03a_-_Bid_Form_revised_Event_4394.xlsx
XLSX spreadsheet 58 KB Posted
- Attached to
- BID-PW-Northside Greenway Phase 1
- Solicitation number
- 0000004394
- Issued by
- Hennepin County, Minnesota
About this file
This is a bid form for a state and local contract opportunity. The document is an Excel-based bid form (revised) associated with Event 4394. The form serves as the submission vehicle for vendors interested in bidding on the contract opportunity. The bid form requests standard bidder information and pricing details necessary for evaluation of proposals. While the specific products or services, quantities, response deadlines, and contract term are not detailed within this bid form document itself, this form functions as the required submission format for interested bidders to present their qualifications and pricing to the procuring agency or consortium.
The bid form establishes the structure and requirements for vendor submissions but does not contain explicit information regarding pricing terms, set-asides, incumbent contractor status, funding sources, or other substantive contract parameters within the document itself. Bidders using this form are expected to complete all required fields and submit their responses according to the instructions provided by the procuring entity. Additional contract details, specifications, and evaluation criteria would typically be found in accompanying solicitation documents such as the scope of work or request for proposal.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID FORM | |
| PW-NORTHSIDE GREENWAY PHASE 1 | |
| EVENT: 4394 | |
| SP # 141-090-042 and SP 027-753-025. MN Project # STBG 2726(185) |
Please note: bidders must submit a price on each line in order to be considered responsive.
| COMPANY NAME: ____________________________ | |||||||
| NO. | ITEM NO. | ITEM DESCRIPTION | UNIT | CONTRACT QUANTITY | UNIT PRICE | EXTENDED PRICE | |
| 1 | 2011.601 | AS BUILT | LUMP SUM | 1 | $ - 0 | $ - 0 | 2 |
| 2 | 2021.501 | MOBILIZATION | LUMP SUM | 1 | $ - 0 | $ - 0 | 2 |
| 3 | 2101.502 | GRUBBING | EACH | 2 | $ - 0 | $ - 0 | 0 |
| 4 | 2102.503 | PAVEMENT MARKING REMOVAL | LIN FT | 1,334 | $ - 0 | $ - 0 | 0 |
| 5 | 2102.518 | PAVEMENT MARKING REMOVAL | SQ FT | 132 | $ - 0 | $ - 0 | 0 |
| 6 | 2104.502 | REMOVE BOLLARDS | EACH | 2 | $ - 0 | $ - 0 | 0 |
| 7 | 2104.502 | REMOVE CATCH BASIN | EACH | 42 | $ - 0 | $ - 0 | 0 |
| 8 | 2104.502 | REMOVE CASTING | EACH | 39 | $ - 0 | $ - 0 | 0 |
| 9 | 2104.502 | REMOVE CURB STOP AND BOX | EACH | 1 | $ - 0 | $ - 0 | 0 |
