maintaining a stable work force is essential to the successful completion of Caltrans, North Region Division of Project Development, Office of Design, District 1,work. Consultant shall implement a personnel retention plan strategy and shall submit a written plan with the Statement of Qualification submittal.
9. The Consultant may be expected to spend time for extended assignments to perform A&E services at Caltrans offices close to the construction Contractor to expedite the review process. At the sole discretion and convenience of Caltrans, Caltrans may permit Consultant to use office space, office equipment (such as copiers, printers and telephones) and furniture at various Caltrans (field) offices on a short-term, temporary basis. Consultant will provide its own computers, office supplies, and related work materials. The Consultant, including its Subconsultants, shall include the Field Office Indirect Cost Rate in its cost proposals and use the Field Office Indirect Cost Rate in billing Caltrans for those personnel utilizing Caltrans’ (field) office facilities. The cost rates will reflect the Consultant’s lower costs where Caltrans provides office space, office equipment and furniture. If the Consultant, including its Subconsultants, does not currently have a Field Office Indirect Cost Rate, it will develop and use a Field Office Indirect Cost Rate to reflect an equitable distribution of allowable costs to the contract (as specified in 48 CFR 31.203(f)). When working on-site in the Caltrans Facilities, the Consultant shall adjust its hours to meet the business needs of Caltrans and shall generally work and be present during Caltrans building business hours (which are 8:00 a.m. - 5:00 p.m.). The business hours can be adjusted in different Task Orders.
10. The Roadway Design and related Project Development and Construction Services shall include, but not be limited to, tasks pertaining to Project Reports (PR), PS&E bidding documents, and other project delivery activities. Specific work in the following areas may be needed:
a. Independent Cost Estimating for PS&E or Project Report phase for all cost items in construction project(s), which may include the preparation of a critical path construction schedule that is used to determine the construction contract duration.
b. Americans with Disability Act (ADA) compliance for transportation facilities and right-of-ways, which includes work in site assessments, PR and PS&E.
c. Technical/Specification writing for PR, and PS&E phases.
d. Drafting services for PS&E or other project drawings for this project(s).
11. The Consultant shall assist Caltrans Office Engineer by providing answers to the bidders’ questions during advertisement and award phase.
12. If set forth in an authorized Task Order, the Consultant shall assist Caltrans, North
Region Division of Project Development, Office of Design, District 1, in reviewing the construction contractor’s Request for Information by performing independent modeling, analysis, and engineering studies during construction.
13. The Consultant shall assist Caltrans, North Region Division of Project Development, Office of Design, District 1, in reviews and approvals of all submittals from the construction contractor. The most current Caltrans Standard Specifications allow a minimum six (6) weeks of review time for Caltrans.
14. Where directed in a Task Order, the Consultant performs the following tasks:
a. Review all available existing documents (As-Built Plans, reports, and others).
b. Determine member properties and weight.
c. Prepare complete PS&E construction contract packages in English for a construction contract (or contracts) as directed by the executed Task Orders. The plan sheets shall be electronically prepared using the Caltrans Division of Design’s format. As-built record drawings shall be utilized to the maximum extent possible.
15. Perform Constructability Review: This task involves reviews of plans, special provisions, and construction sequencing. Review and approve plans and stage construction prepared by the construction contractor.)
16. The Consultant shall not provide details for construction contractor’s access and work areas, hauling and disposal methods, equipment, and other similar work items required solely for the construction contractor’s operations.
17. The Consultant shall be available to review and defend engineering calculations, application of engineering judgment, and operation of facilities constructed per the Consultant’s design in the event of claims or lawsuits arising out of the Consultant’s work connected with this project at the expense of the Consultant without further compensation.
18. The Consultant shall establish internal accounting methods and procedures acceptable to Caltrans for documenting and monitoring the Contract and individual Task Order costs.
19. The Consultant and Subconsultant personnel shall not meet, discuss, nor confer with the public, Caltrans personnel, Agency personnel, State personnel, Federal personnel or any person other than the Caltrans Contract Manager or Caltrans designee, and approved Consultant personnel. Any communications with any person, excluding the Caltrans Contract Manager or Caltrans designee and approved Consultant personnel, require prior written approval from the Caltrans Contract Manager.
