RFQ 030ADV24Q0185.pdf

PDF 435 KB Posted

Attached to
Alertus Beacon Installation
Solicitation number
030ADV24Q0185
Issued by

About this file

This document is a Request for Quotation (RFQ) for the installation of emergency alert beacons at the Library of Congress (LOC) Capitol Hill campus buildings in Washington, D.C.

The LOC requires the installation of recently procured emergency alert beacons in areas where building alarms and public address speakers are insufficient to alert staff and visitors of emergencies. The contractor shall install the beacons to tie into the LOC's Joint Emergency Mass Notification System and activate when alerts are issued by the U.S. Capitol Police. The contract is firm-fixed-price and the period of performance is from June 15, 2024 through September 15, 2024. Proposals are due by June 17, 2024 at 11:00 AM EDT. This is a full-and-open competition with no set-asides for small businesses.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF1. REQUISITION NO.

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO. UEI: EFT:

PHONE: FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 See SCHEDULE

030ADV24Q0185 05-31-2024

Leonard, David 06-17-2024

11:00 EDT

Contracts and Grants Directorate Library of Congress

101 Independence Ave. SE LA 325 Washington DC 20540-9411

X

N/A

X

DELIVERY

See Sections D&F for delivery instructions.

Contracts & Grants Directorate Library of Congress

LA 325

101 Independence Av SE Washington DC 20540-9411

Submit Invoices through https://www.ipp.gov Washington DC 20540

See CONTINUATION Page

See CONTINUATION Page

X X

Leonard, David

030ADV24Q0185

Table of Contents

SECTION A

A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

B.1 LC52.216-3 CONTRACT TYPE (JUN 2016)

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

SECTION D - PACKAGING AND MARKING

D.1 LC52.211-1 DELIVERIES (APR 2015)

D.2 LC52.211-2 DELIVERIES TO THE LIBRARY OF CONGRESS, CAPITOL HILL CAMPUS (JUN 2021)

SECTION F - DELIVERIES OR PERFORMANCE

F.1 52.247-34 F.O.B. DESTINATION (NOV 1991)

F.2 LC52.215-5 PLACE AND PERIOD OF PERFORMANCE (JAN 2019)

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 LC52.201-1 CONTRACTING OFFICER'S REPRESENTATIVE (COR) APPOINTMENT AND AUTHORITY (JAN 2016)

G.2 LC52.201-3 CONTRACT ADMINISTRATION (AUG 2015)

G.3 LC52.204-5 IDENTIFICATION AND BUILDING PASSES (DEC 2014)

G.4 LC52.232-1 LIBRARY OF CONGRESS INVOICE INSTRUCTIONS (DEC 2022)

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 LC52.203-1 CONTRACTOR PUBLICITY (OCT 2013)

H.2 LC52.204-1 COLLECTIONS SECURITY (DEC 2013)

H.3 LC52.204-2 CONDUCT ON LIBRARY PREMISES (JUL 2021)

H.4 LC52.204-4 CONTRACTOR EMPLOYEE FITNESS (AUG 2023)

H.5 LC52.237-2 CONDUCT OF WORK (MAY 2015)

PART II - CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES

I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

I.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE

ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2024)

I.3 LC52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS (DEV) (FEB 2016)

030ADV24Q0185

I.4 LC52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE

ORDERS - COMMERCIAL ITEMS (DEV) (MAY 2015)

I.5 LC52.228-70 INSURANCE REQUIREMENTS - WORK ON LIBRARY PREMISES (DEC 2014)

I.6 LC52.232-25 PROMPT PAYMENT (DEV) (JUL 2013)

I.7 LC52.233-1 52.233-1 (DEV) DISPUTES (MAY 2014)

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

K.1 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (FEB 2024)

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1 LC52.233-2 PROTESTS TO THE LIBRARY OF CONGRESS (DEC 2013)

SECTION M - EVALUATION FACTORS FOR AWARD

M.1 LC52.215-4 EVALUATION – LOW PRICE TECHNICALLY ACCEPTABLE (JUL 2016)

030ADV24Q0185 Section B

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

B.1 LC52.216-3 CONTRACT TYPE (JUN 2016)

This is a Firm-Fixed-Price contract.

