This document is a Unidirectional Flushing (UDF) Guide for Water Distribution Systems developed by the U.S. Air Force, specifically the Tulsa District Corps of Engineers and AFCEE/TDN, dated April 2012. The comprehensive guide provides a detailed, step-by-step methodology for systematically flushing water distribution systems to improve water quality, remove sediment and biofilm, and maintain the efficiency of water infrastructure.
The guide outlines a 28-step process divided into four main phases: Planning, Field Work Flushing, Field Work Post-Flushing, and Post-Flushing. Key objectives include preparing a UDF plan, identifying water system maps and entry points, inspecting valves and hydrants, measuring pre-flush turbidity, positioning workers and equipment, executing controlled flushing sequences, monitoring water quality during flushing, recording data, and reviewing lessons learned. The methodology emphasizes careful valve and hydrant operations, maintaining minimum flow velocities (5 ft/sec), monitoring system pressure, and minimizing disruption to water service. The document includes multiple appendices with forms, reference materials, and example notifications to support implementation of the unidirectional flushing process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 03b. ERDC-CERL TR-20-1.pdf | ||
| 03. FTQW241400, Flushing Prgm Plan Dev., draft SOW Rev 1, 16 Jul 25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U W
Unidir Water rectio r Dist
Tul onal F tribut sa District, Cor
Flush tion S rps of Enginee hing ( Syste rs and AFCEE/
(UDF
ems
/TDN
F) Gu
April 2012 ide foor
Table of Contents Unidirectional Flushing (UDF) Guide for Water Distribution Systems i W192BV-10-D-2006, Task Order 003
Table of Contents Preface Introduction Flushing a Distribution System UDF Plan UDF Sequences Frequency of Conducting a UDF
Step-by-Step Guide for Unidirectional Flushing of a Water Distribution System
Appendix A UDF Forms
Appendix B References and Additional Information
Appendix C Example Notification of Distribution System Flushing
Preface Unidirectional Flushing (UDF) Guide for Water Distribution Systems 1
Preface Introduction The purpose of this guide is to provide water practitioners a methodology to implement an effective Unidirectional Flushing (UDF) plan. A UDF plan, as opposed to routine water main flushing, is a process of closing valves and opening hydrants to direct clean water down a single water main, thus creating a velocity that can scour the pipe and remove sediments from the bottom of the pipe. A UDF process can:
• Improve water quality
• Improve carrying capacity of pipes
• Benefit the operation of the water system
A UDF plan identifies the general sequence of pipes to be flushed, the specific sequence of valve operations, and the estimated duration of each flushing sequence.
This document is aimed primarily at base Water Shop personnel who are responsible for the hands-on maintenance of the water distribution system.
This preface includes a general description of a UDF plan and the reasons for conducting it. Following this preface is a step-by-step guide for conducting a UDF plan at Air Force bases. Following the step-by-step guide are appendices that include references and additional information and an example notification of distribution system flushing.
A Microsoft Excel file associated with this UDF guide can be found at:
https://cs.eis.af.mil/a7cportal/eDASH/Web% 20Part%20Pages%20%20Programs/Water %20Quality.aspx. Go to Documents, Resource Type: Tools
Flushing a Distribution System A variety of water quality problems that occur in a distribution system can be, at least partially, addressed by distribution system flushing. For example, the American Water Works Association Research Foundation (AwwaRF) maintained that once taste and odor problems are encountered, the only reasonable action is to bring better quality water into the area by extensive flushing.
AwwaRF also noted the importance of records to assist in identifying problem areas, documenting effectiveness of operations, and promoting good customer relations (AwwaRF 1992).
Water main maintenance should include flushing distribution mains for many reasons, including:
• Corrosion control
• Sediment and debris removal
• Taste and odor control
• Colored water
• High turbidity
• Low disinfectant residuals
• Bacteriological growth
• Customer complaints
The general objective of flushing is to assist in preserving and/or improving water quality and service.
Preface Unidirectional Flushing (UDF) Guide for Water Distribution Systems 2
Traditionally, distribution system flushing included opening hydrants without closing valves to isolate specific water mains for flushing. This traditional approach is referred to in this document as “conventional flushing.” Conventional flushing procedures involve flushing mains in areas where water quality complaints have occurred - a reactionary approach.
Conventional flushing procedures can also be system-wide, but no effort is made to assure that clean water is entering the pipe being flushed or that adequate velocities are being reached to scour the pipes.
Conventional flushing typically does not result in enough velocity to remove biofilm or to remove all sediment from the pipes.
Improvements in distribution system water quality may be marginal and short-lived.
Unidirectional flushing consists of isolating particular pipe sections, typically through closing appropriate valves and opening hydrants in an organized, sequential manner. Unlike conventional flushing, unidirectional flushing targets individual pipe segments to maximize flushing effectiveness. By isolating individual pipe segments, it is possible to consistently achieve scouring velocities of five feet per second (fps) or more that can effectively remove sediments and biofilm, which can accumulate in the water distribution system.
In addition, a UDF plan is organized such that each target pipe segment is flushed from a “clean” source. Complete unidirectional flushing of a water system ensures that every pipe segment is effectively cleaned.
UDF Plan A UDF plan should be developed for all Air Force water systems to maintain the cleanliness and efficiency of the piping network.
The most effective way to develop a UDF plan is to use a hydraulic computer model of the distribution system. Modeling software has provisions for developing flushing sequences and for calculating the volume of water and time needed for adequate flushing. The model can also calculate whether problems in the distribution system, such as low or negative pressure, may occur elsewhere in the system when a pipe is flushed.