20. When authorized by the Caltrans Contract Manager and required by a Task Order, the Consultant may establish direct contact for the purpose of obtaining information, expertise, and assistance in developing baseline data and resource inventories relative to the project OR assist with coordination to achieve compatibility with the concerns and requirements of Caltrans and other resource or regulatory agencies with, but not limited to: other consultants; other contractors; Federal, State, and Local resource and regulatory agencies; U.S.
Army Corps of Engineers; U.S. Fish and Wildlife Service; National Marine Fisheries Service; U.S. Forest Service; U.S. National Park Service; U.S.
Department Of The Interior Bureau of Land Management; Federal Highway Administration; California Department of Fish and Wildlife; California Fish and Game Commission; California Department of Parks and Recreation; California State Water Quality Control Boards; California State Water Resources Control Boards; California Regional Water Resources Control Boards; California Coastal Commission; Native American Heritage Commission; Regional Clearinghouse of the California Historical Resources Information System; Regional Water Quality Control Boards; other involved agencies; other agencies; institutions; researchers or groups; and others.
a. Caltrans shall provide prior written approval for, and may participate in, any and all contacts, intra-agency scoping meetings, or other meetings with resource or regulatory agencies to discuss the project, project impacts, project mitigation proposals, project mitigation, project compensation, project proposals. The Consultant shall maintain a record of all such contacts and shall transmit copies of these records to Caltrans, at a minimum, with the regular monthly progress reports.
b. The Consultant shall not commit Caltrans to any mitigation measures or mitigation compensation.
c. The Consultant shall not negotiate or make decisions in Caltrans' name.
Caltrans shall retain responsibility for initiating and managing all final consultation, both informal and formal, with other consultants; other contractors; Federal, State, and Local resource and regulatory agencies;
and other involved agencies, regarding regulatory, project, project impacts, project mitigation proposals, project mitigation, project compensation, project proposals, and any issues. The Consultant shall be available (within two (2) working day(s) written notice) to provide advice and to participate in such consultations as required in each Task Order, as directed by the Caltrans Contract Manager in coordination with the Caltrans Task Order Manager, and at the request of Caltrans. Should specific permits or agreements be required, Caltrans may require the Consultant to prepare appropriate information.
21. The Caltrans Contract Manager shall decide the manner in which the coordination of individual matters is undertaken. At the Caltrans Contract Manager’s option in coordination with the Caltrans Task Order Manager, such coordination may be performed by the Consultant’s direct contact personnel, by the Consultant acting on behalf of Caltrans, or by Caltrans only. When coordination efforts require agreements, such agreements shall be obtained by Caltrans.
D. Workplan Standards Guide Codes.
Task Orders are based on the Caltrans Workplan Standards Guide (WSG). The latest WSG is found in the Guide to Project Delivery Workplan Standards Guide, which is available from the Caltrans’ Publication Unit and on the Internet at http://www.dot.ca.gov/hq/projmgmt/guidance.htm. The WSG references the Work Breakdown Structure (WBS) categories, which are potential and related work activities applicable to the Contract. The WGS references WBS categories which present the potential and related work activities that the Consultant may be required to perform. All revisions to the current version of the Work Breakdown Structure (WBS) shall apply during the life of the Contract.