| 10 | 2104.502 | REMOVE VALVE BOX | EACH | 1 | $ - 0 | $ - 0 | 0 |
| 11 | 2104.502 | REMOVE HYDRANT | EACH | 6 | $ - 0 | $ - 0 | 0 |
| 12 | 2104.502 | REMOVE SIGN | EACH | 16 | $ - 0 | $ - 0 | 0 |
| 13 | 2104.502 | REMOVE SIGN PANEL | EACH | 8 | $ - 0 | $ - 0 | 0 |
| 14 | 2104.502 | REMOVE SIGN PANEL SPECIAL | EACH | 16 | $ - 0 | $ - 0 | 0 |
| 15 | 2104.502 | SALVAGE SIGN | EACH | 32 | $ - 0 | $ - 0 | 0 |
| 16 | 2104.502 | SALVAGE SIGN PANEL | EACH | 12 | $ - 0 | $ - 0 | 0 |
| 17 | 2104.503 | SAWING CONCRETE PAVEMENT (FULL DEPTH) | LIN FT | 5,323 | $ - 0 | $ - 0 | 0 |
| 18 | 2104.503 | SAWING BITUMINOUS PAVEMENT (FULL DEPTH) | LIN FT | 1,830 | $ - 0 | $ - 0 | 0 |
| 19 | 2104.503 | REMOVE WATER MAIN | LIN FT | 100 | $ - 0 | $ - 0 | 0 |
| 20 | 2104.503 | REMOVE SEWER PIPE (STORM) | LIN FT | 1,279 | $ - 0 | $ - 0 | 0 |
| 21 | 2104.503 | REMOVE CURB AND GUTTER | LIN FT | 7,874 | $ - 0 | $ - 0 | 0 |
| 22 | 2104.504 | REMOVE CONCRETE PAVEMENT | SQ YD | 8,291 | $ - 0 | $ - 0 | 0 |
| 23 | 2104.504 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 4,372 | $ - 0 | $ - 0 | 0 |
| 24 | 2104.518 | REMOVE CONCRETE WALK | SQ FT | 35,360 | $ - 0 | $ - 0 | 0 |
| 25 | 2104.518 | REMOVE CONCRETE DRIVEWAY PAVEMENT | SQ FT | 665 | $ - 0 | $ - 0 | 0 |
| 26 | 2104.602 | SALVAGE SIGN PANEL SPECIAL | EACH | 9 | $ - 0 | $ - 0 | 0 |
| 27 | 2104.602 | REMOVE MAINTENANCE HOLE | EACH | 17 | $ - 0 | $ - 0 | 0 |
| 28 | 2106.507 | EXCAVATION - COMMON | CU YD | 333 | $ - 0 | $ - 0 | 0 |
| 29 | 2106.507 | GRANULAR EMBANKMENT (CV) | CU YD | 138 | $ - 0 | $ - 0 | 0 |
| 30 | 2106.602 | UTILITY POTHOLE | EACH | 4 | $ - 0 | $ - 0 | 0 |
| 31 | 2123.610 | STREET SWEEPER (WITH PICKUP BROOM) | HOUR | 100 | $ - 0 | $ - 0 | 0 |
| 32 | 2130.523 | WATER | M GALLON | 50 | $ - 0 | $ - 0 | 0 |
| 33 | 2211.507 | AGGREGATE BASE (CV) CLASS 5 | CU YD | 840 | $ - 0 | $ - 0 | 0 |
| 34 | 2231.604 | BITUMINOUS PATCH SPECIAL | SQ YD | 216 | $ - 0 | $ - 0 | 0 |
| 35 | 2232.603 | MILL BITUMINOUS SURFACE (3.0") 1' WIDE | LIN FT | 418 | $ - 0 | $ - 0 | 0 |
| 36 | 2301.504 | CONCRETE PAVEMENT 8.0" | SQ YD | 3,273 | $ - 0 | $ - 0 | 0 |
| 37 | 2301.602 | 1.0" DOWEL BAR | EACH | 903 | $ - 0 | $ - 0 | 0 |
| 38 | 2301.602 | DRILL AND GROUT REINF BAR (EPOXY COATED) | EACH | 1,576 | $ - 0 | $ - 0 | 0 |
| 39 | 2301.604 | COLORED & STAMPED CONCRETE PAVEMENT 8.0" | SQ YD | 82 | $ - 0 | $ - 0 | 0 |
| 40 | 2301.604 | CONCRETE PAVEMENT (SPECIAL) | SQ YD | 347 | $ - 0 | $ - 0 | 0 |
