This document contains a submittal register for a federal contract solicitation for asphalt paving repairs. The solicitation includes one line item for a roadway full replacement and 14 option line items for other roads and parking areas totaling approximately 12,500 square yards of hot-mix asphalt repair work. The submittal register lists 84 required submissions across six categories: preconstruction submittals, product data, samples, test reports, certificates, and manufacturer's instructions. Examples of required preconstruction submittals include a schedule of prices, accident prevention plan, traffic control plan, and construction waste management plan. Product data must be provided for items like sealants, asphalt, pavement markings, and waterborne paint. Samples will be needed for aggregates, asphalt binder, and backing materials. The contractor must submit test reports and certificates throughout the performance period covering areas such as aggregate testing, asphalt quality control, and reflective media compliance. Manufacturer's instructions are also required for certain materials. The solicitation is being conducted by the Department of the Army National Guard with an estimated value between $1-5 million.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asphalt Paving Submittal-Regist

TITLE:Asphalt Paving RepairSUBMITTAL REGISTER
JOB NAME:ASPHALTPAVING
LOCATION:Delaware Air National Guard Base, New Castle DE
CONTRACT NO:W50S6X-23-R-0006
CONTRACTOR:
CONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITY
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
LineActivity #Transmittal #Specification SectionSD #Submittal DescriptionItem SubmittedParagraph #Classification: GOVT or A/E ReviewerSubmitApproval Needed ByMaterial Needed ByAction CodeDate Of ActionDate FWD to APPR / Auth Date RCD From CONTRDate FWD To Other RevwrDate RCD From Other ReviewerAction CodeDate Of ActionMailed To CONTR/ Date RCD From APPR AuthorityRemarks
101 14 001Preconstruction SubmittalsList of Contact Personnel1.3.1.1
201 14 001Preconstruction SubmittalsAT Level I Training Certificates of Completion1.4
301 20 001Preconstruction SubmittalsSchedule of Prices1.3G
401 30 001Preconstruction SubmittalsView Location Map1.3
501 30 001Preconstruction SubmittalsProgress and Completion Pictures1.4
601 32 16.00 201Preconstruction SubmittalsBaseline Construction Schedule1.2G
701 32 16.00 207CertificatesMonthly Updates1.4
801 33 001Preconstruction SubmittalsSubmittal Register1.7G
901 35 261Preconstruction SubmittalsAccident Prevention Plan (APP)1.7G
1001 35 266Test ReportsMonthly Exposure Reports1.4G
1101 35 266Test ReportsNotifications and Reports1.12G
1201 35 266Test ReportsAccident Reports1.12.2G
1301 35 266Test ReportsLHE Inspection Reports1.12.3G
1401 35 267CertificatesActivity Hazard Analysis (AHA)1.8G
1501 35 267CertificatesHot Work Permit1.9.1G
1601 35 267CertificatesLicense Certificates1.14
1701 35 267CertificatesRadiography Operation Planning Work Sheet1.14.1G
1801 35 267CertificatesPortable Gauge Operations Planning Worksheet1.14.1G
1901 45 00.10 201Preconstruction SubmittalsQC Plan1.6G
2001 50 001Preconstruction SubmittalsConstruction Site Plan1.3G
2101 50 001Preconstruction SubmittalsTraffic Control Plan3.4.1G
2201 50 001Preconstruction SubmittalsContractor Computer Cybersecurity Compliance Statements1.5.1.4G
2301 50 001Preconstruction SubmittalsContractor Temporary Network Cybersecurity Compliance Statements1.5.6G
2401 57 191Preconstruction SubmittalsPreconstruction Survey1.5.1
2501 57 191Preconstruction SubmittalsRegulatory Notifications1.5.2G
2601 57 191Preconstruction SubmittalsEmployee Training Records1.5.3G
2701 57 191Preconstruction SubmittalsEnvironmental Protection Plan1.6G
2801 57 191Preconstruction SubmittalsDirt and Dust Control Plan1.6.5.1G
2901 57 191Preconstruction SubmittalsSolid Waste Management Permit1.8G
3001 57 196Test ReportsMonthly Solid Waste Disposal Report1.8.1G
3101 57 197CertificatesEmployee Training Records1.5.3G
3201 57 197CertificatesContractor Hazardous Material Inventory Log3.6.1G
3301 74 191Preconstruction SubmittalsConstruction Waste Management Plan1.7G
3401 74 1911Closeout SubmittalsRecords (Documentation)1.8G
3501 78 003Product DataWarranty Management Plan1.3.1
3631 00 003Product DataUtilization of Excavated Materials3.3G
3731 00 006Test ReportsTesting3.9
3831 00 007CertificatesTesting3.9
3932 01 19.613Product DataSealants2.1
4032 01 19.613Product DataManufacturer's Recommendations3.4.2
4132 01 19.614SamplesSealants2.1
4232 01 19.614SamplesBlocking Media/Backup Materials2.3.1
4332 01 19.614SamplesBacker Rod3.2.2.1
4432 01 19.614SamplesBond Breaking Tapes2.3.2
4532 01 19.616Test ReportsSealants2.1
4632 01 19.617CertificatesEquipment List3.1
4732 01 19.618Manufacturer's InstructionsSealants2.1
4832 11 233Product DataPlant, Equipment, and Tools2.4G
4932 11 236Test ReportsInitial Tests2.3.1G
5032 11 236Test ReportsIn-Place Tests3.12.1G
5132 11 263Product DataSources of Aggregates1.3.4
5232 11 263Product DataJob Mix Formula2.4.2G
5332 11 266Test ReportsSources of Aggregates1.3.4
5432 11 266Test ReportsBituminous Materials1.3.6
5532 11 266Test ReportsBituminous Materials2.2
5632 11 266Test ReportsTest Section1.5.2G
5732 11 266Test ReportsService Record1.3.4G
5832 11 269Manufacturer's Field ReportsBatch Tickets1.3.3
5932 12 136Test ReportsSampling and Testing3.7
6032 12 16.162Shop DrawingsPlacement Plan2.1G
6132 12 16.163Product DataDiamond Grinding Plan2.1.5G
6232 12 16.163Product DataMix Design2.5G
6332 12 16.163Product DataContractor Quality Control3.1G
6432 12 16.164SamplesAggregates2.2
6532 12 16.164SamplesAsphalt Cement Binder2.3
6632 12 16.164SamplesWarm-mix Additive2.5.1
6732 12 16.166Test ReportsAggregates2.2G
6832 12 16.166Test ReportsQC Monitoring3.1.3.9
6932 12 16.167CertificatesAsphalt Cement Binder2.3G
7032 12 16.167CertificatesLaboratory Accreditation and Validation1.3.11
7132 12 16.167CertificatesWarm-mix Additive2.5.1
7232 17 233Product DataSurface Preparation Equipment List2.1.1.1G
7332 17 233Product DataApplication Equipment List2.1.2G
7432 17 233Product DataExterior Surface Preparation;3.2G
7532 17 233Product DataSafety Data Sheets1.3.1G
7632 17 233Product DataReflective media for roads2.2.3.1G
7732 17 233Product DataWaterborne Paint2.2.1G
7832 17 236Test ReportsReflective Media for Roads2.2.3.1G
7932 17 236Test ReportsWaterborne Paint2.2.1G
8032 17 237CertificatesQualifications1.3.2G
8132 17 237CertificatesReflective Media for Roads;2.2.3.1G
8232 17 237CertificatesWaterborne Paint;2.2.1G
8332 17 237CertificatesVolatile Organic Compound1.3.1G
8432 17 238Manufacturer's InstructionsWaterborne Paint2.2.1G