03a._Exhibit_B-1_Rate_Sheet.xlsx

XLSX spreadsheet 72 KB Posted

Attached to
C5612621-D, Re-Bid 4 Construction and Demolition Debris Disposal and Recycling Services, Correctional Construction Mentorship Program
Solicitation number
0000037313
Issued by
California

About this file

Summary

This is an Exhibit B-1 Rate Sheet for Bid Number C5612621-D, Re-Bid 4, issued by the California Department of Corrections and Rehabilitation (CDCR) for Construction and Demolition Debris Disposal and Recycling Services supporting the Correctional Construction Mentorship Program. The contract encompasses twelve institution groups across multiple California correctional facilities, including Calipatria State Prison, Centinela State Prison, California Health Care Facility, California Institute for Men, California Institute for Women, California Rehabilitation Center, California Men's Colony, Female Community Reentry Program locations, High Desert State Prison, California State Prison Los Angeles County, Mule Creek State Prison, Pelican Bay State Prison, Ironwood State Prison, and Richard J. Donovan Correctional Facility. Bidders may elect to bid on one or more institution groups but must submit pricing for all locations within each selected group. Services include container provision in multiple sizes (10, 20, 30, and 40 cubic yard capacities), covered and lockable containers, rental fees, relocation and transportation services, recycling fees, and disposal services measured in tons. Estimated quantities vary significantly by institution, ranging from 52 tons at the smallest facility to 4,500 tons at the largest.

Pricing must be submitted in U.S. currency with all fees and taxes included, and bidders must complete all highlighted cells on the Excel version of the rate sheet; blank cells may result in bid rejection, while zero dollar amounts indicate the bidder will perform services at no cost to the State. Each group's basis of award calculation includes a 25 percent line item for additional as-needed, unforeseeable services at applicable rate sheet prices. Bidders may offer early payment discounts of at least one percent of the invoice amount with a minimum of fifty dollars to receive payment within thirty days of invoice receipt, with the highest discount prevailing in tie-bid situations. The State makes no guarantee that any included institution will request services, and the State reserves the right to omit portions of work as deemed necessary or advisable.

View the file

Other files

File Type Posted
IFB_C5612621-D,_Re-Bid_4.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER SHEET

CONSTRUCTION AND DEMOLITION

DEBRIS DISPOSAL AND RECYCLING SERVICES

CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM

Electronic bid packages include an Excel version of this Exhibit B-1, Rate Sheet in addition to the PDF file in order to assist bidders in computing bid totals. Bidders are encouraged to download the Excel version and complete all highlighted cells.

NOTE: Bidders may bid on one (1) or more institution groups. Bidders are not required to bid on all groups. However, if bidding on a group, your bid shall be for all locations within each group. Each item within the selected group you are bidding must be completed. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds for rejection. A zero dollar ($0.00 or $-) listed for any and all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.

Any quantities listed in Exhibit B-1, Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State.
All prices an notations must be printed in ink or typewritten. All prices must be in U.S. currency.
The "Basis of Award" for each Group is strictly used for bidding purposes only to determine the lowest responsive bidder. Each participating location's total basis of award includes a Rate Sheet line item totaling 25% of the sum of the bidder's service rate(s) to allow for additional as-needed, unforeseeable services. As-needed services will be payable at the applicable service rate(s) on the Exhibit B-1 Rate Sheet.
NOTE: The State makes no guarantee that any institution which is included in this bid package will request services.

The Contractor may offer a discount to the amount paid on invoices received and accepted by the CDCR in order for the invoices to be paid within thirty (30) days of receipt. Discount offered on invoices must be at least one percent of the invoice and a minimum of $50.00.

Discount offered on invoices to be paid within 30 days of receipt=%
* The percent of the discount (highest discount prevails) may be used in the event of tie bids. Refer to the Notice to Prospective Bidders, Basis for Award.