A UDF plan can also be developed without a hydraulic computer model. This UDF guide is intended for bases that do not have a hydraulic model of the distribution system.
Developing a UDF plan will require a map of the system showing:
• Pipe locations
• Pipe diameters
• Valve and hydrant locations (with identification or numbering)
• Connections to flushing water sources, such as elevated storage tanks, pump stations, and connections to community water systems providing water for the base.
Advantages of a UDF Plan over Conventional Flushing:
• Improved flushing and scouring velocities
• Removes biofilm and sediment
• Flushes with clean water
• Overall cleaner distribution system
Preface Unidirectional Flushing (UDF) Guide for Water Distribution Systems 3
A strategy for flowing fresh water (from a well, water treatment plant, or city connection) through the system at adequate scouring velocities should be developed.
The methods outlined in this step-by-step guide can help expedite a manual process to find the most effective UDF plan.
The UDF plan will require trial and error to optimize the plan in the field.
UDF Sequences A UDF plan requires opening and closing certain valves, and opening flushing hydrants for each specific segment of main.
These segments are referred to as “flushing sequences.” The plan requires operating water system fixtures consistently according to the plan to ensure minimum flow velocities can be achieved and that no contamination of previously cleaned lines occurs (i.e., the plan must be followed in the order of the pre-defined steps).
The UDF plan consists of flushing logs, which are data tables describing the sequence (one flushing log for each sequence) and a map or maps showing the location of the sequence, valves to be closed and opened, and hydrant(s) to be flushed. To build a UDF plan, drawings are developed showing a system of flushing sequences to flush all pipes in the distribution system. The flushing logs also describe actions and guidelines for the flushing sequence, and outline the information to be collected by crews conducting the UDF plan.
The flushing logs have two purposes. First they provide UDF plan information. Second, they serve as a form to record field data.
The flushing sequences are grouped together into sequence groups. The sequence groups are created as a guideline for organizing and planning the UDF plan. It is estimated that each sequence group can be completed within approximately one day.
Frequency of Conducting a UDF The Unified Facilities Criteria (UFC), Operation and Maintenance: Water Supply System UFC 3-230-02 recommends conducting a flushing plan annually. The recommendation is based on a conventional flushing plan.
After a UDF plan has been successfully conducted for a few years, it may be possible to reduce the frequency to every two years or more because unidirectional flushing is more effective than conventional flushing.
Indicators could also be used to determine when the next UDF should be conducted.
Water system indicators could include:
• Low chlorine residuals
• Increase in THM or other disinfection byproduct concentrations
• Increase in the number of water quality complaints, such as discoloration, taste or odor.
• Increase in measured turbidity
• Increase in heterotrophic plate count
(HPC) concentrations
Step-by-Step Guide for Unidirectional Flushing of a Water Distribution System
Table of Contents Unidirectional Flushing (UDF) Guide for Water Distribution Systems
Table of Contents
Planning Step 1 Obtain Water Maps Step 2 Pre-Flush Turbidity Measurements Step 3 Inspect Valves and Hydrants Step 4 Prepare Flushing Sequence Plan Step 5 Locate and Operationally Test Flushing Valves and Hydrants .. 7 Step 6 Revise Flushing Sequence Plan Step 7 Prepare Flushing Forms Step 8 Pre-Flushing Notifications Step 9 Gather Tools and Supplies Step 10 Prepare Repair Contingency Plan
Field Work Flushing Step 11 Field Team Meeting Step 12 Flushing – Pre-Position Workers and Equipment Step 13 Set Up Dechlorination Equipment, If Needed Step 14 Verify Radio Communications Step 15 Verify Tank Water Depths and Pump Status Step 16 Sequence 1 – Isolate Appropriate Valves Step 17 Sequence 1 – Begin Flushing Step 18 Sequence 1 - Measure Color/Turbidity
Field Work Post-Flushing Step 19 Sequence 1 – Record Flushing Data Step 20 Sequence 1 – Remove Flushing Diffuser and Fasten Hydrant
Caps Step 21 Inspect for Landscape Damage and Debris Step 22 Sequence 2 – Open Previously Closed Valves Step 23 Repeat Steps 12 through 23 for Sequence 2
Post-Flushing Step 24 End of Day - Mark, Clean/Dirty Boundary Closed Valves with Orange Cones Step 25 End of Day - Provide Fire Department and Night Operator with Map of Temporary Closed Valves Step 26 End of Day - Notify Shop Supervisor and Customer Service .. 21 Step 27 End of Project Flush Dead end Mains and Unflushed Hydrant
Leads Step 28 End of Project - Review Lessons Learned
Figures Figure 1 Unidirectional Flushing Plan Flushing Plan Sequence Groups . 5 Figure 2 Unidirectional Flushing Plan Sequence 1-4
Tables Table 1 Flow Rate and Number of Hydrant Outlets Required to Flush Water Mains with 40 PSI of Pressure Table 2 Flushing Metrics for Pipes Table 3 Unidirectional Flushing Field Log Table 4 Estimating Volume of Water Needed for Flushing Sequence .. 10
Unidirectional Flushing (UDF) Guide for Water Distribution Systems
Steps for Flushing Program
Step 1 Obtain Water Maps pg 1
Step 2 Pre-Flush Turbidity
Measurements pg 2
Step 4 Prepare Flushing Sequence
Plan pg 4 pg 7
Step 5 Locate & Operationally Test Flushing Valves & Hydrants
Step 6 Revise Flushing Sequence
Plan pg 7
Step 7 Prepare Flushing Forms pg 8
Step 8 Pre-Flushing Notifications pg 11 pg 12
Step 9 Gather Tools & Supplies
Step 10 Prepare Repair
Contingency Plan pg 13
Step 3 Inspect Valves & Hydrants pg 3
Field Work Flushing
Step 12 Flushing – Preposition
Workers and Equipment pg 15
Step 14 Verify Radio
Communications pg 16 pg 16
Step 15 Verify Tank Water Depths and Pump Status
Step 17 Sequence 1 – Begin
Flushing pg 17
Step 18 Sequence 1 – Measure
Color/Turbidity pg 18
Step 13 Set Up Dechlorination Equipment, if Needed pg 16
Step 11 Field Team Meeting to discuss protocols, radio protocols, safety, & emergency procedures pg 14
Step 16 Sequence 1-Isolate
Appropriate Valves and Place Orange Cones to
Mark Closed Valve pg 16
Field Work Post-Flushing
Step 23 Repeat Steps 12 through
23 for Sequence 2 pg 20
Step 21 Inspect for Landscape Damage and Debris pg 20
Step 19 Sequence 1–Record
Flushing Data (i.e., flow rate, total gallons flushed, final turbidity, etc.)