(End of Clause)

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1.00 LOT _______________

Alertus Beacon Installation Project IAW Section C Contract Period: Base POP Begin: 06-15-2024 POP End: 09-15-2024

GRAND TOTAL _______________

030ADV24Q0185 Section C

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

1. OVERVIEW / BACKGROUND

The Library of Congress (LOC) requires installation of recently procured emergency alert beacons to be installed in identified locations throughout the LOC Capitol Hill campus buildings (John Adams, James Madison, Thomas Jefferson) in Washington, DC. The installations are designated for areas where neither building alarms nor the public address speakers are sufficiently audible to alert staff and visitors of building emergencies. Without the installation of these beacons, building occupants may go completely unaware the building(s) are in a state of emergency. Additionally, there are numerous hearing and visually impaired staff working throughout the LOC’s Capitol Hill campus buildings, in areas where staff is minimal and the Wireless Fidelity (WiFi) and cellular telephone coverage is limited and/or insufficient to receive emergency alerts on government-issued and personal devices.

2. SCOPE

The contractor shall install the emergency alert beacons under a Firm Fixed Price contract.

3. REQUIREMENTS

Emergency alert beacons must be installed to operate in conjunction with the LOC communications services and equipment.

3.1. The emergency alert beacons must tie directly into the Capitol Hill campus’s Joint Emergency Mass Notification System (JEMNS) which notifies staff about life-safety emergencies anywhere on Capitol Hill.

3.2. The emergency alert beacons must be activated when JEMNS alerts are issued from the United States Capitol Police (USCP).

3.3. The emergency alert beacons must emit a loud alarm, flashlights, and scroll emergency instructions.

3.4. Installation locations must not negatively impact required head clearances, block sprinkler spray patterns, or limit access to existing systems or utilities.

4. CONTRACT PERFORMANCE

4.1. SCHEDULE OF EVENTS/DELIVERABLES

The contractor must install and maintain the emergency alert beacons within the period of performance. The contractor must provide and install the server software on a virtual server and software license within the period of performance.

The software license must be perpetual and provide functionality to allow the LOC emergency alert beacons to integrate in the Joint Emergency Mass Notification System (JEMNS). JEMNS alerts issued by the USCP activates the emergency alert beacons installed throughout the LOC Capitol Campus buildings. The contractor must provide technical support for a period of twelve months. Technical support must include:

Live 24-hour call-in support User training support Website instructional support System and notification audit reports

Technical support must cover all capabilities of the enhanced notification services to include:

Alertus software package with full screen notification Active monitoring and notification Alertus activation by third-party text message service Automatic notification triggers Administrator’s web dashboard Device assignment utility Role-based user access Alertus mobile app-suite

The 12-month period shall start on the day the server software implementation is complete.

When arriving for repairs that requires a delivery, all delivery vehicles will be required to report to the off-site inspection center for the U.S. Capitol Police located at 4700 Shepherd Parkway, SW for inspection, before proceeding to the Library of Congress Madison Building dock on C Street, SE.

No deliveries will be accepted unless the vehicles have been processed at the off-site inspection center. All contents of the delivery vehicles are required to be processed, via x-ray screening prior to gaining access to the Capitol Complex. The hours of operation for the off-site inspection center are 5:00 AM to 7:00 PM, Monday through Friday. The facility is closed on all Federal holidays unless specifically noted. All delivery personnel will be required to provide picture identification and be processed through the National Crime Information Center (NCIC).

To gain access to the loading dock, Contractor is required to have a letter on file with the United States Capitol Police (USCP). The letter must be on company letterhead accompanied by signature of the owner, president, or manager.

Please print or type the names in alphabetical order of persons requesting access. Requests for access should contain the following information.

1. Name of the company

2. Name of the drivers/employees requiring access

3. Social Security Number for each driver/employee

4. Date of Birth for each driver/employee

5. Building(s) to be accessed

6. Company contact person and telephone number

4.2. QUALITY CONTROL (If applicable). The contractor shall develop and maintain an effective quality control program (QCP) to ensure services are performed in accordance with this contract. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which it assures itself that its work complies with the requirement of the contract. The contractor must confirm that at least 90% of the newly installed emergency alert beacons are in compliance and working appropriately upon immediate install and the remaining 10% emergency alert beacons must be confirmed to work appropriately within the first 30 days upon installation. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to its QC system.