&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5612621-D, Re-Bid 4 Exhibit B-1

1 CAL-CEN

CONSTRUCTION AND DEMOLITION

DEBRIS DISPOSAL AND RECYCLING SERVICES

CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM

CALIPATRIA STATE PRISON (CAL)

CENTINELA STATE PRISON (CEN)

GROUP 1: CAL, CEN
A. ContainersCost per UnitXEstimated Quantity=Total
10 Cubic Yard "Lowboy" Containers$ - 0x40=$ - 0
10 Cubic Yard Container or equivalent$ - 0x40=$ - 0
20 Cubic Yard Container or equivalent$ - 0x40=$ - 0
30 Cubic Yard Container or equivalent$ - 0x40=$ - 0
40 Cubic Yard Container or equivalent$ - 0x40=$ - 0
Item A Subtotal=$ - 0
B. Covered/Lockable ContainersCost per UnitxEstimated Quantity=Total
2 Cubic Yard Front-Loading Covered/Lockable Container or equivalent$ - 0x50=$ - 0
20 Cubic Yard Covered/Lockable Container or equivalent$ - 0x50=$ - 0
30 Cubic Yard Covered/Lockable Container or equivalent$ - 0x50=$ - 0
40 Cubic Yard Covered/Lockable Container or equivalent$ - 0x60=$ - 0
Item B Subtotal=$ - 0
C. ServicesCostxEstimated Quantity=Total
Rental Fee (if applicable)$ - 0x50=$ - 0
Relocation Fee$ - 0x30=$ - 0
Transportation Fee$ - 0x30=$ - 0
Recycling Fee$ - 0x50=$ - 0
Item C Subtotal=$ - 0
D. DisposalCost per TonEstimated Quantity=Total
Disposal Fee$ - 0x280=$ - 0
Item D Subtotal=$ - 0
E. Other
As Needed Services (25%)=$ - 0
GRAND TOTAL (SUM OF ITEMS A + B + C + D+ E)$ - 0
BASIS OF AWARD

&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5612621-D, Re-Bid 4

2 CHCF

CONSTRUCTION AND DEMOLITION

DEBRIS DISPOSAL AND RECYCLING SERVICES

CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM

CALIFORNIA HEALTH CARE FACILITY (CHCF)

GROUP 2: CHCF
A. ContainersCost per UnitXEstimated Quantity=Total
10 Cubic Yard "Lowboy" Containers$ - 0x40=$ - 0
10 Cubic Yard Container or equivalent$ - 0x40=$ - 0
20 Cubic Yard Container or equivalent$ - 0x50=$ - 0
30 Cubic Yard Container or equivalent$ - 0x5=$ - 0
40 Cubic Yard Container or equivalent$ - 0x100=$ - 0
Item A Subtotal=$ - 0
B. Covered/Lockable ContainersCost per UnitxEstimated Quantity=Total
2 Cubic Yard Front-Loading Covered/Lockable Container or equivalent$ - 0x20=$ - 0
20 Cubic Yard Covered/Lockable Container or equivalent$ - 0x25=$ - 0
30 Cubic Yard Covered/Lockable Container or equivalent$ - 0x5=$ - 0
40 Cubic Yard Covered/Lockable Container or equivalent$ - 0x40=$ - 0
Item B Subtotal=$ - 0
C. ServicesCostxEstimated Quantity=Total
Rental Fee (if applicable)$ - 0x50=$ - 0
Relocation Fee$ - 0x10=$ - 0
Transportation Fee$ - 0x10=$ - 0
Recycling Fee$ - 0x20=$ - 0
Item C Subtotal=$ - 0
D. DisposalCost per TonEstimated Quantity=Total
Disposal Fee$ - 0x475=$ - 0
Item D Subtotal=$ - 0
E. Other
As Needed Services (25%)=$ - 0
GRAND TOTAL (SUM OF ITEMS A + B + C + D+ E)$ - 0
BASIS OF AWARD

Rate Sheet &"Arial,Regular"Bid Number C5612621-D, Re-Bid 4

3 CIM-CIW-CRC

CONSTRUCTION AND DEMOLITION

DEBRIS DISPOSAL AND RECYCLING SERVICES

CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM

CALIFORNIA INSTITUTE FOR MEN (CIM)