pg 19
Step 22 Sequence 2-Open
Previously Closed Valves, Which Need to be Opened for Next Sequence pg 20
Step 20 Sequence 1-Remove Flushing Diffuser &
Fasten Hydrant Caps pg 20
Post-Flushing
Step 28 End of Project – Review
Lessons Learned pg 22
Step 26 End of Day – Notify Shop Supervisor and Customer
Service pg 21
Step 24 End of Day – Mark, Clean/Dirty Boundary Closed Valves with Orange
Cones pg 21
Step 25 End of Day – Provide Fire
Department and Night Operator with Map of
Temporarily Closed Valves pg 21
Step 27 End of Project – Flush Dead
End Mains and Hydrant Leads pg 21
1.
2.
3.
4.
Plann
Request G distribution
Maps shou system, inc
• Water m
• Isolatio
• Hydran
• Meters
• Entry p such as connec
• Identific hydran
Identify wh water is req agencies.
Identify are pressures are flowing distribution ing
GIS water sys n system.
uld show the cluding:
mains on valves nts points to the s wells, intak ctions to othe cation numb ts hether dechlo quired by the eas where lo may be a pr g, such as hi n system.
Ste stem maps f e water distri distribution kes, pump s er distributio bers for valve orination of f e state or lo ow water sys roblem when gh elevation
Unid W19 ep 1 for the bution system, stations, and on systems es and flushing cal stem n hydrants n areas in the directional Flushin
92BV-10-D-2006,
Obta Othe e
1. If v as
2. W an ng (UDF) Guide , Task Order 003 ain Wa er Impo
Tips valves and ssign numb ork with Ge ny changes for Water Distrib ater Ma ortant s hydrants a ers before p eoBase pers to GeoBas bution Systems aps and Informa re not num proceeding sonnel to m e.
d ation bered, g.
make
Step 2
Pre-Flush Turbidity Measurements
1. Measure turbidity at key locations in the distribution system with portable turbidity meters or visual methods using pre-prepared standards. Turbidity measurements should be done a week or two before flushing to represent pre-flushing conditions.
2. If possible, use turbidimeters to obtain the most accurate field data. However, visual methods, as described on this page, can also be effective.
3. Note locations where higher turbidities may be expected, such as dead end mains and in-line locations where lower turbidities may be expected.
4. The data will be useful in identifying problem areas where more extensive flushing may be necessary.
Visual Turbidity Measurements
Turbidity can be measured by visual observations and using pre-prepared standards. The methods and standards used are not as important as consistency.
Visual turbidity kits allow viewing of a sample in a clear jar and comparing turbidity to other jars with known turbidity. Another technique calls for the user to fill a beaker incrementally until an object on the bottom of the beaker is not legible. The amount of water in the beaker is directly related to the turbidity.
It is best to choose a standard that reports the turbidity measurement in standard units, such as nephelometric turbidity units (NTUs), which allows different standards to be used in the future.
Turbidity standards and testing tools for visual measurements are commercially available. Several examples are shown below:
http://www.benmeadows.com/refinfo/techfacts/tec hpdf/turbidity-1247.pdf http://www.hach.com/stablcal-turbidity-standards-calibration-kit-2100p-portable-turbidimeter-sealed-vials/product?id=7640202625&callback=qs http://www.dynamicaqua.com/turbidity.html#tube
Turbidity is the cloudiness or haziness of a fluid caused by individual particles – suspended solids.
Walk the d valve and h system ma
Use a meta
Note on the could not b
Note on the have been istribution sy hydrant loca ap.
al detector to e map hydra be field locat e map hydra added or ar ystem and c ations with th o help find b ants and valv ted.
ants and valv re shown inc
Unid W19 ep 3 compare he water buried valves ves that ves that correctly.
Insp s.
The r availa that c Mark with a ng (UDF) Guide , Task Order 003 pect Va
Tip result of St able/opera can be use on the ma an “X” or h for Water Distrib alves a tep 3 is a m able valves ed for the f ap those no highlight th bution Systems nd Hyd map showi s and hydra flushing pla ot availabl hem in col drants ng all ants an.
or.
5.
6.
7.
8.
9.
Using the m where flush system.
Develop a entry point periphery o
The intent flushed pip
Create a se sequence g sequences See the ex
If possible, sequence.
