02339 Watering.docx
DOCX document 17 KB Posted
- Attached to
- BLUEBANK LOW WATER CROSSING Federal contract opportunity
- Solicitation number
- 140L6220Q0085
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L6220Q0085_Amd_0001.pdf | ||
| 140L6220Q0085 AMD 0001 Questions and Answers (1)_0001.docx | DOCX document | |
| LOW WATER CROSSING DETAIL.pdf | ||
| BlueBankRdDamage2020.pdf | ||
| 01009 General Information and Requirements.docx | DOCX document | |
| Sol_140L6220Q0085.pdf | ||
| Bid Schedule Bluebank Low Water Crossing.xlsx | XLSX spreadsheet | |
| 02378 Aggregate and Filter Fabric.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WATERING
PART 1: GENERAL
1.1 SUMMARY
A. Section Includes: Distributing and applying water required for excavation, compaction of low water crossing across the roadway.
B. Related Sections
General Information and Requirements Section 01009
1.2 PROJECT/SITE CONDITIONS
A. Water Source: The Contractor shall furnish the water source for the work.
PART 2: PRODUCTS
2.1 MATERIALS
A. Water: Shall be clean and free from harmful amounts of oils, acids, alkalis, salts and organic materials. Potable water is acceptable.
2.2 EQUIPMENT
A. Requirements: Provide necessary pumping equipment, piping, tanks, water trucks, and measuring devices. Water trucks shall be equipped with a spray bar of adequate capacity and design to ensure uniform application of water in the amounts designated. Measuring devices shall be approved by the Contracting Officer.
PART 3: EXECUTION
3.1 APPLICATION
A. Compaction: Water shall be applied uniformly to each layer of backfill to obtain the optimum moisture content determined by AASHTO T 217 or T 239. The moisture content shall be ±2% of optimum unless otherwise approved. The amount of water used in compaction shall be sufficient to obtain the percent relative compaction required.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract. [
END OF SECTION
WATERING
04/2020 WFO BlueBank Low Water Crossing Project 02339 -