5. ADDITIONAL INFORMATION

5.1. PLACE OF PERFORMANCE. The work to be performed under the contract shall be performed at identified locations throughout the LOC Capitol Hill campus buildings The number of emergency alert beacons to be installed are listed below.

John Adams Building: 1 emergency alert beacon James Madison Building: 6 emergency alert beacons

Thomas Jefferson Building: 16 emergency alert beacons

5.2. HOURS OF OPERATION. The contractor is responsible for conducting business during the hours agreed upon by the LOC Contracting Officer Representative (COR), Mondays through Fridays, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. To prevent a disruption in Library of Congress services, the contractor shall perform all installation and associated maintenance work once the Library of Congress has closed for the day.

5.3. Government furnished property N/A

6. SPECIAL QUALIFICATIONS. Contractor shall be authorized to install Alertus products and shall provide installers with UL certifications.

6.1. KEY PERSONNEL (if applicable). The following positions are considered key personnel:

Contract/Program Manager Alternate Contract/Program Manager Systems Engineer/Technical Support Point of Contact

The contractor shall provide a contract/program manager who shall be responsible for the performance of the work.

The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract/program manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract/program manager or alternate shall be available between 8:00 a.m. to 4:30p.m. Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.

6.2. HAZMAT PREVENTION. Contractor shall work with the Library of Congress to ensure that Alertus Beacon emergency alert device installations does not prevent any hazardous materials (HAZMAT) situations. If a HAZMAT situation occurs, the contractor shall immediately stop work until a resolution has been identified.

7. REPORTING

7.1. Contractor shall provide Alertus Emergency Alert Beacon training to LOC personnel within 30 days of completion of device installation.

7.2. Contractor shall provide a written report to certify functionality of installed Alertus Emergency Alert Beacons within 30 days of installation.

7.3. Contractor shall provide a written report of all tests within 14 days of quarterly testing of the emergency alert beacons.

7.4. Contractor shall provide updated floor plans/drawings/schematics of Library of Congress locations with newly installed Alertus Beacon emergency alert devices.

8. PHASE IN /PHASE OUT PERIOD (If applicable) N/A

9. PERIOD OF PERFORMANCE: The period of performance for installation shall not exceed 90 days once installation begins.

(End of Statement of Work)

030ADV24Q0185 Section D

SECTION D - PACKAGING AND MARKING

D.1 LC52.211-1 DELIVERIES (APR 2015)

All deliveries submitted to the CO or the COR or other Library personnel designated to receive deliverables shall clearly indicate the following information:

a. Agency/Requiring Library Service Unit and MAIL STOP/Room Number

b. Description of information/data being submitted

c. Contract Number

d. Contractor Name and Address

(End of Clause)

D.2 LC52.211-2 DELIVERIES TO THE LIBRARY OF CONGRESS, CAPITOL HILL CAMPUS (JUN

2021)

(a) SAFETY. Trucks making deliveries to the Library of Congress must meet the following minimum clearances: 13 ft high, 9 ft wide and 20 ft long. Contractor vehicles exceeding that limitation shall not be permitted access to the Loading Dock area. The Contractor shall ensure that ceiling; doors or walls are not disturbed or damaged. The Contractor shall be held responsible for all costs of repairs to ceiling, doors, etc. and any secondary damage resulting from that damage. The maximum ceiling height inside the loading dock is 14′-8″.

(b) SECURITY. The contractor must adhere to all Library of Congress and U.S. Capitol Police physical security protocols and offsite screening procedures. These requirements may change during the course of the contract and it is the responsibility of the contractor to stay in compliance with current regulations. The most current procedures for accessing only the Madison Loading Dock are as follows:

(c) SCREENING PROCESS FOR ALL VEHICLES COMING TO LIBRARY OF CONGRESS LOADING DOCKS & JEFFERSON EAST

PARKING LOT FREIGHT ELEVATOR

Process includes all trucks, cars and vans coming to the LC Capitol Hill campus. All contractors are now required to notify the Off-Site Delivery Center (OSDC) no later than 24 HOURS PRIOR TO ARRIVAL (48-72 hours if possible)

