This is a Performance Work Statement (PWS) for the onsite installation of cellular signal boosters at U.S. Army Test, Measurement and Diagnostic Equipment Activity (USATA) locations. The U.S. Army Contracting Command-Redstone is seeking to procure and install two Wilson PRO signal booster systems (Enterprise 4300 and 1300 models) in Buildings 5435 and 5436 at Fowler Road, Redstone Arsenal, Alabama to ensure reliable connectivity for government mobile devices and provide emergency communication backup in the event of a NASE outage. The contractor shall deliver the equipment to the specified locations and perform all installation tasks as outlined.

The contractor is responsible for installing a complete signal booster system in Building 5435 consisting of three directional outdoor Yagi antennas with surge suppressors mounted on an exterior pole, one Wilson PRO Enterprise 4300 indoor amplifier in wall-mount configuration, two 3-way wideband splitters, and eight dome antennas distributed throughout the facility via coaxial cable connections. Building 5436 requires a similar installation with the Enterprise 1300 amplifier, three outdoor Yagi antennas with surge suppressors, one 3-way splitter, and three dome antennas. Performance shall occur onsite at both buildings, with contractor personnel required to comply with installation access requirements, background checks, personal identity verification, and applicable security policies and procedures established by the Army's Provost Marshal Office and Security Office. The Government will provide adequate storage space, work facilities, utilities, and equipment access at no additional cost to the contractor.

View the file

Other files

File Type Posted
Request for Information (W80RA6-20-26C).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

ONSITE Installation of Signal Boosters

1.0 GENERAL. The U.S. Army Test, Measurement and Diagnostic Equipment Activity (USATA) have a requirement to acquire purchase of two (2) signal boosters (Wilson PRO Enterprise 4300 and 1300) to be installed in multiple USATA buildings to guarantee connectivity for government mobile devices. This also provides a critical emergency communication contingency in the event of a NASE outage. These items shall be delivered to the U.S. Army TMDE Activity locations, Buildings 5435 and 5436 Fowler Road, Redstone Arsenal, AL. The signal boosters shall include the following specifications or equivalent (if not brand name):

2.0 CONTRACTOR TASKS. The vendor shall perform the following tasks or equivalent when installing the boosters for both Buildings 5435 and 5326.

Building 5435 — Wilson PRO Enterprise 4300 (Wall Mount) Outdoor Components:

• Install three (3) Wilson PRO directional outdoor Yagi antennas configured for MTT (Multiple Transmitter Technology) operation, mounted to a single exterior pole mount.

• Install three (3) Wilson PRO in-line surge suppressors between the outdoor antennas and the amplifier.

Indoor Amplifier:

• Install one (1) Wilson PRO Enterprise 4300 cellular signal amplifier in a wall-mount configuration at the designated interior location.

• Connect the outdoor antenna assembly to the amplifier via 1/2-inch coaxial cable with appropriate N-connectors.

Indoor Distribution:

• Install two (2) Wilson 3-way wideband cellular signal splitters.

• Two (2) dome antennas will be fed directly from the amplifier; the remaining six (6) will be fed via the splitters, three (3) per splitter.

• Mount and connect eight (8) Wilson PRO standard dome antennas at ceiling locations as determined during installation.

Building 5436 — Wilson PRO Enterprise 1300 (Wall Mount) Outdoor Components:

• Install three (3) Wilson PRO directional outdoor Yagi antennas configured for MTT operation, mounted to a single exterior pole mount.

• Install three (3) Wilson PRO in-line surge suppressors between the outdoor antennas and the amplifier.

Indoor Amplifier:

• Install one (1) Wilson PRO Enterprise 1300 cellular signal amplifier at the designated interior location.

• Connect the outdoor antenna assembly to the amplifier via 1/2-inch coaxial cable with appropriate N-connectors.

Indoor Distribution:

• Install one (1) Wilson 3-way wideband cellular signal splitter.

• Mount and connect three (3) Wilson PRO standard dome antennas at ceiling locations as determined during installation.

3.0 GOVERNMENT TASKS.

3.1 The U.S. Army TMDE Activity, Redstone Arsenal, AL (Acceptance DODAAC: W80RA6) shall be responsible for receiving, inspection and acceptance in DFAS Wide Area Workflow (WAWF).

3.2 The Government shall provide adequate storage space for spare parts, tools and test equipment required by the Contractor in performance of Contractor tasks, as well as adequate working space, to include desks, chairs, heating, lighting, ventilation, electrical current and outlets for tools and test equipment for use by the Contractor’s customer support technicians. These facilities shall be within a reasonable distance of the equipment to be services and shall be provided at no additional cost to the Contractor.

3.3 Subject to applicable security regulations, the Government shall provide the Contractor access to the equipment to perform the calibration and training services.

4.0 PLACE OF PERFORMANCE. Required maintenance services shall be performed on-site at Buildings 5435 and 5436 Fowler Road, Redstone Arsenal, AL.

4.1 Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility, or area. Contractors and all associated subcontractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. Contractor and all associated subcontractor employees shall comply with adjudication standards and processes using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

4.2 For contractors that do not require a CAC but require access to a DoD facility or installation. Contractor and all associated subcontractor employees shall comply with adjudication standards and processes using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

5.0 QUALITY REQUIREMENTS. Not applicable.

6.0 GOVERNMENT-FURNISHED EQUIPMENT. None.