The individ valves to b to be flushe Identificatio valve and h during prio identified o
If a pump w during a flu to avoid pu (Flushing c and call for
Schedule f busy roads
Dead ends should be f plan.
map from St hing will occ
UDF plan th and progres of the distrib is to flow wa pes for the ne equence gro group should s that can be xample on Fi create a ma See the exa dual sequenc be opened an ed for that p on numbers hydrant. Pip r flushing se on the map ( will be isolate ushing seque umping again could drop w r a pump to flushing plan s during high s and unflush flushed at th tep 3, identif cur, if not the hat starts fro sses outwar ution.
ater through ext flushing oup map. Ea d be a serie e completed igure 1.
ap for each f ample on Fig ce maps sho nd closed, a particular seq are needed es that were equences sh colored or h ed from the ence, turn of nst a dead h water levels i run).
n to avoid flu h traffic times hed hydrant he end of the
Unid W19 ep 4 fy areas e entire m a water rd to the previously sequence.
ach s of flushing in one day.
flushing gure 2.
ould identify and hydrants quence.
for each e flushed hould be highlighted).
system ff the pump head n a tower ushing on s.
leads e flushing
Prep Plan g s
1. W
2. Pl th wa fo de so
3. If su to de
4. Av m la ef
5. Pl wa flu cl re be
6. Se of Ac lo Ex re
7. Ch flu th se
8. Th is of sp ne ng (UDF) Guide , Task Order 003 pare Fl n
Tips ater entry p
• Conne
• Wells
• Treatm
• Storag lan sequenc he system w ater and iso or a long du epending on ources).
tanks will b upply sourc o monitor ta epletion.
void flushin ains. The v rger main w ffectiveness lan to excha ater contain ushing sequ ear water a equired will eing flushed elect flushin f approxima ctual length ocations and xcessively l esult in loca hoose sequ ushing time hat flushing equence pip he amount o ongoing is f the day. Th pent plannin ext sequenc for Water Distrib lushing points can i ection to cit ment plant ge tanks ces such th will be soley olated from ration (1/2 d n water ava be isolated f ce, include p ank levels to ng larger ma velocity redu will decreas s of the sco ange 1.5 to ned in the p uence. The fter flushin depend on d.
ng of pipe s ately 1,600 f hs will depe d the water long seque alized floodi uences that es of 5 to 10 time is rela pe, diamete of time whe s approxima he remaind ng and prep ce.
bution Systems g Sequ nclude:
ty system hat no portio y reliant on an entry po day to 2 day ailability of from a true plan provis o prevent ains from s uction in th se the our.
2.0 volume pipe for the goal is to h g and the v the specifi sequence le feet or less.
end on valve system lay nce lengths ing.
will result 0 minutes. N ated to leng er, and volum en actual flu ately 15 per er of time is paring for th ence on of stored oint ys, ions smaller e es of have volume c pipe engths e yout.
s can in Note gth of me.
ushing rcent he
1. Using the identify v during flu
2. Field-che that the v and close
3. On the m cannot be annotatio that cann
4. Prepare A repair hy
5. If the dam needed f repairs p starts.
1. If valves located, o repaired flushing s
2. Allow flus valves an e UDF plan d valves and h ushing.
eck each val valves and h ed.
map, note va e operated a ons showing not be used f
AF Form 33 ydrants and v maged valve for the flushi erformed be required for or are not op in time for fl sequence pl shing withou nd hydrants.
developed in ydrants to b ve and hydr hydrants can lves and hyd and need re valves and for flushing.
2, work orde valves.
es and hydra ng plan, hav efore the flus flushing can perational an ushing, revis an.
ut using inop
Unidirec
W192BV
ep 5 n Step 4, e used rant to verify n be opened drants that pairs. Make hydrants er request, to ants are ve the shing plan ep 6 nnot be nd cannot be se the perable ctional Flushing ( V-10-D-2006, Tas
Loca Tes Hyd y o
Rev
Step all hy befor
UDF) Guide for W sk Order 003 ate and t Flush drants vise Flu
6 can be a ydrants and re starting
Water Distributio d Oper hing Va ushing avoided if t d valves a the UDF p on Systems rationa alves an
Seque the operati re verified process.
lly nd ence ion of
In
Sou Mai
Flow Rate Required t
Pipe Diameter ches (mm)
4 (100) 6 (150) 8 (200) 10 (250) 12 (300) 16 (400) urce: Unified Fa intenance: Wat
Plann
1. A flushing each flus should be map disc
2. Table 3, Log that UDF plan be comp
a. Sequ the p
b. Locat estim uppe flow i electr
c. Flush seque and c
3. The flush should be formula i flushing t two times The actu determin the field.
4. See Tabl estimatin
Table e and Numbe to Flush Wat (280 kPa) of
Flow gpm (lp
100 (6 200 (13 400 (25 600 (38 900 (57
1,600 (10 acilities Criteria ter Supply Syste g log form s shing sequen e used with cussed in Ste shown on P can be used
n. Portions o leted in adva uence numbe age.
tion, pipe dia mated flow ne r left area of s an automa ronic spread hing procedu ence of valv close in the c hing times ne e estimated.
n the electro time should s the volume al flushing ti ed by the wa les 1 and 2 f ng flows.
e 1 er of Hydrant ter Mains wit f Pressure
Numbe (65 mm
Ops)
6) 3) 5) 8) 7) 00) a (UFC), Operati em UFC 3-230-0 hould be de nce. The flus the flushing ep 4.
age 9, is a U d to plan and of the Field L ance, includ er and area ameter, pipe eeded for sc f the page. E ated formula dsheet.
ure identifyin ves and hydr center of the eeded for ea . This is an onic spreads remove app e of water in ime needed ater quality o for data to h
Unidirec
W192BV
t Outlets th 40 psi er of 2.5-in.
m) Hydrant
Outlets ion and ep 7 veloped for shing log sequence
UDF Field d record the Log, should ing:
at the top of e length, and couring in the Estimated a in the ng the rants to open e page.
ach segment automated sheet. The proximately the pipe.
will be observed in elp with ctional Flushing ( V-10-D-2006, Tas
Pipe (in f d e t
An MS forms
AFCE
https:
0Part% Qualit Type:
Minim 5 ft/se V= Q/A Q=flow A=Op V=Vel See A that s rates
5. Info flus fiel Log
6. Tab est flus an
UDF) Guide for W sk Order 003
Flus
Size n.)