Contractors are required to have a letter on file with the U.S. Capitol Police. The letter must be on company letterhead accompanied by signature of the owner, president or manager and sent directly to the OSDC email:

OSDCAdmin@USCP.GOV and the COR. The letter shall be protected with a password, and the password shall be sent separately. Requests for access must be renewed every year and should contain the following information:

1. Company Name,

2. Drivers/Employee Names requiring access,

3. Social Security Number for each Driver/Employee,

4. Date of Birth for each Drive Employee,

5. Driver License Number,

6. Vehicle make, model, tag number,

7. Building(s) to be accessed,

8. COR’s name and phone number, 030ADV24Q0185 Section D

9. Contract number

All deliveries must include a Bill of Lading and designate a Library Point of Contact (POC) name and telephone number for deliveries. If making more than one delivery on the Hill, make the Library of Congress your last stop. If you do not, you will have to go through the screening process again after leaving the Library.

Vehicles leaving the Library are not resealed.

(d) DELIVERIES BEFORE 3:00 P.M. – OFF-SITE DELIVERY CENTER (OSDC)

The OSDC is open Mon-Fri. 4:30 a.m. to 3:00 p.m. at 4700 Shepherd Parkway S.W. for screening by the U.S. Capitol Police. Once cleared, proceed to D Street and Delaware Avenue S.W. (open Mon-Fri.4:45 am – 3:00 pm) to gain access to Capitol Hill. The OSDC phone number is (202)224-0202.

When a vehicle enters the OSDC:

1. Drivers information is checked.

2. Truck unloaded and material X-rayed and screened.

3. Material is replaced and the vehicle is sealed.

4. Vehicle proceeds to Delaware Avenue, seal is verified, and truck is cleared to first destination.

5. If multiple deliveries on the Hill the vehicle will be resealed upon departure from each delivery location – except the Library of Congress.

6. Vehicle arrives at the Library of Congress. The seal is verified and removed by the police.

(e) DELIVERIE S AFTER 3:00 P.M. Weekdays or Saturday – ALL DELIVERIES / WITH COORDINATION WITH USCP LIBRARY DIVISION (Exception basis for same day delivery only)

Provide all information as above and copy the Library Division at police_support@loc.gov (underscore between police and support) and a fax to (202) 707-1030 and include the estimated arrival time. The inspection location is the 600 block of New Jersey Ave. S.E., and C St NW near the power plant. Call the Library Division at (202) 707-1000 who will arrange for the vehicle to be swept. The vehicle will then be escorted to the Library. All containers have a designated placement location and the Contractor shall not leave any container in any area except those identified in this contract. This expressly designates Independence Avenue, C Street, 1st, 2nd, 3rd Streets and East Capitol Street, SE as areas off limits for staging of containers. All delivery vehicles shall have clearly identified company signage. Driver and all onsite staff shall wear distinguishable company uniform and/or company ID. The Contractor shall not travel beyond the dock area of the Madison Loading Dock. The Contractor shall comply with the Library security procedures. Contractor will be briefed by the COR on Library’s security procedures currently in effect. The security procedures vary periodically.

(End of Clause)

030ADV24Q0185 Section F

SECTION F - DELIVERIES OR PERFORMANCE

F.1 52.247-34 F.O.B. DESTINATION (NOV 1991)

(a) The term "f.o.b. destination," as used in this clause, means—

(1) Free of expense to the Government, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and

(2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or "constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including "piggyback") is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for "heavy or bulky freight." When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarder for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.

(b) The Contractor shall—

(1)(i) Pack and mark the shipment to comply with contract specifications; or

(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;

(2) Prepare and distribute commercial bills of lading;

(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;

(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;

(5) Furnish a delivery schedule and designate the mode of delivering carrier; and

(6) Pay and bear all charges to the specified point of delivery.

(End of Clause)

F.2 LC52.215-5 PLACE AND PERIOD OF PERFORMANCE (JAN 2019)

Place of Performance: Library of Congress

Washington DC

- John Adams building

- James Madison building

- Thomas Jefferson building

030ADV24Q0185 Section F

The overall period of performance shall be as stated in section B.