CALIFORNIA INSTITUTE FOR WOMEN (CIW)

CALIFORNIA REHABILITATION CENTER (CRC)

GROUP 3: CIM, CIW, CRC
A. ContainersCost per UnitXEstimated Quantity=Total
10 Cubic Yard "Lowboy" Containers$ - 0x40=$ - 0
10 Cubic Yard Container or equivalent$ - 0x40=$ - 0
20 Cubic Yard Container or equivalent$ - 0x40=$ - 0
30 Cubic Yard Container or equivalent$ - 0x40=$ - 0
40 Cubic Yard Container or equivalent$ - 0x40=$ - 0
Item A Subtotal=$ - 0
B. Covered/Lockable ContainersCost per UnitxEstimated Quantity=Total
2 Cubic Yard Front-Loading Covered/Lockable Container or equivalent$ - 0x40=$ - 0
20 Cubic Yard Covered/Lockable Container or equivalent$ - 0x40=$ - 0
30 Cubic Yard Covered/Lockable Container or equivalent$ - 0x40=$ - 0
40 Cubic Yard Covered/Lockable Container or equivalent$ - 0x40=$ - 0
Item B Subtotal=$ - 0
C. ServicesCostxEstimated Quantity=Total
Rental Fee (if applicable)$ - 0x50=$ - 0
Relocation Fee$ - 0x40=$ - 0
Transportation Fee$ - 0x45=$ - 0
Recycling Fee$ - 0x45=$ - 0
Item C Subtotal=$ - 0
D. DisposalCost per TonEstimated Quantity=Total
Disposal Fee$ - 0x515=$ - 0
Item D Subtotal=$ - 0
E. Other
As Needed Services (25%)=$ - 0
GRAND TOTAL (SUM OF ITEMS A + B + C + D+ E)$ - 0
BASIS OF AWARD

Rate Sheet &"Arial,Regular"Bid Number C5612621-D, Re-Bid 4

4 CMC

CONSTRUCTION AND DEMOLITION

DEBRIS DISPOSAL AND RECYCLING SERVICES

CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM

CALIFORNIA MEN'S COLONY (CMC)

GROUP 4: CMC
A. ContainersCost per UnitXEstimated Quantity=Total
10 Cubic Yard "Lowboy" Containers$ - 0x850=$ - 0
10 Cubic Yard Container or equivalent$ - 0x850=$ - 0
20 Cubic Yard Container or equivalent$ - 0x850=$ - 0
30 Cubic Yard Container or equivalent$ - 0x850=$ - 0
40 Cubic Yard Container or equivalent$ - 0x900=$ - 0
Item A Subtotal=$ - 0
B. Covered/Lockable ContainersCost per UnitxEstimated Quantity=Total
2 Cubic Yard Front-Loading Covered/Lockable Container or equivalent$ - 0x860=$ - 0
20 Cubic Yard Covered/Lockable Container or equivalent$ - 0x800=$ - 0
30 Cubic Yard Covered/Lockable Container or equivalent$ - 0x800=$ - 0
40 Cubic Yard Covered/Lockable Container or equivalent$ - 0x800=$ - 0
Item B Subtotal=$ - 0
C. ServicesCostxEstimated Quantity=Total
Rental Fee (if applicable)$ - 0x50=$ - 0
Relocation Fee$ - 0x600=$ - 0
Transportation Fee$ - 0x600=$ - 0
Recycling Fee$ - 0x800=$ - 0
Item C Subtotal=$ - 0
D. DisposalCost per TonEstimated Quantity=Total
Disposal Fee$ - 0x4500=$ - 0
Item D Subtotal=$ - 0
E. Other
As Needed Services (25%)=$ - 0
GRAND TOTAL (SUM OF ITEMS A + B + C + D+ E)$ - 0
BASIS OF AWARD