Volu 100 ft
(g
8 2 0 4 2 5 6 1 8 1 0 1 pare Fl
S Excel file s and logs is EE website:
://cs.eis.af.m %20Pages% ty.aspx. Go Tools mum Flushin
ec. It can b A w rate pen area of p locity
Appendix A shows estim in various s ormation on shing water d during flus g (Table 3).
ble 4, on Pa timating the sh each seq electronic s
Water Distributio
Table 2 hing Metrics ume per
t. of Pipe gal.)
M
,044 ,322 ,632 lushing containing s available mil/a7cporta %20%20Pro o to Docum ng velocity e calculated pipe for velocity mated veloc size of pipe the flushing quality shou shing at the age 10, provi total volume uence. The preadsheet.
on Systems s for Pipes
Minimum Req Rate (gpm) t velocity of
1,25 1,80 2,40 3,15 4,00 4,90 g Form generic flu at the follow al/eDASH/W ograms/Wat ments, Reso should be d using the y conversio ity at variou es.
g hydraulics uld be record bottom of th ides a form u e of water ne e table is ava quired Flow to achieve 5 ft/sec.
s ushing wing
Web%2 ter%20 urces e format on table us flow and ded in the he Field useful for eeded to ailable as
1. Notify the ensure th each day
2. Notify the plan, incl for comp closed. T available
3. Notify wa flushing p should:
• Inclu com
• Warn wate
• Sugg bottl that
• Warn wher such
• Inclu prob flush
See App language
4. Remind t in the aff
5. Notify ba system (e specific).
e Water Sho he water sto y in advance e fire depart luding the pr pletion and w The closed v e fire flows in ater users (c plan. Notific ude the prop pletion.
n about pote er during the gest that the ed water for day.
n to avoid us re discolorat h as cooking ude a phone blems are ex hing plan.
endix C for e e.
the fire depa fected areas ase personne email proced op superinten rage tanks c e of the flush ment of the roposed time which valves valves will aff n the system customers) o cation to the posed time sc ential discolo e flushing pe ey may want r drinking an sing water fo tion may be or laundry.
number to c xperienced d example not artment and each day.
el using bas dures are ba
Unidir W192 ep 8 ndent, to can be filled hing plan.
flushing e schedule will be ffect m.
of the water users chedule for oration in the riod.
t to use d cooking o or purposes a problem, call if uring the tification water users e email ase – rectional Flushing
2BV-10-D-2006, T
Pre-
1. No he su
2. Th co Bi co al th ac g (UDF) Guide fo Task Order 003
-Flushi otifying wa elp ensure uccessful U he Civil En oordination ioenvironm onsider pro l Air Force hat may be ctivities.
or Water Distribu ng Not ater users an efficien
UDF plan.
ngineering n with the mental Eng oviding bo e personne affected b ution Systems tificatio in advance nt and
Squadron gineer, sho ottled wate el and fami by flushing ons e will
, in ould r for lies
1. Locate a including
• Diffus
• Hydra hydra
• Press for m distrib
• Pitot meas
• Two-w
• Oran valve
• Tools
(broo
• Dech
• If pos meth water
2. Prepare a Locate a the flushi Example
• Eye p
• Safet
• Safet regulation the water distributio nd organize g:
sers to direc ant wrenche ants sure gauges easuring pre bution syste meters or flo suring flow a way radios f ge traffic co es s for cleaning oms, shovels hlorination eq ssible, use tu ods describe r clarity.
a health and nd organize ing team, as s include:
protection ty boots ty vests
Cautio
Dechlorin is someti ns to remov being flus on system.
field equipm ct flow from h es for operat s to connect essures in th m ow test kits f at hydrants for each team nes for mark g up after flu s) quipment (if urbidimeters ed in Step 2 d safety plan safety equip s described i on!
nation equ imes requi ve chlorine hed from t
Unidirec
W192BV
ep 9 ment, hydrants ing the to hydrants he for m member king closed ushing needed) s or other to measure n (HASP).
pment for in the HASP ipment red by e from the ctional Flushing ( V-10-D-2006, Tas
Gat
P.
UDF) Guide for W sk Order 003 her To
Water Distributio ols and on Systems d Supp
Hydrant wrench
Small ba flow test (measur flow rate
Large ba flow test meter an diffuser
Pressure gauge fo measurin pressure elsewher the syste plies arrel t kit es e) arrel t nd e or ng es re in em
Plann
1. Have rep flushing e call readi
2. Have som from cust to respon
3. Decide, i hydrants repaired the field.
4. Operating frequentl including pipes, se closed or to other w pair crews on event and ha ily available.
meone avail tomers durin nd to make r n advance, encountere or if the UD g valves and y used, can g pressure su ervice lateral r partially clo water system n standby du ave a phone able to rece ng the flushi repairs.
if inoperable d during flus F plan will b d hydrants, t cause prob urges that m s, valves sti osed position m componen
Unidirec
W192BV
p 10 uring the e number to ive calls ng event an e valves and shing will be e modified in that are not lems, may damage cking in a n, or damag nts.
ctional Flushing ( V-10-D-2006, Tas
If the repai may n
Oth Probl often Witho probl neede
• Du
• Du re
UDF) Guide for W sk Order 003 pare R flushing c rs during t not be feas her Ben lematic va n discovere out UDF, m lems would ed:
uring a fire uring shut epairs to th
Water Distributio
Repair C crew must the flushin sible.
efits of lves and h ed during U many times d go unno e.
down, whe he distribut on Systems
Conting also make ng event, U f Flush hydrants ar UDF proce s, these ticed until en making tion system gency e
UDF
ing re ess.
m.