The contractor is responsible for determining its hours of operation in fulfilling the requirements of this contract. The Library’s standard operating hours are from 8:30 AM through 5:30 PM, Monday through Friday, excluding Federal holidays. The contractor shall coordinate with the COR for any work to be conducted at Library facilities.

030ADV24Q0185 Section G

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 LC52.201-1 CONTRACTING OFFICER'S REPRESENTATIVE (COR) APPOINTMENT AND

AUTHORITY (JAN 2016)

(a) Performance of work under this contract is subject to the technical direction of the COR. The term “technical direction” includes, without limitation, direction to the contractor that directs or redirects the labor effort, shifts the work between work areas or locations, and/or fills in details and otherwise serves to ensure that tasks outlined in the contract are accomplished satisfactorily.

(b) Technical direction must be within the scope of the contract specification(s)/work statement. The COR does not have authority to issue technical direction that:

(1) Constitutes additional work outside the contract specification(s)/work statement;

(2) Constitutes a change as defined in the “Changes” clause of this contract;

(3) Causes an increase or decrease in the contract price, or the time required for contract performance;

(4) Changes any of the terms, conditions, or specification(s)/work statement of the contract;

(5) Interferes with the contractor's right to perform under the terms and conditions of the contract; or

(6) Directs, supervises or otherwise controls the actions of the contractor's employees.

(c) Technical direction may be oral or in writing. The COR must confirm oral direction in writing within five workdays, with a copy to the Contracting Officer.

(d) The Contractor shall proceed promptly with performance resulting from the technical direction issued by the COR.

If, in the opinion of the contractor, any direction of the COR or the designated representative falls within the limitations of (b) above, the contractor shall immediately notify the Contracting Officer no later than the beginning of the next Government work day.

(e) Failure of the Contractor and the Contracting Officer to agree that technical direction is within the scope of the contract shall be subject to the terms of the “Disputes” clause of this contract.

(End of Clause)

G.2 LC52.201-3 CONTRACT ADMINISTRATION (AUG 2015)

This contract will be administered by:

Library Contracting Officer: Leonard, David

Address: Contracts & Grants Directorate

Library of Congress

LA 325

Washington DC 20540-9411

Phone:

Email: dleonard@loc.gov

Library Contract Specialist: Schultz, Abigael

Address: Contracts & Grants Directorate

Library of Congress

LA 325

Washington DC 20540-9411

Phone:

Email: aschultz@loc.gov

Library Contracting Officer Representative: Morgan, Telfany

Address:

Phone:

Email:

Contractor Contract Administrator: Provided at time of award

Address: Provided at time of award

Provided at time of award

Provided at time of award

Provided at time of award

Phone:

Email:

G.3 LC52.204-5 IDENTIFICATION AND BUILDING PASSES (DEC 2014)

(a) The Contractor shall schedule with the COR time for contractor staff to be available to receive Library-issued photo identification badges prior to starting work.

(b) The Contractor shall provide instruction and ensure that each employee performing work under this contract displays their photo-identification badges at all times they are present on-duty in the building. Refusal or repeated neglect to display the photo-identification may result in an unsuitability determination.

(c) Upon termination, resignation or other event leading to a contract employee leaving duty under this contract, the Contractor is responsible for returning all Government identification, building passes, keys, and other Government property issued to that employee. Failure on the part of the Contractor may result in the Contractor’s liability for all costs associated with correcting the resultant breach in building security.

(d) The requirements of this clause are applicable to and shall be observed by all subcontractors who perform work at all Library of Congress facilities.

(e) The Contractor shall ensure that all employees, both directly employed and subcontracted, contractor’s and sub-contractors, obtain Library ID badges. Badges shall be visibly displayed at all times while in Library premises. The Library will issue badges without charge. Contractor shall accurately maintain a list of employee badge number on the Employee Roster and provide updates to the COR upon request. An employee’s badge shall be returned within 5 days from the termination of that employee’s employment. All badges shall be returned at the completion/termination of the contract.