Rate Sheet &"Arial,Regular"Bid Number C5612621-D, Re-Bid 4

5 FCRP-SD

CONSTRUCTION AND DEMOLITION

DEBRIS DISPOSAL AND RECYCLING SERVICES

CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM

FEMALE COMMUNITY REENTRY PROGRAM- SAN DIEGO (FCRP-SD)

GROUP 5: FCRP-SD
A. ContainersCost per UnitXEstimated Quantity=Total
10 Cubic Yard "Lowboy" Containers$ - 0x20=$ - 0
10 Cubic Yard Container or equivalent$ - 0x20=$ - 0
20 Cubic Yard Container or equivalent$ - 0x20=$ - 0
30 Cubic Yard Container or equivalent$ - 0x20=$ - 0
40 Cubic Yard Container or equivalent$ - 0x20=$ - 0
Item A Subtotal=$ - 0
B. Covered/Lockable ContainersCost per UnitxEstimated Quantity=Total
2 Cubic Yard Front-Loading Covered/Lockable Container or equivalent$ - 0x20=$ - 0
20 Cubic Yard Covered/Lockable Container or equivalent$ - 0x20=$ - 0
30 Cubic Yard Covered/Lockable Container or equivalent$ - 0x20=$ - 0
40 Cubic Yard Covered/Lockable Container or equivalent$ - 0x20=$ - 0
Item B Subtotal=$ - 0
C. ServicesCostxEstimated Quantity=Total
Rental Fee (if applicable)$ - 0x50=$ - 0
Relocation Fee$ - 0x10=$ - 0
Transportation Fee$ - 0x25=$ - 0
Recycling Fee$ - 0x30=$ - 0
Item C Subtotal=$ - 0
D. DisposalCost per TonEstimated Quantity=Total
Disposal Fee$ - 0x52=$ - 0
Item D Subtotal=$ - 0
E. Other
As Needed Services (25%)=$ - 0
GRAND TOTAL (SUM OF ITEMS A + B + C + D+ E)$ - 0
BASIS OF AWARD

Rate Sheet &"Arial,Regular"Bid Number C5612621-D, Re-Bid 4

6 FCRP-SFS

CONSTRUCTION AND DEMOLITION

DEBRIS DISPOSAL AND RECYCLING SERVICES

CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM

FEMALE COMMUNITY REENTRY PROGRAM- SANTA FE SPRINGS (FCRP-SFS)

GROUP 6: FCRP-SFS
A. ContainersCost per UnitXEstimated Quantity=Total
10 Cubic Yard "Lowboy" Containers$ - 0x10=$ - 0
10 Cubic Yard Container or equivalent$ - 0x10=$ - 0
20 Cubic Yard Container or equivalent$ - 0x8=$ - 0
30 Cubic Yard Container or equivalent$ - 0x8=$ - 0
40 Cubic Yard Container or equivalent$ - 0x8=$ - 0
Item A Subtotal=$ - 0
B. Covered/Lockable ContainersCost per UnitxEstimated Quantity=Total
2 Cubic Yard Front-Loading Covered/Lockable Container or equivalent$ - 0x8=$ - 0
20 Cubic Yard Covered/Lockable Container or equivalent$ - 0x8=$ - 0
30 Cubic Yard Covered/Lockable Container or equivalent$ - 0x8=$ - 0
40 Cubic Yard Covered/Lockable Container or equivalent$ - 0x8=$ - 0
Item B Subtotal=$ - 0
C. ServicesCostxEstimated Quantity=Total
Rental Fee (if applicable)$ - 0x50=$ - 0
Relocation Fee$ - 0x10=$ - 0
Transportation Fee$ - 0x22=$ - 0
Recycling Fee$ - 0x22=$ - 0
Item C Subtotal=$ - 0
D. DisposalCost per TonEstimated Quantity=Total
Disposal Fee$ - 0x30=$ - 0
Item D Subtotal=$ - 0
E. Other
As Needed Services (25%)=$ - 0
GRAND TOTAL (SUM OF ITEMS A + B + C + D+ E)$ - 0
BASIS OF AWARD