Ea sta
Field W Flush ach day, con arting the fie
1. Safety call.
2. Flushin comple
3. A detai and clo confirm not cut
4. If pump during pumps head.
5. Respon
• Wh
• Wh
• Wh
• Wh
• Wh com fire
Work duct a field t ld work. Disc plan and em ng plan and s eted that day led review o osing valves m that the pro off service t ps will be iso the flushing to avoid pum nsibilities for ho will open a ho will operat ho will record ho will monito ho will be res mmunicating department team meetin cussions sho mergency nu sequences t y.
of the order o for each seq oposed sequ to customers olated from t sequence, t mping again r each team and close va te the hydra d data, or pressures sponsible for g with the wa t.
Unidire W192B p 11 ng prior to ould include umbers to to be of opening quence to uence will s.
he system turn off nst a dead member -alves, nt, s, r ater shop an ectional Flushing BV-10-D-2006, Ta
Field e:
Follo “cont water
Verify availa
Avoid
(UDF) Guide for ask Order 003 d Team
Cau w sequenc taminating r mains.
y that adeq able in the d cutting o r Water Distributi m Meet ution!
ce plan clo g” previous quate wate water tow off service ion Systems ting osely to av sly flushed er for flush wer.
to custom oid d ing is ers.
Pri ap
B ior to starting propriate loc
1. Valves
2. Flowing
3. Other lo as pres distribu
4. At the w water le monito
5. Near th custom testing.
Before flus
1. View wh
2. If on a s water de
3. Discuss starting
4. Flow dir
• Traff
• Unst
• Vehi
• Foot
5. Schedu low. Av g flushing, p cations inclu to be closed g hydrant.
ocations dee ssure gauge ution system water system evels in the red.
he phone wh mers can be r p shing:
here water slope, think estination s how to ha g rection to a fic table lands cles t traffic le work wh void rush h position work uding:
d.
emed neces s at high po m control scr storage tank here compla received dur r will go k about ult andle traff avoid scape hen traffic hours.
Unidire W192B p 12 kers at ssary, such ints in the reen where ks can be ints from ring the timate ic before will be
Flus Wor shing – rkers a r Water Distributi
– Pre-p and Equ
O h h in
O to im a p t
In p m p id fl s ion Systems osition uipmen
On the flus hydrant, re hydrant cap nstall diffu
Orient diffu o minimize mpact on adjacent property an raffic.
nstall pres gauges at h points to he monitor low pressures dentified in lushing sequence p nt shing move p and user.
user e nd sure high elp w n the plan.
Step
Step
Set up Dechlo Equipm Neede
Verify Comm
Verify T Water and Pu
Seque Isolate Approp Valves
Unidire W192B orination ment, If d
Radio unication
Tank Depths ump Stat nce 1 – priate s ns tus
If y abi
If dechlorin needed, se equipment
Contact eac radio to con starting the
Call water s system con water is ava Verify all pu If pumps m pumps are If pumps ne pumps are
Using the U maps from appropriate Mark the cl and leave t are reopene
C you fail to re ility to fight r Water Distributi ation of flush t up the dec prior to flush ch team me nfirm commu flushing seq shop to chec ntrols to conf ailable in the umping equi ust be runni running.
eed to be tur off.
UDF plan an Step 4, ope e isolation va osed valves he cones in ed.
Caution eopen a val fires.
ion Systems hing water is chlorination hing each hy mber via two unications pr quence.
ck the water firm adequat e storage tan pment is wo ing, verify th rned off, ver d individual n and close alves.
s with orange place until t n!
lve, it may l s ydrant.
o-way rior to r te nks.
orking.
at the rify the sequence e cones the valves limit the
1. Verify d water a may be
2. Slowly surges system
3. Measu meter k flushing
4. Flushin low pre have be system
5. If low p immed minimu
6. Continu estimat water is diffuser is in away from tra e damaged.
open the hy and water h m.
re flow using kit, and conf g velocities h ng team shou essure proble een encount m.
pressures are iately throttle um of 20 psi g plan if 20 p ue flowing th ted duration g plan, or lon s clear as de
Ste place and w affic and pro ydrant to min hammer in th g pitot meter firm that ade have been re uld notify tea ems (less th tered in the e encounter e the hydran is restored o psi cannot b he hydrant fo described in nger, if need etermined in
Unidire W192B ep 17 will spray operty that nimize he water r or flow equate eached.
am leader if han 20 psi) distribution red, nt until a or stop the e restored.
or the n the ded, until the n Step 18.
Seq
Wate closin can c syste broke
Avoid distri press regul a pot water Monit point incre flush
(UDF) Guide for ask Order 003 quence shing
Cau r hammer, ng valves a cause dam em, such a en water he d reducing bution sys sures fall b atory requ ential back r notice, sa tor pressu ts and thro ase pressu ing if pres r Water Distributi
1 – Be ution!
caused by and hydra age to the s, water m eaters.
g water pre stem below below 20 ps uirements f kflow even amples, tes res at high ottle hydran ure, as nee sure cann ion Systems egin y opening nts too qu distributio main breaks essures in w 25 psi. If si, follow for addres nt (e.g. boil sting, ect.)
h elevation nt flow to eded. Stop ot be resto and ickly, on s and the f sing l n p ored.
