03-22-2017 Attachment 3, Roadside Equipment Inspection Form.pdf
PDF 278 KB Posted
- Attached to
- Landscape Services in Five (5) Counties
- Solicitation number
- 6100042168
- Issued by
- Montgomery County, Koppel Borough, Pennsylvania
About this file
This document is an Attachment 3, Roadside Equipment Inspection Form related to a state contract opportunity with the Pennsylvania Department of Transportation (PennDOT). The form requires the contractor to list all vehicles and equipment that will be used for operations under this contract, including work zone traffic control vehicles and equipment. All listed vehicles and equipment must meet the requirements described in the contract specifications and Pennsylvania laws and regulations, and will be inspected and approved by PennDOT during the demonstration(s). If the contractor intends to rent or purchase vehicles and equipment, the identification numbers and other details must be provided with the bid, along with copies of the rental or purchase agreements. The contractor agrees to maintain and update this list of vehicles and equipment for the duration of the contract.
The form also includes instructions for completing the Roadside Equipment Inspection Form, which must be submitted within 3 days of notice of apparent low bidder status. The contractor must verify that all vehicles and equipment listed are adequate and necessary for the contract maintenance work, and that they will be available at the initial demonstration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This page is to be completed and returned within 3 days of notice of apparent low bidder status.
License or
Identification Number
Purpose
Type of
Vehicle or Equipment
Capacity/ Size
For PennDOT Use Only
Equipment Provided At
Demonstration (Pass/Fail)
Comments
The Contractor hereby verifies that all vehicles and equipment in the above table as submitted with the bid is adequate and necessary for the contract maintenance work and all listed vehicles and equipment will be available at the initial demonstration.
Completed By: ______________________________________ Date: __________
Name of Company: __________________________________________________
Service: ___________________________________________________________
For PennDOT Use Only:
•Initial or Second Demonstration: ___________________ Date of Demonstration: ______________________
•Location of Demonstration________________________________________________________________________
•By: __________________________________________________________________________________________
•Overall Demonstration (Pass/Fail): __________________________________________________________________
•Demonstration Notes:_____________________________________________________________________________
Attachment 3 - Roadside Equipment Inspection Form
Instructions On Completing Roadside Equipment Inspection Form Attachment:
a) List Only the Vehicles and Equipment that will be used for operations under this Contract, including Work Zone Traffic Control Vehicles and Equipment.
b) Vehicles and equipment utilized for operations under this maintenance contract work must meet the requirements as described in the contract specifications and the laws and regulations of
Pennsylvania.
c) All vehicles and equipment in the above table shall be inspected and approved by PennDOT during the demonstration(s).
d) Where a Contractor intends to rent vehicles and equipment, the identification number or license number on the table above may be provided at the time of the initial demonstration; however, all remaining information for the rented vehicles and equipment must be provided in the table above with the bid, and a copy of the rental agreement must be attached to the Roadside Equipment
Inspection Form at time of original submittal. If the rental agreement is for multiple pieces of equipment, Contractor shall highlight the items that will be used for operations under this
Contract
e) Where a Contractor intends to purchase vehicles and equipment, the identification number or license number on the table above may be provided at the time of the initial demonstration;
however, all remaining information for the purchased vehicles and equipment must be provided in the table above with the bid, and a copy of the purchase agreement must be attached to the
Roadside Equipment Inspection Form at time of original submittal. If the purchase agreement is for multiple pieces of equipment, Contractor shall highlight the items that will be used for operations under this Contract.
f) The Contractor agrees to maintain and, as applicable, update this list of all vehicles and equipment after start of work for the duration of the contract.
g) This Roadside Equipment Inspection Form Attachment is to be completed and returned within
3 days of notice of apparent low bidder status.
File details come from the government source that posted it. Updated .