Attachment J2 - Task Order 1 SOW.pdf

PDF 869 KB Posted

Attached to
Window Treatment Products and Related Services
Solicitation number
030ADV27R0013
Issued by

About this file

This is a Task Order for window blinds product and installation services at the Library of Congress Thomas Jefferson Building in Washington, D.C.

The contractor shall replace five wood blinds with faux wood-look blinds and five wood sunburst arch louvers with real wood sunburst arch louvers in the Jefferson Congressional Pavilion. For the standard faux blinds, the contractor must provide SWFcontract Cordless 2" premium faux wood blinds with 1.5" × 2.25" steel headrail, UV-stabilized 2" PVC slats, and extruded foam PVC trapezoid bottom rail, manufactured to project-specific dimensions (widths 17"–120", heights up to 96"), with ANSI/WCMA A100.1-2022 compliance. For the sunburst louvers, the contractor must provide Graber Blinds custom built sunburst arch louvers with beveled wood louvers matching the color of the 2" blinds below them. Alternative manufacturers of equal specification are acceptable per Section L.2 of Solicitation 030ADV27R0013. The contractor is responsible for all site measurement visits, delivery, labor, hardware, equipment, removal and disposal of old blinds (except sunburst louvers and frames, which the government will remove), and complete installation. Deliveries are just-in-time and must comply with LC52.211-2 regulations for Capitol Hill campus. Installation services include dismantle of five existing wood blinds and installation of new blinds with a walk-through punch list within 72 hours of completion. All work must occur during normal business hours (8:30am–5:00pm) at the Thomas Jefferson Building, 101 Independence Ave SE. The period of performance is 60 days from task order award, with a kick-off meeting required no later than TBD to confirm delivery dates and product order date. All dates and room locations are marked TBD pending contract award.

View the file

Other files

File Type Posted
Attachment J1 - Price Worksheet.xlsx XLSX spreadsheet
030ADV27R0013.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task Order 1

Project 27-300b Window Blinds Product & Install

1. Background

The Office of the Librarian (LIBN) provides leadership and executive management to the Library, overseeing the implementation of the Library's mission.

2. Scope

2.1 The Contractor shall:

a. replace five (5) wood blinds with faux wood-look blinds to match the existing color, style and design;

b. Replace five (5) wood sunburst arch louvers with real wood sunburst arch louvers to match the existing color, style and design. This includes all site measurement visits, delivery, labor, hardware, equipment (tools, ladders, etc.), removal and disposal of old blinds (except as indicated in 2.2 below), and for a complete installation of the new blinds.

2.2 The government will remove the existing sunburst louvers and frames so accurate measurements for the replacement louvers and frames can be taken.

3. Project Description

3.1 The Contractor shall:

a. In accordance with “Drawing of Room for Blinds” below, replace wood blinds and wood sunburst arch louvers for (5) windows in Jefferson Congressional Pavilion, see 3.3 below for additional detailed information.

The existing wood blinds shall be replaced with faux wood-look blinds to match the existing color, style and design – see 3.2 below for additional detailed information on the faux blind selection.

The existing sunburst arch louvers are to be replaced with real wood blinds to match style, and design – see 3.3 below for additional detailed information on the sunburst arch louvers selection.

3.2 The LOC requires the following for the standard faux blind selection:

a. SWFcontract Cordless 2" premium faux wood blind with 1.5" × 2.25" steel headrail

UV‑stabilized 2" PVC slats, and extruded foam PVC trapezoid bottom rail.

b. Moisture‑resistant construction suitable for high‑humidity environments.

c. Cordless lift system with steel tilt rod, low‑friction cradles with metal rollers, and reinforced polyester ladder cords for durability.

d. Blinds to be manufactured to project‑specific dimensions: widths 17"–120" and heights up to 96". Standard features include SureClose headrail system, wand tilt, braided ladder, and ANSI/WCMA A100.1‑2022 compliance.

e. Options available: Extension brackets, hold‑down brackets, cut‑outs (tilt only), and end‑support box brackets. Installation brackets are steel with urethane primer and baked‑enamel finish to match the headrail.

f. Other manufacturers of equal specification are acceptable; see Section L.2 of Solicitation

030ADV27R0013 .

3.3 The LOC requires the following for the standard sunburst louver selection:

a. Graber Blinds custom built sunburst arch louver.

b. Sunburst pattern—no horizontal slats.

c. Beveled louvers for maximum light control. Louver sizes vary based on height and width of arch. Louver rotation will vary based on louver size and louvers. The arch has no tilt bar; the louvers open individually and are spring loaded at the bottom pin, will not open to a full 90 degrees.

d. Louvers to be wood.

e. Louvers to color match 2” blinds placed below them.

f. Sunburst louver frame and slats to match design, and style of existing.

g. Other manufacturers of equal specification are acceptable; see Section L.2 of Solicitation

030ADV27R0013.