Field Work Flushing
Step 18
Sequence 1 – Measure Color/Turbidity
1. Using a portable turbidity meter or visual method described in Step 2, measure turbidity at 1-minute intervals while the hydrant is being flushed.
2. Use the turbidity data to determine when to stop the flushing sequence. Make sure to note if flushing must go longer than planned to achieve clear water.
3. At completion of the test, slowly close the flushing hydrant to minimize surges/water hammer in the distribution system.
Pos
Flush
1. Reco Log p
2. Note Reco flushi
3. Note probl Log.
4. Confi and r next s
5. If field the flu
6. Data usefu future t-ord data on t prepared in S changes in ord the maxim ing and the t ing.
any unusua ems encoun irm all requir recorded bef sequence.
d changes w ing sequenc ushing log a collected an ul for prepari e years.
he Sequenc Step 7.
water quality mum turbidit turbidity at th al circumstan ntered on the red data was fore proceed were made to ces, note the and map.
nd recorded ng the UDF
Unidire W192B ep 19 ce 1 Flushing y and color.
ty during he end of nces or e Flushing s collected ding to the o the e changes on will be plan in
Seq
Histor usefu betwe
If turb greate histor may b
Pre-fl may i
Pre-fl every more
(UDF) Guide for ask Order 003 quence shing D ric data col l for evalua een unidirec bidity measu er or less th rical events be too long ush turbidit ndicate tha ush turbidit 6 months m frequent flu r Water Distributi
1 – Re Data lected and ating the req ctional flush ured during han experie s, the flushin or short.
ty measure t flushing c ty measure may indicat ushing.
ion Systems ecord recorded w quired frequ hing events g flushing is enced durin ng event int ments (Step can be delay ments take te the need will be uency s.
s g terval p 2) yed.
for
Field Work Post-
Step 20
Sequence 1 - Remove Flushing Diffuser and Fasten Hydrant Caps
• If needed, grease cap threads using food grade grease.
Step 21
Inspect for Landscape Damage and Debris
• Make necessary repairs, if possible, or record the damage and make arrangements for repairs at a later date.
Step 22
Sequence 2 – Open Previously Closed Valves
• Open previously closed valves, which need to be opened for the next sequence. Make sure to move orange cones, indicating that the valve is closed.
• Close valves necessary for the next sequence.
Step 23
Repeat Steps 12 through 23 for Sequence 2
Post-Flushing
Step 24
End of Day – Mark, Clean/Dirty Boundary Closed Valves with Orange Cones
• Identify which valves can and should remain closed overnight.
Step 25
End of Day - Provide Fire Department and Night Operator with Map of Temporarily Closed Valves
• Closed Valves affect available fire flow.
Step 26
End of Day – Notify Shop Supervisor and Customer Service
• Notify that work was completed and notify of work to be completed the following day.
• Notify of damage that needs to be repaired.
Step 27
End of Project – Flush dead end mains and unflushed hydrant leads to remove stagnant water from the system.
• Flushing unflushed hydrant leads allows all hydrants to be operated and confirms that all hydrants are working.
• In general, 6-inch hydrant leads should be flushed at a flow rate of 450 gpm for a minimum of 10 seconds for every 25 feet of hydrant lead. Each lead should be flushed at least 30 seconds.
Post-Flushing
Step 28
Review Lessons Learned
Conduct a meeting with the UDF planning and field team to discuss:
1. What went well and what did not go well.
2. Ways to improve the UDF plan.
3. How will the completed UDF plan’s effectiveness be evaluated? (Fewer water quality complaints, improved chlorine residuals, lower turbidity, lower heterotrophic plate counts.)
4. How will the system be monitored to determine when unidirectional flushing should be performed again?
5. Decide how to track information that will be useful for improving UDF plans in future years. (Store printed data? Store electronically?)
UDF Forms
Appendix A Unidirectional Flushing (UDF) Guide for Water Distribution Systems
This Appendix includes forms to aid with performing a UDF. Both hard copy ane electronic forms are provided.
1. Unidirectional Flushing Field Log - A blank form of Table 3 in the step-by-step guide. It can be copied and manually filled out or it is available electronically as an Excel spreadsheet.
2. Estimating Volume of Water Needed for Flushing Sequence. – This is a copy of Table 4 from the step-by-step guide. It can be copied and manually filled out or it is available as an Excel spreadsheet. If used electronically data should be entered in the white cells. The shaded cells contain formulas that will perform the calculations.
3. Velocity Conversion Table – This is a useful document for estimating the velocity in a pipe when flow rate and pipe size are known.
References and
Additional Information
Appendix B Unidirectional Flushing (UDF) Guide for Water Distribution Systems
References and Additional Information The following is a list of documents that were reviewed during this project, which provide sources for additional information. Additional information about unidirectional flushing can be found in the following documents.