Rate Sheet &"Arial,Regular"Bid Number C5612621-D, Re-Bid 4

7 HDSP

CONSTRUCTION AND DEMOLITION

DEBRIS DISPOSAL AND RECYCLING SERVICES

CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM

HIGH DESERT STATE PRISON (HDSP)

GROUP 7: HDSP
A. ContainersCost per UnitXEstimated Quantity=Total
10 Cubic Yard "Lowboy" Containers$ - 0x200=$ - 0
10 Cubic Yard Container or equivalent$ - 0x200=$ - 0
20 Cubic Yard Container or equivalent$ - 0x200=$ - 0
30 Cubic Yard Container or equivalent$ - 0x150=$ - 0
40 Cubic Yard Container or equivalent$ - 0x200=$ - 0
Item A Subtotal=$ - 0
B. Covered/Lockable ContainersCost per UnitxEstimated Quantity=Total
2 Cubic Yard Front-Loading Covered/Lockable Container or equivalent$ - 0x150=$ - 0
20 Cubic Yard Covered/Lockable Container or equivalent$ - 0x200=$ - 0
30 Cubic Yard Covered/Lockable Container or equivalent$ - 0x150=$ - 0
40 Cubic Yard Covered/Lockable Container or equivalent$ - 0x200=$ - 0
Item B Subtotal=$ - 0
C. ServicesCostxEstimated Quantity=Total
Rental Fee (if applicable)$ - 0x50=$ - 0
Relocation Fee$ - 0x25=$ - 0
Transportation Fee$ - 0x25=$ - 0
Recycling Fee$ - 0x40=$ - 0
Item C Subtotal=$ - 0
D. DisposalCost per TonEstimated Quantity=Total
Disposal Fee$ - 0x400=$ - 0
Item D Subtotal=$ - 0
E. Other
As Needed Services (25%)=$ - 0
GRAND TOTAL (SUM OF ITEMS A + B + C + D+ E)$ - 0
BASIS OF AWARD

Rate Sheet &"Arial,Regular"Bid Number C5612621-D, Re-Bid 4

8 LAC

CONSTRUCTION AND DEMOLITION

DEBRIS DISPOSAL AND RECYCLING SERVICES

CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM

CALIFORNIA STATE PRISON, LOS ANGELES COUNTY (LAC)

GROUP 8: LAC
A. ContainersCost per UnitXEstimated Quantity=Total
10 Cubic Yard "Lowboy" Containers$ - 0x130=$ - 0
10 Cubic Yard Container or equivalent$ - 0x120=$ - 0
20 Cubic Yard Container or equivalent$ - 0x130=$ - 0
30 Cubic Yard Container or equivalent$ - 0x120=$ - 0
40 Cubic Yard Container or equivalent$ - 0x120=$ - 0
Item A Subtotal=$ - 0
B. Covered/Lockable ContainersCost per UnitxEstimated Quantity=Total
2 Cubic Yard Front-Loading Covered/Lockable Container or equivalent$ - 0x160=$ - 0
20 Cubic Yard Covered/Lockable Container or equivalent$ - 0x150=$ - 0
30 Cubic Yard Covered/Lockable Container or equivalent$ - 0x150=$ - 0
40 Cubic Yard Covered/Lockable Container or equivalent$ - 0x150=$ - 0
Item B Subtotal=$ - 0
C. ServicesCostxEstimated Quantity=Total
Rental Fee (if applicable)$ - 0x50=$ - 0
Relocation Fee$ - 0x90=$ - 0
Transportation Fee$ - 0x90=$ - 0
Recycling Fee$ - 0x90=$ - 0
Item C Subtotal=$ - 0
D. DisposalCost per TonEstimated Quantity=Total
Disposal Fee$ - 0x1250=$ - 0
Item D Subtotal=$ - 0
E. Other
As Needed Services (25%)=$ - 0
GRAND TOTAL (SUM OF ITEMS A + B + C + D+ E)$ - 0
BASIS OF AWARD