4. Product Delivery

4.1 The Contractor will be responsible for contacting the COR two (2) business days prior to the order date to confirm the anticipated delivery date in the task order. If the delivery date has changed but is still within sixty (60) business days of the original date in the task order, the Contractor shall confirm the new anticipated delivery date and provide a new order date.

4.2 All product shall be delivered to the following address:

Delivery Address Deliver no

Sooner Than Deliver no Later Than

Library of Congress, Thomas Jefferson Building, 101 Independence Ave SE, Washington, D.C. 20540 Room #: TBD

TBD TBD

4.3 The Contractor shall fully coordinate all aspects of the product delivery with the LOC

Contracting Officer’s Representative (COR) prior to actual product delivery. The contractor shall finalize the delivery schedule with the COR at least five business days prior to the planned delivery date. (The contractor shall take into consideration the door widths and travel path to the room location.)

Just-In-Time Delivery [ x] Yes [ ] No

4.4 All product shall be staged to support an efficient installation. Staging locations will be discussed and presented to the Contractor prior to the delivery date. Contractor is responsible for ensuring that a code compliant path of travel is maintained for the duration of staging and installation.

4.5 All deliveries to the Capitol Hill campus shall comply with the regulations outlined in

LC52.211-2 Deliveries to the Library of Congress, Capitol Hill Campus.

5. Installation Services

5.1 This project requires the following window blind installation services:

[x ] Dismantle [ ] Inventory [x ] Installation of new window blinds [ ] Installation of Existing Window Treatment Product

6. Window Blind Dismantle Services

6.1 The contractor shall dismantle the following window blinds as identified in Table below and associated Drawing herein:

Item Qty.

Existing wood blinds only (does NOT include the sunburst arch louvers) 5

6.2 All dismantled window blinds shall be staged in an orderly fashion and grouped by item type (for example, all blinds shall be grouped together, etc.). Contractor is responsible for ensuring that a code compliant path of travel is maintained for the duration of the dismantling and staging.

Dismantle Location Deliver no Sooner Than

Deliver no Later Than

Library of Congress, Thomas Jefferson Building, 101 Independence Ave SE, Washington, D.C. 20540

Room #: TBD

TBD TBD

6.3 The contractor shall fully coordinate all aspects of the dismantling and staging with the

COR prior to start of work. The contractor shall finalize the dismantle schedule with the COR at least five business days prior to the planned dismantle date.

7. Window Blind Installation Services

7.1 All window blinds shall be installed according to the approved installation plans in the drawings contained herein. Contractor is responsible for ensuring that a code compliant path of travel is maintained for the duration of the installation. The contractor will be required to perform a check and review of all window blind parts and components prior to installation to identify missing or damaged product prior to start of window blind install. The contractor must notify the COR immediately if missing product is discovered.

7.2 The contractor is also responsible for binding, stacking, clearing and trash removal of all product packaging upon completion of window blind installation. The contractor will leave all work areas clean and free of all debris.

7.3 The contractor will attend a walk-thru with the COR within 72 hours after window blind installation is complete to generate a punch list.

7.4 Window blind installation services shall be provided at the following location/s and within the following dates:

Installation Address Install Start no Install Complete

Sooner Than no Later Than Library of Congress, Thomas Jefferson Building, 101 Independence Ave SE, Washington, D.C. 20540

Room #: TBD

TBD TBD

7.5 The contractor shall fully coordinate all aspects of the installation with the COR prior to install. The contractor shall finalize the installation schedule with the COR at least five business days prior to the planned install date.

8. Hours of Operation

8.1 All deliveries and installation services shall occur during the following hours:

[X] Normal Business Hours [ ] After Hours [ ] Weekends (8:30am – 5:00pm)

9. Kick-Off Meeting

9.1 The Contractor shall hold a meeting with the COR to review a detailed project plan no later than TBD, to confirm the anticipated delivery dates, and to identify the date the product will be ordered.

10. Period of Performance

10.1 The period of performance for this project will be 60 days commencing on the task order start date once task order is awarded. All work must be scheduled to be completed within this timeframe and per the schedule outlined in the kick-off meeting.

Any modifications or extensions will be requested through LOC Contracting Officers. All punch list items must be performed per the direction of the base IDIQ contract.

Drawing of Room for Blinds

Attachment J2 - Task Order 1 SOW Rev 11.16.26.pdf
Attachement J3 - Notional Task Order 1 SOW DWG_Redacted.pdf

File details come from the government source that posted it. Updated .