The WBS activities below applicable to the Contract are limited to those set forth below:
160 Perform Preliminary Engineering Studies and Draft Project Report
160.05 Updated Project Information
160.05.05 Approved PID Review
160.05.10 Geotechnical Information Review
160.05.15 Materials Information Review
160.05.20 Traffic Data and Forecasts Review
160.05.25 Geometrics Review
160.05.30 Project Scope Review
160.05.35 Project Cost Estimate Review
160.05.99 Other Project Information Products
160.10 Engineering Studies
160.10.10 Traffic Forecasts/Modeling
160.10.15 Geometric Plans for Project Alternatives
160.10.20 Value Analysis
160.10.25 Hydraulics/Hydrology Studies
160.10.30 Highway Planting Design Concepts
160.10.35 Traffic Operational Analysis
160.10.40 Updated Right of Way Data Sheet
160.10.45 Utility Locations Determined for Preliminary Engineering
160.10.50 Railroad Study
160.10.55 Multi-modal Study
160.10.60 Park and Ride Study
160.10.65 Right of Way Relinquishment and Vacation Study
http://www.dot.ca.gov/hq/projmgmt/guidance.htm
160.10.70 Traffic Studies
160.10.75 Updated Materials Information
160.10.80 Updated Geotechnical Information
160.10.85 Structures Advance Planning Study (APS) (See Note 1)
160.10.90 High Occupancy Vehicle Report
160.10.95 Updated Preliminary Transportation Management Plan
160.10.99 Other Engineering Studies
160.15 Draft Project Report
160.15.05 Cost Estimates for Alternatives
160.15.10 Fact Sheet for Exceptions to Design Standards
160.15.15 Approved Exceptions to Encroachment Policy
160.15.20 Draft Project Report
160.15.25 Draft Project Report Circulation Review and Approval
160.15.99 Other Draft Project Report Products
160.20 Engineering and Land Net Surveys
160.20.25 Existing Records
160.20.30 Land Net Surveys
160.20.35 Land Net Map
160.20.40 Right of Way Engineering Products
160.20.50 Control Surveys
160.20.55 Photogrammetric Maps and Products
160.20.60 Engineering Surveys
160.20.65 As-Built Centerline Surveys
160.20.70 Pavement Surveys
160.30 Environmental Study Request (ESR)
160.30.05 Maps for ESR
160.30.10 Surveys and Mapping for Environmental Studies
160.30.15 Property Access Rights for Environmental/Engineering Studies
160.40 NEPA Assignment
160.45 Base Maps and Plan Sheets for Project Initiation Documents 165 Perform Environmental Studies and Prepare Draft Environmental
Document (DED)
165.05 Environmental Scoping of Alternatives Identified for Study in PID
(Project Initiation Document)
165.05.05 Project Information Review
165.05.10 Public and Agency Scoping Process
165.05.15 Alternatives for Further Study
165.10 General Environmental Studies
165.10.20 Visual Impact Assessment and Scenic Resource Evaluation
165.10.35 Water Quality Studies
165.10.45 Summary of Geotechnical Report
165.10.60 Location Hydraulic and Floodplain Study Report
165.15.15 Resource Agency Permit Related Coordination
165.20.05.20 Field Survey
165.20.15.25 Phase II Report
165.20.20.05 Preliminary Area Of Potential Effects/Study Area Maps for
Architecture
165.20.25.05 Final Area Of Potential Effects/Study Area Maps
170 Permits, Agreements, and Route Adoptions during PA&ED
Component (Project Approval & Environmental Documentation)
170.05 Required Permits
170.10 Permits
170.10.05 U.S. Army Corps of Engineers Permit (404/10)
170.10.10 U.S. Forest Service PLACs
170.10.15 U.S. Coast Guard PLACs
170.10.20 Department Of Fish and Wildlife 1600 Agreement(s)/2080.1/2081
Permit(s)
170.10.25 Coastal Development Permit
170.10.30 Local Agency Concurrence/PLACs
170.10.40 Waste Discharge (NPDES) Permit(s)
170.10.45 U.S. Fish and Wildlife Service/National Marine Fisheries Service
Approval
170.10.50 Regional Water Quality Control Board 401 Permit
170.10.95 Other PLACs
170.15 Railroad Agreements
170.15.25 PUC Exhibits and Application
170.15.99 Other Railroad Agreement Products
170.20 Freeway Agreements
170.20.05 Draft Freeway Agreement
170.20.10 Draft Freeway Agreement Review
170.20.15 Final Freeway Agreement
170.20.20 Executed Freeway Agreement
170.20.99 Other Freeway Agreement Products
170.25 Agreement for Material Sites
170.30 Executed Maintenance Agreement
170.40 Route Adoptions
175 Circulate Draft Environmental Document and Select Preferred
Project Alternative
175.05 DED Circulation