Rate Sheet &"Arial,Regular"Bid Number C5612621-D, Re-Bid 4

9 MCSP

CONSTRUCTION AND DEMOLITION

DEBRIS DISPOSAL AND RECYCLING SERVICES

CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM

MULE CREEK STATE PRISON (MCSP)

GROUP 9: MCSP
A. ContainersCost per UnitXEstimated Quanity=Total
10 Cubic Yard "Lowboy" Containers$ - 0x60=$ - 0
10 Cubic Yard Container or equivalent$ - 0x60=$ - 0
20 Cubic Yard Container or equivalent$ - 0x200=$ - 0
30 Cubic Yard Container or equivalent$ - 0x30=$ - 0
40 Cubic Yard Container or equivalent$ - 0x375=$ - 0
Item A Subtotal=$ - 0
B. Covered/Lockable ContainersCost per UnitxEstimated Quanity=Total
2 Cubic Yard Front-Loading Covered/Lockable Container or equivalent$ - 0x30=$ - 0
20 Cubic Yard Covered/Lockable Container or equivalent$ - 0x60=$ - 0
30 Cubic Yard Covered/Lockable Container or equivalent$ - 0x30=$ - 0
40 Cubic Yard Covered/Lockable Container or equivalent$ - 0x60=$ - 0
Item B Subtotal=$ - 0
C. ServicesCostxEstimated Quanity=Total
Rental Fee (if applicable)$ - 0x50=$ - 0
Relocation Fee$ - 0x60=$ - 0
Transportation Fee$ - 0x60=$ - 0
Recycling Fee$ - 0x30=$ - 0
Item C Subtotal=$ - 0
D. DisposalCost per TonEstimated Quanity=Total
Disposal Fee$ - 0x2200=$ - 0
Item D Subtotal=$ - 0
E. Other
As Needed Services (25%)=$ - 0
GRAND TOTAL (SUM OF ITEMS A + B + C + D+ E)$ - 0
BASIS OF AWARD

Rate Sheet &"Arial,Regular"Bid Number C5612621-D, Re-Bid 4

10 PBSP

CONSTRUCTION AND DEMOLITION

DEBRIS DISPOSAL AND RECYCLING SERVICES

CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM

PELICAN BAY STATE PRISON (PBSP)

GROUP 10: PBSP
A. ContainersCost per UnitXEstimated Quantity=Total
10 Cubic Yard "Lowboy" Containers$ - 0x5=$ - 0
10 Cubic Yard Container or equivalent$ - 0x5=$ - 0
20 Cubic Yard Container or equivalent$ - 0x12=$ - 0
30 Cubic Yard Container or equivalent$ - 0x5=$ - 0
40 Cubic Yard Container or equivalent$ - 0x12=$ - 0
Item A Subtotal=$ - 0
B. Covered/Lockable ContainersCost per UnitxEstimated Quantity=Total
2 Cubic Yard Front-Loading Covered/Lockable Container or equivalent$ - 0x5=$ - 0
20 Cubic Yard Covered/Lockable Container or equivalent$ - 0x10=$ - 0
30 Cubic Yard Covered/Lockable Container or equivalent$ - 0x5=$ - 0
40 Cubic Yard Covered/Lockable Container or equivalent$ - 0x10=$ - 0
Item B Subtotal=$ - 0
C. ServicesCostxEstimated Quantity=Total
Rental Fee (if applicable)$ - 0x50=$ - 0
Relocation Fee$ - 0x8=$ - 0
Transportation Fee$ - 0x8=$ - 0
Recycling Fee$ - 0x12=$ - 0
Item C Subtotal=$ - 0
D. DisposalCost per TonEstimated Quantity=Total
Disposal Fee$ - 0x75=$ - 0
Item D Subtotal=$ - 0
E. Other
As Needed Services (25%)=$ - 0
GRAND TOTAL (SUM OF ITEMS A + B + C + D+ E)$ - 0
BASIS OF AWARD

Rate Sheet &"Arial,Regular"Bid Number C5612621-D, Re-Bid 4

11 ISP

CONSTRUCTION AND DEMOLITION

DEBRIS DISPOSAL AND RECYCLING SERVICES

CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM

IRONWOOD STATE PRISON (ISP)