(End of Clause)

G.4 LC52.232-1 LIBRARY OF CONGRESS INVOICE INSTRUCTIONS (DEC 2022)

The Contractor must prepare and submit invoices electronically to: https://www.ipp.gov. The Contractor may submit payment requests using other than electronic means only when alternate procedures are authorized by the contracting officer in writing. Assistance is available via the IPP Help Desk via email at: ippcustomersupport@fiscal.treasury.gov or by commercial telephone at (866) 973-3131. Invoices shall contain the information required in FAR 52.212-4, paragraph (g).

030ADV24Q0185 Section H

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 LC52.203-1 CONTRACTOR PUBLICITY (OCT 2013)

The Contractor, or any entity or representative acting on behalf of the Contractor, may not refer to the equipment or services furnished pursuant to the provisions of this contract in any news release or commercial advertising, or in connection with any news release or commercial advertising, without first obtaining explicit written consent to do so from the Contracting Officer. Should any reference to such equipment or services appear in any news release or commercial advertising issued by or on behalf of the Contractor without the required consent, the Government will consider institution of all remedies available under applicable law.

(End of Clause)

H.2 LC52.204-1 COLLECTIONS SECURITY (DEC 2013)

(1) The Library is a public institution responsible for making its resources (collections and staff) available to the Congress and the American people. To achieve a balance between access and security, the Library requires everyone (staff, visitors, interns, contractors, etc.), to always use due diligence and protect its assets during use.

(2) Physical access to Library collections is limited to staff and/or determined by the host office. In addition, established requesting processes in the various readings rooms must be followed.

(3) Loan Privileges. Contractor employees may obtain loans of Library property for internal use and Library work-related purposes.

i. Loan of Library Property. All loans of Library property must be approved and documented by the host Library Services office. Contractor staff shall obtain a Library “General Pass” (Form LW 12/54 (rev2/88)) for each loan.

ii. Liability – Loss or Damage of Library Property. Use or loan of all Library property and signature on this contract means that the contractor acknowledges and agrees to:

(a) ensure the return all Library property issued in the same condition as borrowed;

(b) accept responsibility and liability for the negligent loss or damage of issued or borrowed Library property; and

(c) ensure that the loaned property is used for Library purposes and not loaned to any other person.

(End of Clause)

H.3 LC52.204-2 CONDUCT ON LIBRARY PREMISES (JUL 2021)

1. Access to Library buildings and grounds is governed by 36 C.F.R. part 702 - Conduct on Library Premises. Contractor staff must comply with these requirements and restrictions and related Library of Congress Regulations and Directives.

2. The Library is committed to preventing and addressing all forms of discriminatory harassment and to ensuring that Equal Employment Opportunity (EEO) principles are fundamental to Library culture. Everyone — employees, interns, volunteers, contractors, researchers, and visitors — is expected to help make the Library a respectful environment free from offensive behavior.

a. Library of Congress employees, contractors, interns, volunteers, researchers, patrons, and other visitors have a right to Library facilities that are free from discrimination based on their race, color, national origin, religion, sex, sexual orientation, gender identity, age (40 and over), disability, genetic information, union affiliation, political affiliation, or marital status.

b. The Library does not tolerate discrimination – including sexual harassment, other forms of harassment, or a hostile work environment – based on these factors. The Library does not tolerate retaliation against anyone who engages in any form of protected EEO activity.

c. Contractor (including subcontractor) staff alleged to have engaged in discrimination or retaliation in the performance of this contract may be prohibited from entering Library facilities to perform work under their contracts.

Contractors are required to promptly respond to all Library inquiries into allegations of discrimination, and must, in good faith, cooperate with Library investigations. Good faith cooperation includes, but is not limited to, making contractor staff available for:

1. Formal and informal interviews by Library agents investigating allegations of discrimination;

2. Reviewing and signing appropriate affidavits or declarations summarizing statements provided by such contractor staff during the course of an investigation;

3. Producing documents requested by the Library agents conducting the investigation; and

4. Preparing for and providing testimony in depositions or in administrative hearings.

(End of Clause)

H.4 LC52.204-4 CONTRACTOR EMPLOYEE FITNESS (AUG 2023)

“Contractor employee fitness” means fitness based on character and conduct for work for or on behalf of the Government as a contractor employee.