| 41 | 2301.604 | COLORED CONCRETE PAVEMENT (SPECIAL) | SQ YD | 71 | $ - 0 | $ - 0 | 0 |
| 42 | 2302.508 | SUPPLEMENTAL REINFORCEMENT BARS (EPOXY COATED) | POUND | 682.0 | $ - 0 | $ - 0 | 0 |
| 43 | 2360.509 | TYPE SP 12.5 WEARING COURSE MIXTURE (4;L) | TON | 613 | $ - 0 | $ - 0 | 0 |
| 44 | 2360.509 | TYPE SP 12.5 NON WEARING COURSE MIXTURE (4;L) | TON | 463 | $ - 0 | $ - 0 | 0 |
| 45 | 2360.509 | TYPE SP 12.5 WEARING COURSE MIXTURE (5;L) | TON | 198 | $ - 0 | $ - 0 | 0 |
| 46 | 2360.603 | SAWED AND SEALED JOINT | LIN FT | 1,475 | $ - 0 | $ - 0 | 0 |
| 47 | 2401.508 | REINFORCEMENT BARS | POUND | 1,117 | $ - 0 | $ - 0 | 0 |
| 48 | 2411.607 | CONTROL DENSITY HYDRAULIC FILL | CU YD | 13 | $ - 0 | $ - 0 | 0 |
| 49 | 2452.601 | TEMPORARY VERTICAL SHORING | LUMP SUM | 1 | $ - 0 | $ - 0 | 0 |
| 50 | 2502.503 | 8" PERF PE PIPE DRAIN | LIN FT | 195 | $ - 0 | $ - 0 | 0 |
| 51 | 2503.503 | 12" PVC PIPE SEWER | LIN FT | 725 | $ - 0 | $ - 0 | 0 |
| 52 | 2503.503 | 15" PVC PIPE SEWER | LIN FT | 256 | $ - 0 | $ - 0 | 0 |
| 53 | 2503.503 | 12" RC PIPE SEWER CLASS V | LIN FT | 48 | $ - 0 | $ - 0 | 0 |
| 54 | 2503.503 | 15" RC PIPE SEWER CLASS V | LIN FT | 53 | $ - 0 | $ - 0 | 0 |
| 55 | 2503.503 | 18" RC PIPE SEWER CLASS V | LIN FT | 53 | $ - 0 | $ - 0 | 0 |
| 56 | 2503.503 | 24" RC PIPE SEWER CLASS III | LIN FT | 66 | $ - 0 | $ - 0 | 0 |
| 57 | 2503.503 | 27" RC PIPE SEWER CLASS III | LIN FT | 134 | $ - 0 | $ - 0 | 0 |
| 58 | 2503.503 | 42" RC PIPE SEWER CLASS III | LIN FT | 24 | $ - 0 | $ - 0 | 0 |
| 59 | 2503.503 | 54" RC PIPE SEWER CLASS III | LIN FT | 54 | $ - 0 | $ - 0 | 0 |
| 60 | 2503.602 | CONSTRUCT BULKHEAD | EACH | 2 | $ - 0 | $ - 0 | 0 |
| 61 | 2503.602 | CONNECT TO EXISTING STORM SEWER | EACH | 28 | $ - 0 | $ - 0 | 0 |
| 62 | 2503.602 | CONNECT TO EXISTING MAINTENANCE HOLE | EACH | 8 | $ - 0 | $ - 0 | 0 |
| 63 | 2503.603 | PLUG FILL AND ABANDON PIPE SEWER | LIN FT | 38 | $ - 0 | $ - 0 | 0 |
| 64 | 2503.604 | 4" INSULATION | SQ YD | 4 | $ - 0 | $ - 0 | 0 |
| 65 | 2504.602 | CONNECT TO EXISTING WATER SERVICE | EACH | 1.0 | $ - 0 | $ - 0 | 0 |
| 66 | 2504.602 | INSTALL HYDRANT | EACH | 6.0 | $ - 0 | $ - 0 | 0 |
| 67 | 2504.602 | VALVE BOX | EACH | 6.0 | $ - 0 | $ - 0 | 0 |
| 68 | 2504.602 | WATER MAINTENANCE HOLE | EACH | 5.0 | $ - 0 | $ - 0 | 0 |
| 69 | 2504.602 | 1" CORPORATION STOP | EACH | 1 | $ - 0 | $ - 0 | 0 |
| 70 | 2504.602 | 6" GATE VALVE | EACH | 7 | $ - 0 | $ - 0 | 0 |
| 71 | 2504.602 | ADJUST CURB STOP | EACH | 84 | $ - 0 | $ - 0 | 0 |
| 72 | 2504.602 | 1" CURB STOP AND BOX | EACH | 1 | $ - 0 | $ - 0 | 0 |