1. Akridge, Angela; Anderson, Jerry; Gaus, Lisa; Niemann, Ted; A Partnership Crafts a Best Management Practice for Water Main Flushing and Disposal; 2002 AWWA Annuual Conference Procedings
2. AWWA Unidirectional Flushing DVD, 2002 (available for purchase from AWWA)
3. AWWA, Water Quality in the Distribution System, 2005
4. AWWA, Water Transmission and Distribution, Fourth Edition, Principles and Practices of Water Supply Operations, 2010
5. AWWARF, Cost and Benefit Analysis of Flushing, 2004
6. AWWARF, Guidance Manual for Maintaining Distribution System Water Quality, 2004
7. AWWARF, Implementation and Optimization of Distribution System Flushing Program,
8. Friedman, Melinda; Sherwin, Chris;
Hiltebrand, David; Establishing Contaminant Specific Flushing Velocities; AWWARF Study 2606, 2000 AWWA Water Quality Technical Conference Procedings
9. Barbeau, Benoit; Julienne, Karine; Gauthier, Vincent; Millette, Robert; Prevost, Michele;
Dead-End Flushing of a Distribution System:
Short and Long-term Impacts on Water Quality, 1999 AWWA Water Quality Technical Conference Procedings
10. Carriere, Annie; Barbeau, Benoit; Gauthier, Vincent; Morissette, Chantal; Millette, Robert;
Lalumiere, Alain; Unidirectional Flushing:
Loose Deposits Charactisation in the Test Zones of Four Canadian Distribution Systems; 2002 AWWA Water Quality Techincal Conference
11. Cossins, Fay; Hartman, David J.; Smith, Gardell; Merz, Rick; DeMarco, Jack;
Cincinnati Water Works, Cinncinnati, OH, The Cincinnati Water Works’ Unidirectional Flushing Pilot Program Results and Alternative Approaches for Full-Scale Implementation, AWWA, 2000
12. Friedman,P.E., Melinda; Hill, Andrew; Smith, Ph.D., Sian; Ta Ph.D., Tuan; Hinedi Ph.D., Zeina; Establishing Site-Specific Flushing Velocities; 2002 AWWA Water Quality Technical Conference
13. Hiltebrand, David J.; Theiss, Richard J.;
Distribution/Water Quality Control for Small Systems; 2002 AWWA Annual Conference Procedings
14. Jonus, Scott; Harbour, Joe; Murphy, Brian;
Distribution System Flushing Optimization to Reduce Environmental Impact, 2002 AWWA Water Quality Technical Conference
15. Reiss, C.Robert; Nantz, Harold; Schumi, Paul; Successful Completion of a Uni- Directional Flushing Program, Florida Water Resources Journal, December 2009
16. U.S. Army Corps of Engineers, Naval Facilities Engineering Command, and Air Force Civil Engineer Support Agency, Unified Facilities Criteria (UFC), Operation and Maintenance: Water Supply Systems, UFC 3-230-02, 2001
17. Williams, SM; Mains Flushing and Sediment Measurements in Water Main, 2002 AWWA Water Quality Techincal Conference
Example Notification of Distribution System
Appendix C Unidirectional Flushing (UDF) Guide for Water Distribution Systems
Example Notification of Distribution System Flushing The Base Civil Engineering Water Shop will be flushing water mains from ____________ to _____________, between ____ a.m. to ____ p.m.
The Water Shop will be monitoring water quality during that time. Area water users are asked to run their water for 10 minutes if they notice discoloration of the water.
Although water will be safe to drink, customers may chose to temporarily avoid or minimize using water if they notice hydrants being flushed nearby. (Cook and laundry – See Page 11)
The Water Shop can be reached at ____________.
| Table of Contents |
| Preface |
| Step-by-Step Guide forUnidirectional Flushing of aWater Distribution System |
| Table of Contents |
| Steps for Flushing Program |
| Step 1 Obtain Water Maps |
| Step 2 Pre-Flush TurbidityMeasurements |
| Step 3 Inspect Valves & Hydrants |
| Step 4 Prepare Flushing SequencePlan |
| Step 5 Locate & Operationally TestFlushing Valves & Hydrants |
| Step 6 Revise Flushing SequencePlan |
| Step 7 Prepare Flushing Forms |
| Step 8 Pre-Flushing Notifications |
| Step 9 Gather Tools & Supplies |
| Step 10 Prepare RepairContingency Plan |
| Step 11 Field Team Meeting todiscuss protocols, radioprotocols, safety, &emergency procedures |
| Step 12 Flushing – PrepositionWorkers and Equipment |
| Step 13 Set Up DechlorinationEquipment, if Needed |
| Step 14 Verify RadioCommunications |
| Step 15 Verify Tank Water Depthsand Pump Status |
| Step 16 Sequence 1-IsolateAppropriate Valves andPlace Orange Cones toMark Closed Valve |
| Step 17 Sequence 1 – BeginFlushing |
| Step 18 Sequence 1 – MeasureColor/Turbidity |
| Step 19 Sequence 1–RecordFlushing Data (i.e., flowrate, total gallons flushed,final turbidity, etc.) |
| Step 20 Sequence 1-RemoveFlushing Diffuser &Fasten Hydrant Caps |
| Step 21 Inspect for LandscapeDamage and Debris |
| Step 22 Sequence 2-OpenPreviously Closed Valves,Which Need to be Openedfor Next Sequence |
| Step 23 Repeat Steps 12 through23 for Sequence 2 |
| Step 24 End of Day – Mark,Clean/Dirty BoundaryClosed Valves with OrangeCones |
| Step 25 End of Day – Provide FireDepartment and NightOperator with Map ofTemporarily Closed Valves |
| Step 26 End of Day – Notify ShopSupervisor and CustomerService |
| Step 27 End of Project – Flush DeadEnd Mains and HydrantLeads |
| Step 28 End of Project – ReviewLessons Learned |
| Appendices |
| Appendix A - UDF Forms |
| Appendix B - References and Additional Information |
| Appendix C - Example Notification of Distributin System Flushing |
File details come from the government source that posted it. Updated .