(02)SOW.pdf

PDF 4 MB Posted

Attached to
Purchase, Removal and Installation of a 100kw Propane Generator
Solicitation number
12444226Q0002
Issued by

About this file

This is a Statement of Work (SOW) for the removal and installation of a 100kw propane generator at the Bude Workcenter, located on the Homochitto National Forest in Franklin County, Mississippi (3085 Highway 98 East, Meadville, MS 39653). The contractor shall provide all materials, labor, equipment, tools, transportation, permits, licenses, supervision, and expertise necessary to complete the project, including site cleanup and off-site disposal of materials. The specific equipment to be installed is an RG10090AVAC Protector Gaseous 120/240 Single Phase Liquid Cooled Generator, along with installation of equipment, equipment rental (including a 6526R battery), and hookup of existing propane fuel to the generator. Work shall be performed during normal hours of 7:30 a.m. to 4:00 p.m., Monday through Saturday, excluding the eleven federal holidays. The contractor must notify the district two days prior to beginning work and ensure all personnel use necessary personal protective equipment and follow all safety requirements.

The contractor must submit a written quality control program no later than five days prior to the contract start date and provide a comprehensive employee list with contact information before work begins. Reports and job-related data must be submitted within three business days of request, and the contractor is responsible for providing replacement personnel immediately if any employee cannot complete assigned work. All work must comply with OSHA guidelines and be completed without damage to outdoor structures, hardware, or signs; the contractor bears the cost of correcting any damage caused by its employees. The government will conduct unannounced inspections and review submitted reports and complaints to evaluate performance. Delivery is FOB Destination to the Bude Workcenter facility.

View the file

Other files

File Type Posted
12444226Q0002 Additional Questions and Answers.pdf PDF
12444226Q0002 Questions and Answers.pdf PDF
12444226Q0002.pdf PDF
(01)WD Franklin County MS.pdf PDF
SF1449.pdf PDF
(04) Exhibit-B.pdf PDF
(03) Exhibit-A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Forests in Mississippi, Homochitto Ranger District Statement of Work – 100kw propane generator Replacement

A. GENERAL: Contractor shall provide all materials, labor, equipment, tools, transportation, permits, licenses, supervision, expertise, and other incidentals necessary to successfully complete removal and installation of a 100kw propane generator.

B. Clean up the site and dispose of materials off of the Forest Service property, at the Bude Workcenter, 3085 Highway 98 East, Meadville, Ms 39653.

B. WORK HOURS:

1. Normal Work Hours: 7:30am – 4:00pm, Monday through Saturday.

2. The eleven (11) holidays observed by the Federal Government are: New Year’s Day, Martin Luther King’s Birthday, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day and Christmas Day and any other day specifically declared by the President of the United States to be a national holiday.

C. SPECIFICATIONS:

1. Safety

a. The contractor shall inform the district 2 days prior to beginning work.

b. The contractor shall use necessary PPE to complete the job safely.

2. All tasks accomplished by the contractor personnel shall be done so as to preclude damage or disfigurement of outdoor structures, hardware, and signs. The contractor shall correct any damage caused by their employees to any part of the building, hardware or signs in any area covered by this contract at the contractor’s expense.

3. Replace current generator with RG10090AVAC Protector Gaseous 120/240 Single Phase Liquid Cooled Generator

4. Installation of equipment, equipment rental, which includes a 6526R battery to the existing electrical transformer/components already on site.

5. Hook-up existing propane fuel to generator

D. GOVERNMENT FURNISHED EQUIPMENT/SUPPLIES

E. QUALITY ASSURANCE: All work shall be completed using all best safety requirements. The

Government will receive and investigate complaints from various customers located at the Federal Agency location and other locations associated with this contract. All information received will be provided either verbally and/or in writing to the contractor for appropriate action. All incentives and penalties will be judged according to unannounced inspections, direct observations or inspections, and COTR review of submitted reports or substantiated complaints by building occupants.

F.

1. Contractor Quality Control Program

a. The contractor shall have a quality control program to assure all requirements of the contract are met as specified. The program shall be detailed and provided in writing to the Contracting Officer or his/her designee. The program shall be continuously improved to keep in compliance with OSHA, Joint Commission, and Infection Control guidelines.

b. The contractor shall provide upon request all documentation regarding this Quality Control program including guidelines and inspection results.

2. Periodic Progress Meetings

a. The Contracting Officer, COTR, or other government personnel as appropriate and the contractor shall have periodic meetings to discuss the contractor’s performance. Items for discussion include, but are not limited to inspection results, customer complaints, opportunities to improve performance, steps taken by the contractor to prevent occurrences in the future. The contractor shall provide a summation of unsatisfactory findings and customer complaints and provide insight into any identified trends.

G. OTHER REQUIREMENTS: All items are contained in this subsection are required to be provided by the contractor by the listed deadline and are subject to penalties for delinquency.

Requirement Timeline/Deadline/Specification

Contractor Quality Control program Written submission of program no later than 5 days prior to starting date of contract

Provide Reports / Job related data upon request. Contractor is required to provide reports and job-related data within 3 business days of request.

Reports may include but are not limited to (for each location): hours worked, supplies consumed, accident reports, summary of quality assurance program results, summary of complaints, etc.

List of Employees Contractor shall provide comprehensive list of employees, by contract location, prior to the start of the contract. The employee list must include good contact phone numbers for each employee as well as all completed training as proof of compliance with all applicable laws and requirements.

Seamlessness of Service Contractor is responsible to provide replacement personnel immediately if any in their employment cannot complete the work assigned.

There shall be no instances where work is not performed as required and in accordance with Work Hours (section B).

PROJECT DESCRIPTION OF WORK

Generator Replacement at Bude Work Center Facility Homochitto National Forest

Meadville, MS

Project Description of Work:

The Bude Work Center is located on the Homochitto National Forest in Franklin County. The directions for finding the Work Center Building are to take U.S. 84 to Meadville, take Gloster Road to Yap Road and then to U.S. Hwy 98. The facility will be approximately 3 miles south on U.S. 98 from intersection of Yap Road and Hwy 98. See the location map below.

This project will involve the removal of an existing 100kw Generac Generator and the installation of a new 100kw Generator.

Listed below are Service Items:

RG10090AVAC Protector Gaseous 120/240 Single Phase Liquid Cooled Generator

Installation of equipment, equipment rental, including a 6526R Battery

Natural Gas is currently hooked up on site as well as an Electrical Transformer

-----END OF SOW-----