| 73 | 2504.602 | WATER UTILITY HOLE | EACH | 19 | $ - 0 | $ - 0 | 0 |
| 74 | 2504.603 | 1" TYPE K COPPER PIPE | LIN FT | 76.00 | $ - 0 | $ - 0 | 0 |
| 75 | 2504.603 | 6" WATERMAIN DUCTILE IRON CL 52 | LIN FT | 117 | $ - 0 | $ - 0 | 0 |
| 76 | 2504.603 | WATERMAIN ENCASEMENT | LIN FT | 49 | $ - 0 | $ - 0 | 0 |
| 77 | 2504.608 | DUCTILE IRON FITTINGS | POUND | 456 | $ - 0 | $ - 0 | 0 |
| 78 | 2506.502 | CONSTRUCT DRAINAGE STRUCTURE DESIGN N | EACH | 43 | $ - 0 | $ - 0 | 0 |
| 79 | 2506.502 | CASTING ASSEMBLY | EACH | 62.00 | $ - 0 | $ - 0 | 0 |
| 80 | 2506.502 | ADJUST FRAME AND RING CASTING | EACH | 15 | $ - 0 | $ - 0 | 0 |
| 81 | 2506.503 | CONSTRUCT DRAINAGE STRUCTURE DESIGN J | LIN FT | 7 | $ - 0 | $ - 0 | 1 |
| 82 | 2506.503 | CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 | LIN FT | 92.16 | $ - 0 | $ - 0 | 1 |
| 83 | 2506.503 | CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 | LIN FT | 6 | $ - 0 | $ - 0 | 1 |
| 84 | 2506.503 | CONSTRUCT DRAINAGE STRUCTURE DESIGN 72-4020 | LIN FT | 25 | $ - 0 | $ - 0 | 1 |
| 85 | 2506.602 | ENERGY DISSIPATER | EACH | 15 | $ - 0 | $ - 0 | 0 |
| 86 | 2506.603 | RECONSTRUCT MAINTENANCE HOLE | LIN FT | 5 | $ - 0 | $ - 0 | 0 |
| 87 | 2511.602 | BOULDER 24"-36" | EACH | 17 | $ - 0 | $ - 0 | 0 |
| 88 | 2511.602 | BOULDER >36"-48" | EACH | 18 | $ - 0 | $ - 0 | 0 |
| 89 | 2511.602 | BOULDER >48"-60" | EACH | 9 | $ - 0 | $ - 0 | 0 |
| 90 | 2521.518 | 4" CONCRETE WALK | SQ FT | 22,392 | $ - 0 | $ - 0 | 0 |
| 91 | 2521.518 | 4" COLORED CONCRETE WALK | SQ FT | 20,812 | $ - 0 | $ - 0 | 0 |
| 92 | 2521.518 | 6" COLORED CONCRETE WALK | SQ FT | 7,805 | $ - 0 | $ - 0 | 0 |
| 93 | 2521.518 | 8" COLORED CONCRETE WALK | SQ FT | 321 | $ - 0 | $ - 0 | 0 |
| 94 | 2521.602 | DRILL AND GROUT REINF BAR (EPOXY COATED) | EACH | 1,447 | $ - 0 | $ - 0 | 0 |
| 95 | 2521.618 | CONCRETE CURB RAMP WALK | SQ FT | 8,411 | $ - 0 | $ - 0 | 0 |
| 96 | 2521.618 | COLORED CONCRETE CURB RAMP WALK | SQ FT | 1,067 | $ - 0 | $ - 0 | 0 |
| 97 | 2531.503 | CONCRETE CURB AND GUTTER DESIGN B524 | LIN FT | 3,656 | $ - 0 | $ - 0 | 0 |
| 98 | 2531.503 | CONCRETE CURB AND GUTTER DESIGN B612 | LIN FT | 402 | $ - 0 | $ - 0 | 0 |
| 99 | 2531.503 | CONCRETE CURB AND GUTTER DESIGN B624 | LIN FT | 4,057 | $ - 0 | $ - 0 | 0 |
| 100 | 2531.503 | CONCRETE CURB DESIGN SPECIAL | LIN FT | 439 | $ - 0 | $ - 0 | 0 |
| 101 | 2531.503 | CONCRETE CURB DESIGN V6 | LIN FT | 277 | $ - 0 | $ - 0 | 0 |
| 102 | 2531.504 | 6" CONCRETE DRIVEWAY PAVEMENT | SQ YD | 59 | $ - 0 | $ - 0 | 0 |