175.05.99 Other DED Circulation Products
175.10 Public Hearing
175.10.05 Need for Public Hearing Determination
175.10.10 Public Hearing Logistics
175.10.15 Displays for Public Hearing
175.10.20 Second Notices of Public Hearing and Availability of DED
175.10.25 Map Display and Public Hearing Plan
175.10.30 Display Public Hearing Maps
175.10.35 Public Hearing
175.10.40 Record of Public Hearing
175.10.99 Other Public Hearing Products
175.15 Public Comment Responses and Correspondence
175.20 Project Preferred Alternative
180 Prepare and Approve Project Report and Final Environmental
Document
180.05 Project Report
180.05.05 Updated Draft Project Report
180.05.10 Approved Project Report
180.05.15 Updated Storm Water Data Report
180.05.99 Other Project Report Products
180.10 Final Environmental Document
180.10.05 Approved Final Environmental Document (FED)
180.10.05.05 Draft Final Environmental Document Review
180.10.05.10 Revised Draft Final Environmental Document
180.10.05.55 Floodplain Only Practicable Alternative Finding
180.15 Completed Environmental Document
180.20 NEPA Assignment
185 Base Maps and Plan Sheets for PS&E Development
185.05 Updated Project Information
185.05.05 Project Concept Review
185.05.10 Updated Project Information
185.05.99 Other Updated Project Information Products
185.10 Surveys and Photogrammetric Mapping for Design
185.10.50 Control Surveys
185.10.55 Photogrammetric Maps and Products
185.10.60 Engineering Surveys
185.10.65 As-Built Centerline Surveys
185.10.70 Pavement Surveys
185.15 Preliminary Design
185.15.05 Roadway and Miscellaneous Design
185.15.10 Proposed Geometrics Review
185.15.15 Requests for Exceptions to Design Standards
185.15.20 Value Analysis
185.15.99 Other Preliminary Design Products
185.20 Engineering Reports
185.20.05 Updated Traffic Data Analysis and Forecasts
185.20.10 Hydrology and Hydraulic Reports
185.20.15 Geotechnical Design Report (GDR)
185.20.20 Pavement Design Report
185.20.25 Materials Report
185.20.30 Soundwall Design Report
185.20.35 Updated Transportation Management Plan for Design Phase
185.20.40 Utility Locations Determined for Design
185.20.99 Other Engineering Report Products
185.25 Right of Way Requirements Determination
185.25.05 Project Review with Affected Agencies
185.25.10 Fee and Easement Requirements Determination
185.25.15 Right of Way Requirements Maps
185.25.20 Final Railroad Involvement Determination
185.25.25 Water Well Abandonment Needs Determination
185.25.30 Utility Conflict Maps
185.30 Structure Site Plans (See Note 1)
185.30.10 Site Plans for Bridges and Structures (See Note 1)
185.30.15 Site Plans for Retaining Walls and Non-standard Earth Retention
Systems (See Note 1)
185.30.20 Site Plans for Soundwalls on Retaining Systems or Structures (See
Note 1)
185.30.25 Site Plans for Pumping Plants (See Note 1)
185.30.30 Site Plans for Special-Design Culverts (See Note 1)
185.30.99 Other Structure Site Plan Products (See Note 1)
185.99 Other Base Map And Plan Sheet Products \
200 Utility Relocation
200.15 Approved Utility Relocation Plan
200.20 Utility Relocation Package
200.25 Utility Relocation Management
200.30 Utility Close Out
200.99 Other Utility Relocation Products
205 Permits and Agreements during PS&E Component \
205.05 Required Permits
205.10 Permits
205.10.05 U.S. Army Corps of Engineers Permit (404/10)
205.10.10 U.S. Forest Service PLACs
205.10.15 U.S. Coast Guard PLACs
205.10.20 Department of Fish and Game 1600 Agreement(s)/2080.1/2080
Permit(s)
205.10.25 Coastal Development Permit
205.10.30 Local Agency Concurrence/PLACs
205.10.40 Waste Discharge (NPDES) Permit(s)
205.10.45 U.S. Fish and Wildlife Service/National Marine Fisheries Service
Approval
205.10.50 Regional Water Quality Control Board 401 Permit
205.10.60 Updated ECR (Environmental Commitments Record)
205.10.95 Other PLACs
205.15 Railroad Agreements
205.15.05 Plan Approval
205.15.10 Special Provisions and Insurance Clauses
205.15.15 Service Contract for Railroad Services
205.15.20 Construction and Maintenance Agreement
205.15.25 PUC Exhibits and Application
205.15.99 Other Railroad Agreement Products
205.25 Agreement for Material Sites
205.30 Executed Maintenance Agreement
205.45 MOU from Tribal Employment Rights Office (TERO)