GROUP 11: ISP
A. ContainersCost per UnitXEstimated Quantity=Total
10 Cubic Yard "Lowboy" Containers$ - 0x9=$ - 0
10 Cubic Yard Container or equivalent$ - 0x9=$ - 0
20 Cubic Yard Container or equivalent$ - 0x6=$ - 0
30 Cubic Yard Container or equivalent$ - 0x6=$ - 0
40 Cubic Yard Container or equivalent$ - 0x9=$ - 0
Item A Subtotal=$ - 0
B. Covered/Lockable ContainersCost per UnitxEstimated Quantity=Total
2 Cubic Yard Front-Loading Covered/Lockable Container or equivalent$ - 0x12=$ - 0
20 Cubic Yard Covered/Lockable Container or equivalent$ - 0x5=$ - 0
30 Cubic Yard Covered/Lockable Container or equivalent$ - 0x4=$ - 0
40 Cubic Yard Covered/Lockable Container or equivalent$ - 0x4=$ - 0
Item B Subtotal=$ - 0
C. ServicesCostxEstimated Quantity=Total
Rental Fee (if applicable)$ - 0x10=$ - 0
Relocation Fee$ - 0x10=$ - 0
Transportation Fee$ - 0x10=$ - 0
Recycling Fee$ - 0x10=$ - 0
Item C Subtotal=$ - 0
D. DisposalCost per TonEstimated Quantity=Total
Disposal Fee$ - 0x100=$ - 0
Item D Subtotal=$ - 0
E. Other
As Needed Services (25%)=$ - 0
GRAND TOTAL (SUM OF ITEMS A + B + C + D+ E)$ - 0
BASIS OF AWARD

Rate Sheet &"Arial,Regular"Bid Number C5612621-D, Re-Bid 4

12 RJD

CONSTRUCTION AND DEMOLITION

DEBRIS DISPOSAL AND RECYCLING SERVICES

CORRECTIONAL CONSTRUCTION MENTORSHIP PROGRAM

RICHARD J. DONOVAN CORRECTIONAL FACILITY (RJD)

GROUP 12: RJD
A. ContainersCost per UnitXEstimated Quantity=Total
10 Cubic Yard "Lowboy" Containers$ - 0x45=$ - 0
10 Cubic Yard Container or equivalent$ - 0x45=$ - 0
20 Cubic Yard Container or equivalent$ - 0x50=$ - 0
30 Cubic Yard Container or equivalent$ - 0x50=$ - 0
40 Cubic Yard Container or equivalent$ - 0x50=$ - 0
Item A Subtotal=$ - 0
B. Covered/Lockable ContainersCost per UnitxEstimated Quantity=Total
2 Cubic Yard Front-Loading Covered/Lockable Container or equivalent$ - 0x80=$ - 0
20 Cubic Yard Covered/Lockable Container or equivalent$ - 0x80=$ - 0
30 Cubic Yard Covered/Lockable Container or equivalent$ - 0x80=$ - 0
40 Cubic Yard Covered/Lockable Container or equivalent$ - 0x80=$ - 0
Item B Subtotal=$ - 0
C. ServicesCostxEstimated Quantity=Total
Rental Fee (if applicable)$ - 0x120=$ - 0
Relocation Fee$ - 0x100=$ - 0
Transportation Fee$ - 0x100=$ - 0
Recycling Fee$ - 0x135=$ - 0
Item C Subtotal=$ - 0
D. DisposalCost per TonEstimated Quantity=Total
Disposal Fee$ - 0x2000=$ - 0
Item D Subtotal=$ - 0
E. Other
As Needed Services (25%)=$ - 0
GRAND TOTAL (SUM OF ITEMS A + B + C + D+ E)$ - 0
BASIS OF AWARD

Rate Sheet &"Arial,Regular"Bid Number C5612621-D, Re-Bid 4

Sheet1

File details come from the government source that posted it. Updated .