| 103 | 2531.504 | 8" CONCRETE DRIVEWAY PAVEMENT | SQ YD | 71 | $ - 0 | $ - 0 | 0 |
| 104 | 2531.603 | CONCRETE CURB & GUTTER DESIGN B624-6 | LIN FT | 81 | $ - 0 | $ - 0 | 0 |
| 105 | 2531.603 | CONCRETE CURB & GUTTER DESIGN B624-12 | LIN FT | 316 | $ - 0 | $ - 0 | 0 |
| 106 | 2531.603 | CONCRETE CURB AND GUTTER DESIGN D512 (MODIFIED) | LIN FT | 135 | $ - 0 | $ - 0 | 0 |
| 107 | 2531.603 | CONCRETE SILL | LIN FT | 3,762 | $ - 0 | $ - 0 | 0 |
| 108 | 2531.604 | 8" CONCRETE VALLEY GUTTER | SQ YD | 9 | $ - 0 | $ - 0 | 0 |
| 109 | 2531.618 | TACTILE GUIDE STRIP | SQ FT | 51 | $ - 0 | $ - 0 | 0 |
| 110 | 2531.618 | TRUNCATED DOMES | SQ FT | 1,509 | $ - 0 | $ - 0 | 0 |
| 111 | 2540.602 | BENCH | EACH | 9 | $ - 0 | $ - 0 | 0 |
| 112 | 2540.602 | BENCH SPECIAL | EACH | 4 | $ - 0 | $ - 0 | 0 |
| 113 | 2545.502 | HANDHOLE | EACH | 32 | $ - 0 | $ - 0 | 0 |
| 114 | 2545.503 | 2" NON-METALLIC CONDUIT | LIN FT | 4,395 | $ - 0 | $ - 0 | 0 |
| 115 | 2545.503 | 2" NON-METALLIC CONDUIT (DIRECTIONAL BORE) | LIN FT | 2,703 | $ - 0 | $ - 0 | 0 |
| 116 | 2563.601 | TRAFFIC CONTROL SUPERVISOR | LUMP SUM | 1 | $ - 0 | $ - 0 | 2 |
| 117 | 2563.601 | TRAFFIC CONTROL | LUMP SUM | 1 | $ - 0 | $ - 0 | 2 |
| 118 | 2563.601 | ALTERNATE PEDESTRIAN ROUTE | LUMP SUM | 1 | $ - 0 | $ - 0 | 2 |
| 119 | 2564.502 | INSTALL SIGN PANEL | EACH | 7 | $ - 0 | $ - 0 | 0 |
| 120 | 2564.602 | SIGN FOUNDATION | EACH | 143 | $ - 0 | $ - 0 | 0 |
| 121 | 2564.602 | SIGN COLLAR | EACH | 56 | $ - 0 | $ - 0 | 0 |
| 122 | 2564.602 | INSTALL SIGN | EACH | 31 | $ - 0 | $ - 0 | 0 |
| 123 | 2564.602 | INSTALL SIGN SPECIAL | EACH | 14 | $ - 0 | $ - 0 | 0 |
| 124 | 2564.602 | INSTALL SIGN PANEL SPECIAL | EACH | 27 | $ - 0 | $ - 0 | 0 |
| 125 | 2564.602 | INSTALL SIGN PANEL SPECIAL (ROAD SIGN) | EACH | 32 | $ - 0 | $ - 0 | 0 |
| 126 | 2564.602 | FLEXIBLE DELINEATOR | EACH | 19 | $ - 0 | $ - 0 | 0 |
| 127 | 2564.618 | SIGN | SQ FT | 607 | $ - 0 | $ - 0 | 0 |
| 128 | 2564.618 | SIGN PANEL | SQ FT | 87 | $ - 0 | $ - 0 | 0 |
| 129 | 2565.616 | PEDESTRIAN CROSSWALK FLASHER SYSTEM SPECIAL | SYSTEM | 1 | $ - 0 | $ - 0 | 0 |
| 130 | 2565.616 | PEDESTRIAN CROSSWALK FLASHER SYSTEM SPECIAL 1 | SYSTEM | 2 | $ - 0 | $ - 0 | 0 |
| 131 | 2565.616 | PEDESTRIAN CROSSWALK FLASHER SYSTEM SPECIAL 2 | SYSTEM | 1 | $ - 0 | $ - 0 | 0 |
| 132 | 2571.602 | TREE PROTECTION | EACH | 9 | $ - 0 | $ - 0 | 0 |
| 133 | 2573.501 | EROSION CONTROL SUPERVISOR | LUMP SUM | 1 | $ - 0 | $ - 0 | 2 |
| 134 | 2573.502 | STORM DRAIN INLET PROTECTION | EACH | 150 | $ - 0 | $ - 0 | 0 |
