03-Map 1_Laurel Run Stone Project_9-2021.pdf
PDF 138 KB Posted
- Attached to
- DSA Laurel Run Road - Phase 2 & 3 - FD-19
- Solicitation number
- 6100054004
- Issued by
- Monroe County, Trooper CDP, Pennsylvania
About this file
This document appears to be a map associated with a Laurel Run Road Stone Project for a state or local government entity. The project includes four phases of work totaling approximately 13,020 feet of road improvements along Laurel Run Road, State Highway 55, and surrounding areas. Phase 2 is 3,750 feet, Phase 3 is 1,875 feet, and Phase 4 is 7,395 feet. The map does not provide information on the timing, response requirements, or contract details for this project.
The document does not contain pricing terms, set asides, incumbent contractors, funding details, or other salient information about the contract opportunity beyond the high-level project scope and location details shown on the map.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 04-Map 2_Laurel Run Stone Project B_9-2021.pdf | ||
| DCNR_Reciprocal Limitations Act Form (1).doc | DOC document | |
| 01-Terms & Conditions.pdf | ||
| 02-Laurel Run Phase 2 & 3_FY21 DSA SOW.pdf | ||
| DCNR-Small Business Initiative.pdf | ||
| DCNR_DSA_Attachment A_07-26-2021.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Phase 2 - 3,750 ft.
Phase 3 - 1,875 ft.
Phase 4 - 7,395 ft.
Snow Hill Rd
Schoolhouse Rd State Hwy 55
Legend Phase 4 Phase 3 Phase 2 Phase 1 Road Major Roads State Forest 0.25 0 0.250.125 Miles
Laurel Run Road Stone Project
X x x x x x x x x x
X denotes the stretch of Laurel Run Road to be completed with this project (approximately Phase 2 and Phase 3).
File details come from the government source that posted it. Updated .