Work under this contract is unclassified. However, the Library of Congress has a contractor employee fitness program, which includes background investigations of contractor personnel who will have 1) regular, ongoing, unescorted access to the Library’s buildings, grounds, or collections, 2) access to Library information technology systems, and/or 3) access to Library information not available to the public including information determined to be Controlled Unclassified Information (CUI) to ensure they meet basic standards of honesty and trustworthiness pursuant to Library regulations.

(1) Any access to non-public Library facilities, Library information technology systems, or non-public Library information will require completion and successful vetting of a security application request (release forms, fingerprints, and, if applicable, a full background investigation). Contractors should anticipate a minimum of two weeks for the process, provided all requested information is timely, accurate and complete and that no adverse information is received.

(2) The Library does not determine the fitness of employees to work for the contractor firm that hires them. The Library’s interest is in determining whether contractor personnel should be granted greater access than the general public to Library facilities, Library information technology systems and/or non-public Library information.

(3) To facilitate the fitness determination, contractors shall submit complete and accurate information as identified on the National Background Investigation Services (NBIS)’s eAPP https://www.dcsa.mil/Systems-Applications/NBIS-eApp- NBIS-Agency/) as provided by the Personnel Security Division. Contractors should anticipate a minimum of two weeks for the process, provided all requested information is timely, accurate and complete and that no adverse information is received.

(4) The contractor will ensure the Library’s Personnel Security Division is notified of all changes to personnel performing work on this contract. The Personnel Security Division can be notified at the following email address:

PSD@loc.gov and contacted via phone at: (202) 707-5618.

(5) The fact that the Library may conduct background investigations on assigned contractor personnel does not relieve the contractor of the responsibility to provide qualified, reliable personnel of sound character and conduct.

(6) The Library may require removal of contractor staff from Library facilities and revocation of access to Library information technology systems and non-public Library information if investigative results raise concerns regarding a contractor employee’s fitness. In such cases, the Contracting Officer or Contracting Officer Representative (COR) will notify the contractor of the unfit determination and need for the contractor employee to return all government equipment such as badges, keys and network tokens if issued. Contractor management staff may be required to escort the contractor employee from the premises.

(End of Clause)

H.5 LC52.237-2 CONDUCT OF WORK (MAY 2015)

The personnel employed by the Contractor shall be capable employees qualified in this type of work. The Contractor shall be responsible for all damage to Library property by the activities of his employees resulting from these operations.

The Contracting Officer may require removal from work on this contract any employee(s) that may be deemed incompetent, careless, insubordinate, unsuitable, or otherwise objectionable, or whose continued employment is deemed contrary to the public interest or inconsistent with the best interest of or the security of the Library.

030ADV24Q0185 Section I

PART II - CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES

I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far

FAR Number Title Date

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2018

52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES

NOV 2023

52.233-1 DISPUTES MAY 2014

52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND

VEGETATION

APR 1984

52.243-1 CHANGES—FIXED PRICE ALTERNATE I (APR 1984) AUG 2018

52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS ALTERNATE I (JUN

2010)

DEC 2010

52.253-1 COMPUTER GENERATED FORMS JAN 1991

I.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES

OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB

2024)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204–23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115–91).

(3) 52.204–25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115–232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.232–40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[] (1) 52.203–6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

[] (2) 52.203–13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).

[] (3) 52.203–15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

[] (4) 52.203–17, Contractor Employee Whistleblower Rights (NOV 2023) (41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

[] (5) 52.204–10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109–282) (31 U.S.C. 6101 note).

[] (6) [Reserved]

[] (7) 52.204–14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).

[] (8) 52.204–15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111– 117, section 743 of Div. C).

[X] (9) 52.204–27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L.

117–328).

[] (10) 52.204–28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (DEC 2023) (Pub. L. 115–390, title II).

[] (11)(i) 52.204–30, Federal Acquisition Supply Chain Security Act Orders— Prohibition. (DEC 2023) (Pub. L. 115–390, title II).

[] (ii) Alternate I (DEC 2023) of 52.204–30.

[X] (12) 52.209–6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) (31 U.S.C. 6101 note).

[] (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C.

2313).

[] (14) [Reserved]

[] (15) 52.219–3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) (15 U.S.C. 657a).