| 135 | 2573.503 | SEDIMENT CONTROL LOG TYPE COMPOST | LIN FT | 1,945 | $ - 0 | $ - 0 | 0 |
| 136 | 2573.602 | SANDBAG | EACH | 13 | $ - 0 | $ - 0 | 0 |
| 137 | 2574.505 | SOIL BED PREPARATION | ACRE | 1 | $ - 0 | $ - 0 | 2 |
| 138 | 2574.507 | BOULEVARD TOPSOIL BORROW | CU YD | 256 | $ - 0 | $ - 0 | 0 |
| 139 | 2574.508 | FERTILIZER TYPE 1 | POUND | 186 | $ - 0 | $ - 0 | 0 |
| 140 | 2574.508 | FERTILIZER TYPE 3 | POUND | 92 | $ - 0 | $ - 0 | 0 |
| 141 | 2574.607 | FILTER TOPSOIL BORROW | CU YD | 120 | $ - 0 | $ - 0 | 0 |
| 142 | 2575.501 | TURF ESTABLISHMENT | LUMP SUM | 1 | $ - 0 | $ - 0 | 0 |
| 143 | 2575.505 | SEEDING | ACRE | 0 | $ - 0 | $ - 0 | 2 |
| 144 | 2575.507 | MULCH MATERIAL TYPE 6 | CU YD | 84 | $ - 0 | $ - 0 | 0 |
| 145 | 2575.508 | HYDRAULIC MULCH MATRIX | POUND | 98 | $ - 0 | $ - 0 | 0 |
| 146 | 2575.523 | RAPID STABILIZATION METHOD 3 | M GALLON | 6 | $ - 0 | $ - 0 | 2 |
| 147 | 2575.605 | SEEDING SPECIAL | ACRE | 0 | $ - 0 | $ - 0 | 2 |
| 148 | 2575.608 | SEED OATS | POUND | 54 | $ - 0 | $ - 0 | 0 |
| 149 | 2575.608 | SEED WINTER WHEAT | POUND | 54 | $ - 0 | $ - 0 | 0 |
| 150 | 2575.608 | SEED SOUTHERN BOULEVARD | POUND | 76 | $ - 0 | $ - 0 | 0 |
| 151 | 2575.608 | SEED MIXTURE SPECIAL | POUND | 98 | $ - 0 | $ - 0 | 0 |
| 152 | 2582.503 | 4" SOLID LINE MULTI-COMPONENT | LIN FT | 1,282 | $ - 0 | $ - 0 | 0 |
| 153 | 2582.503 | 6" SOLID LINE MULTI-COMPONENT | LIN FT | 938 | $ - 0 | $ - 0 | 0 |
| 154 | 2582.503 | 4" DOUBLE SOLID LINE MULTI-COMPONENT | LIN FT | 2,433 | $ - 0 | $ - 0 | 0 |
| 155 | 2582.503 | 4" DOTTED LINE MULTI-COMPONENT GROUND IN | LIN FT | 652 | $ - 0 | $ - 0 | 0 |
| 156 | 2582.503 | 4" DOUBLE SOLID LINE MULTI-COMPONENT GROUND IN | LIN FT | 275 | $ - 0 | $ - 0 | 0 |
| 157 | 2582.503 | 24" SOLID LINE PREFORM THERMO GROUND IN | LIN FT | 43 | $ - 0 | $ - 0 | 0 |
| 158 | 2582.503 | 24" SOLID LINE PREFORM THERMO GROUND IN ESR | LIN FT | 42 | $ - 0 | $ - 0 | 0 |
| 159 | 2582.518 | PAVEMENT MESSAGE PREFORM THERMOPLASTIC GROUND IN | SQ FT | 944 | $ - 0 | $ - 0 | 0 |
| 160 | 2582.518 | CROSSWALK PREFORM THERMOPLASTIC GROUND IN | SQ FT | 392 | $ - 0 | $ - 0 | 0 |
| 161 | 2582.518 | CROSSWALK PREFORM THERMOPLASTIC GROUND IN ENHANCED SKID RESISTANCE | SQ FT | 240 | $ - 0 | $ - 0 | 0 |
| 162 | 2582.618 | CROSSWALK PREF THERMO GR IN - BIKEWAY MARKINGS | SQ FT | 604 | $ - 0 | $ - 0 | 0 |
| 163 | 2582.618 | CROSSWALK PREF THERMO GR IN ENHANCED SKID RESISTANCE - BIKEWAY MARKINGS | SQ FT | 144 | $ - 0 | $ - 0 | 0 |
| GRAND TOTAL BASE BID: | $ - 0 |