03 FBNV240017 - Specifications TOC.pdf
PDF 100 KB Posted
- Solicitation number
- FA487724QA029
About this file
This document is a Table of Contents for the technical specifications related to a federal contract opportunity to upgrade the fire suppression system at a facility at Davis-Monthan Air Force Base in Tucson, Arizona.
The contract will require the design, plans, specifications, and installation of a new fire suppression system in a specific building, including maintaining the existing control system components where possible. The work must comply with base design guidelines, Air Force design standards, and cybersecurity requirements. The contract magnitude is estimated between $250,000 and $500,000 and is set aside for 100% Women-Owned Small Businesses. A site visit is scheduled for August 1, 2024, and the solicitation is expected to be issued around July 13, 2024, with a 225-calendar day performance period. The contract will be awarded based on price and past performance, with price being significantly more important.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
16 April 2024 Table of Contents-1 FBNV 240017
TECHNICAL PROVISIONS OF SPECIFICATIONS
Project No. FBNV 240017
Contractor to furnish all labor, equipment, appliance and materials and perform all operations in connection with project titled Upgrade PGS Fire Suppression at Davis- Monthan AFB, Arizona, in strict accordance with these specifications.
TABLE OF CONTENTS
SECTION AND TITLE
DIVISION 01 - GENERAL REQUIREMENTS
01010 Summary of Work
AF Form 66 – Schedule of Material Submittals 01011 Design Requirements
DIVISION 02 - EXISTING CONDITIONS
02 41 00 [DEMOLITION][ AND ][DECONSTRUCTION]
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS
MATERIALS
02 82 13.00 10 ASBESTOS ABATEMENT
02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING
MATERIALS
02 82 33.13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
02 83 13.00 20 LEAD IN CONSTRUCTION
02 83 19.13 10 LEAD-BASED PAINT ABATEMENT
DIVISION 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
16 April 2024 Table of Contents-2 FBNV 240017
DIVISION 21 - FIRE SUPPRESSION
21 12 00 STANDPIPE SYSTEMS
21 13 00.00 40 FIRE-SUPPRESSION SPRINKLER SYSTEMS
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 25 - INTEGRATED AUTOMATION
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS)
FRONT END AND INTEGRATION
25 50 00.00 20 CYBERSECURITY OF FACILITY-RELATED CONTROL
SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
| SECTION AND TITLE |
| DIVISION 01 - GENERAL REQUIREMENTS |
| DIVISION 02 - EXISTING CONDITIONS |
| DIVISION 05 - METALS |
| DIVISION 07 - THERMAL AND MOISTURE PROTECTION |
| DIVISION 21 - FIRE SUPPRESSION |
| DIVISION 25 - INTEGRATED AUTOMATION |
| DIVISION 26 - ELECTRICAL |
File details come from the government source that posted it. Updated .