[] (16) 52.219–4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

[] (17) [Reserved]

[] (18)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

[] (ii) Alternate I (MAR 2020) of 52.219-6.

[] (19)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

[] (ii) Alternate I (MAR 2020) of 52.219-7.

[] (20) 52.219-8, Utilization of Small Business Concerns (FEB 2024) (15 U.S.C. 637(d)(2) and (3)).

[] (21)(i) 52.219–9, Small Business Subcontracting Plan (SEP 2023) (15 U.S.C. 637(d)(4)).

[] (ii) Alternate I (NOV 2016) of 52.219-9.

[] (iii) Alternate II (NOV 2016) of 52.219-9.

[] (iv) Alternate III (JUN 2020) of 52.219–9.

[] (v) Alternate IV (SEP 2023) of 52.219–9.

[] (22)(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

[] (ii) Alternate I (MAR 2020) of 52.219-13.

[] (23) 52.219–14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 657s).

[] (24) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).

[] (25) 52.219–27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) (15 U.S.C. 657f).

[] (26) (i) 52.219–28, Post-Award Small Business Program Representation (FEB 2024) (15 U.S.C. 632(a)(2)).

[] (ii) Alternate I (MAR 2020) of 52.219–28.

[] (27) 52.219–29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).

[] (28) 52.219–30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m)).

[] (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

[] (30) l(26) 52.219–33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).

[X] (31) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

[X] (32) 52.222–19, Child Labor—Cooperation with Authorities and Remedies (FEB 2024) (E.O. 13126).

[X] (33) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

[X] (34)(i) 52.222–26, Equal Opportunity (SEP 2016) (E.O. 11246).

[] (ii) Alternate I (FEB 1999) of 52.222-26.

[] (35)(i) 52.222–35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

[] (ii) Alternate I (JUL 2014) of 52.222-35.

[X] (36)(i) 52.222–36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

[] (ii) Alternate I (JUL 2014) of 52.222-36.

[] (37) 52.222–37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

[] (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

[X] (39)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).

[] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

[] (40) 52.222-54, Employment Eligibility Verification (MAY 2022). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

[] (41)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 2008) (42 U.S.C.6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[] (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).

[] (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).

[] (44)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

[] (ii) Alternate I (OCT 2015) of 52.223-13.

[] (45)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

[] (ii) Alternate I (JUN 2014) of 52.223-14.

[] (46) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).

[] (47)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

[] (ii) Alternate I (JUN 2014) of 52.223-16.

[X] (48) 52.223–18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O. 13513).

[] (49) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

[] (50) 52.223-21, Foams (JUN 2016) (E.O. 13693).

[] (51)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

[] (ii) Alternate I (JAN 2017) of 52.224-3.

[] (52)(i) 52.225-1, Buy American—Supplies (OCT 2022) (41 U.S.C. chapter 83).

[] (ii) Alternate I (OCT 2022) of 52.225–1.

[] (53)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (NOV 2023) (19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103- 182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

[] (ii) Alternate I [Reserved].

[] (iii) Alternate II (DEC 2022) of 52.225-3.

[] (iv) Alternate III (FEB 2024) of 52.225-3.

[] (v) Alternate IV (OCT 2022) of 52.225-3.

[] (54) 52.225–5, Trade Agreements (NOV 2023) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

[X] (55) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

[] (56) 52.225–26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

[] (57) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150).

[] (58) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C. 5150).

[] (59) 52.229–12, Tax on Certain Foreign Procurements (FEB 2021).

[] (60) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

[] (61) 52.232-30, Installment Payments for Commercial Products and Commercial Services (NOV 2021) (41 U.S.C.

4505, 10 U.S.C. 3805).

[X] (62) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) (31 U.S.C.

3332).

[] (63) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).

[] (64) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

[] (65) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).

[] (66) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).

[] (67)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631).

[] (ii) Alternate I (APR 2003) of 52.247-64.

[] (iii) Alternate II (NOV 2021) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[] (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

[] (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[] (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[] (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

[] (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (MAY 2014) (41 U.S.C. chapter 67).

[] (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (MAY 2014) (41 U.S.C. chapter 67).

[] (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022).

[] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).

[] (9) 52.226–6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records— Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .