This is a Statement of Work (SOW) for the Naval Surface Warfare Center, Dahlgren Division (NSWCDD) requiring procurement and installation of a 100kVA Series Static Frequency Converter (SFC).

The contractor must provide one SFC model SFCD00100NLJ manufactured by Power Systems & Controls, Inc., rated at 100kVA/80kW with input voltage of 480Y/277 Volts (3 Phase, 60Hz) and output voltage of 115 Volts (3 Phase, 400Hz). The unit specifications include 12 Pulse PWM Solid-State Technology with double conversion topology, galvanic electrical isolation, output frequency regulation of 400Hz (±0.4Hz), pure sine wave output with ±1% voltage regulation under linear load, input voltage tolerance of ±15%, noise level of 67dB, and harmonic distortion less than 3%. The converter requires NEMA 1 indoor enclosure, vertical configuration, emergency stop button, input/output breakers, and comprehensive protection features including over/under voltage alarm, output short circuit protection, current limiting, and auto-shutdown with one-minute auto-restore capability. Remote monitoring, automatic line drop volt compensation, and 28VDC circuitry are explicitly not required. The contractor must deliver the SFC to Dahlgren, Virginia and provide installation services including verification of existing power input specifications, reconnection of existing power cables via bottom feed configuration, and operational testing to demonstrate functional capabilities per OEM specifications. The government will provide the support structure with minimum six inches rear clearance, verify cable condition, unload and position the unit, and coordinate access and scheduling. Anticipated travel requires three technicians to Dahlgren, Virginia for five days.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

UNCLASSIFIED

400 HZ CONVERTER

STATEMENT OF WORK (SOW)

1.0 BACKGROUND

The Naval Surface Warfare Center, Dahlgren Division (NSWCDD) requires one (1) Series Static Frequency Converter (SFC), 100kVA, with installation services to ensure operational capabilities.

2.0 APPLICABLE DOCUMENTS

Original Equipment Manufacturer (OEM) Specifications

3.0 REQUIREMENTS

3.1 The Contractor shall provide one (1) each Series SFC, 100kVA, model number SFCD00100NLJ, Rating: 100kVA, 80kW, Input Voltage: 480Y/277 Volts, 3 Phase, 4W+G, 60Hz, Wye, Output Voltage: 115 Volts, 3 Phase, 400Hz, Ungrounded, Delta 3 Wire, Enclosure: NEMA 1 (Indoor Enclosure), Footprint: 44’W x 63”H x 32D, Weight Approximately 2100 pounds, manufactured by Power Systems & Controls, Inc. (PS&C).

3.2 The Contractor shall ensure the model meets the following specifications:

12 Pulse PWM Solid-State Technology Double Conversion Topology Galvanic - Electrical Isolation Converter Design Output Frequency Regulation: 400Hz (+/- .4HZ) Pure Sine Wave Output Output Voltage Regulation: +/- 1% (Linear load) Input Voltage: +/- 15% Voltage Adjustment: Manual, Potentiometer Output Voltage Adjustment: +/-10% Noise Level: 67 dB Harmonic Distortion: < 3% (Linear Load) Operating Temperature: 32° -104°F (0° - 40°C) Input Breaker & Output Breaker Configuration: Vertical Emergency Stop (E-Stop Button) Overload Capability: 110% Continuous, 125% 10 Minutes Connection: Bottom Fed Protection: Over/Under Voltage Alarm, Output Short Circuit, Current Limited & Blown Fuse

Indication, Overload, Auto Shutdown, Auto-Restore after 1 min., Overload Temp Condition Will Auto Shutdown

Indicators: LCD Real Time Status/Clock, Data or Historical Events, Self-Diagnosis via LED Status & Audible Alarm

3.2.1 Note that Remote Monitoring & Communications, Automatic Line Drop Volt Compensation, 28VDC E&F Circuitry are NOT required for this unit.

3.3 The Contractor shall deliver the SFC to the NSWCDD, located in Dahlgren, Virginia.

UNCLASSIFIED

UNCLASSIFIED

3.4 The Contractor shall provide installation services once the SFC is accepted by the government.

3.4.1 The Contractor shall verify existing power input specifications prior to installation.

3.4.2 The Contractor shall provide installation by reconnecting existing power cables previously used on the SFC that were removed.

3.5 The Contractor shall ensure the SFC is operational IAW OEM specifications demonstrating the execution of the noted functional capabilities.

3.6 The Contractor shall coordinate with the technical point(s) of contact listed below to complete this work.

4.0 GOVERNMENT-FURNISHED PROPERTY/MATERIAL/INFORMATION

(GFP/GFM/GFI)

4.1 The Government will perform the following prior to scheduling the installation:

4.1.1 Provide a structure, providing both support and a minimum of 6 inches of rear clearance.

4.1.2 Verify the existing cables are in good condition and capable of being bottom fed through the front of the SFC; and

4.1.3 Upon receipt of the SFC noted above, unload and position the SFC on the structure.

4.2 The Government will coordinate with the Contractor to schedule installation services once acceptance of the equipment has occurred.

4.3 The Government will coordinate access to the NSWCDD location to complete the work.

5.0 TRAVEL

The Contractor will be required to travel in performance of this contract. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the technical point of contact. All travel shall be conducted in accordance with the Federal Travel Regulations (FTR). The following travel is anticipated: three (3) technicians to Dahlgren, Virginia for five (5) days.

6.0 TECHNICAL POINT OF CONTACT

File details come from the government source that posted it. Updated .