205.55 NEPA Assignment
230 Prepare Draft PS&E (Plans, Specifications, and Estimates)
230.05 Draft Roadway Plans
230.05.05 Title Sheet
230.05.10 Typical Cross Sections
230.05.15 Key Map and Line Index
230.05.20 Roadway Layouts
230.05.25 Profile and Superelevation Sheets
230.05.30 Construction Details
230.05.35 Contour Grading Plans
230.05.40 Summary of Quantities Sheets
230.05.45 Noise Barrier Plans
230.05.50 Retaining Wall Plans
230.05.55 Standard Plans Selection
230.05.60 Stage Construction and Detour Plans or Traffic Handling Plans
230.05.65 Water Pollution Control Plans
230.05.70 Engineering Reports
230.05.70.05 Hydrology and Hydraulic Reports
230.05.70.10 Products Required To Ready Site for Subsurface Exploration
230.05.70.15 Geotechnical Design Report (GDR)
230.05.70.20 Pavement Design Report
230.05.70.25 Materials Report
230.05.99 Other Draft Roadway Plan Products
230.10 Draft Highway Planting Plans
230.10.05 Highway Planting Plans
230.10.15 Plant List
230.10.20 Irrigation Plans
230.10.30 Irrigation Quantity Sheets
230.10.99 Other Draft Highway Planting Plan Products
230.15 Draft Traffic Plans
230.15.05 Signing and Pavement Delineation Plans
230.15.10 Construction Area Signs Plans
230.15.15 Traffic Electrical Plans
230.15.99 Other Draft Traffic Plan Products
230.20 Transportation Management Plan
230.25 Draft Utility Plans
230.25.05 New Facility Plans
230.25.10 Utility Relocation Plans
230.25.99 Other Draft Utility Plan Products
230.30 Draft Drainage Plans
230.35 Draft Specifications
230.35.05 Roadway Specifications
230.35.10 Highway Planting Specifications
230.35.15 Traffic Specifications
230.35.20 Electrical Specifications
230.35.25 Utility Specifications
230.35.30 Hydraulic Specifications
230.35.35 Water Pollution Control Specifications
230.35.40 Erosion Control Specifications
230.35.99 Other Draft Specification Products
230.40 Draft PS&E Quantities and Estimates
230.40.05 Roadway Quantities and Estimates
230.40.10 Highway Planting Quantities and Estimates
230.40.15 Drainage Quantities and Estimates
230.40.20 Traffic Quantities and Estimate
230.40.25 Electrical Quantities and Estimates
230.40.30 Utility Quantities and Estimate
230.40.35 Water Pollution Control Quantities and Estimates
230.40.40 Erosion Control Quantities and Estimates
230.40.99 Other Draft PS&E Quantities and Estimates Products
230.55 Structures Draft PS&E Incorporation
230.60 Updated Project Information for PS&E Package
230.60.05 Updated Storm Water Data Report (SWDR)
230.60.10 Other Reviews and Update of Project Information
230.90 NEPA Assignment
230.99 Other Draft PS&E Products
235 Mitigate Environmental Impacts and Clean up Hazardous Waste
235.05 Environmental Mitigation
235.05.20 Environmental Mitigation Right Of Way Work
240 Draft Structures PS&E (See Note 1)
240.50 Overall Draft Structures PS&E
240.60 Hydraulics Report
240.75 Draft General Plans
240.85 Draft Structure Plans
250 Final Structures PS&E Package (See Note 1)
250.50 Project Review
250.55 Final Structure Plans
250.60 Final Structure Special Provisions and Cost Estimate
250.75 Structure Resident Engineer Pending File
255 Circulate, Review, and Prepare Final District PS&E Package
255.05 Circulated & Reviewed Draft District PS&E Package
255.10 Updated PS&E Package
255.10.05 Updated Roadway PS&E
255.10.10 Updated Highway Planting PS&E
255.10.15 Updated Traffic PS&E
255.10.20 Updated Hydraulic PS&E
255.10.25 Updated Technical Reports
255.10.30 Updated Utility PS&E
255.10.35 Updated Electrical PS&E
255.10.99 Other Updated PS&E Products
255.15 Environmental Re-evaluation
255.20 Final District PS&E Package
255.20.05 Reviewed Plans for Drafting Standards Compliance
255.20.10 Final Structures Specifications and Estimate Incorporated into
Final District PS&E
255.20.15 Request For Funds
255.25 Geotechnical Information Handout
255.30 Materials Information Handout
255.35 Construction Staking Package and Control
255.35.10 Construction Staking Package
255.35.20 Project Control for Construction
255.40 Resident Engineer’s Pending File
255.45 NEPA Delegation
255.50 Secured Lease for Resident Engineer Office Space or Trailer
255.55 Contractor Outreach
255.65 Right of Way…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .