Performance_Work_Statement_Bldg_2000_Demolition.pdf
PDF 126 KB Posted
- Attached to
- NAIHS/GSU - BLDG. 2000 DEMO PROJECT Federal contract opportunity
- Solicitation number
- 020-G14-16-0171
About this file
Performance Work Statement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| GIMC_Main_Hospital_4_East_Wing_Lead_and_Asbestos_Report.pdf | ||
| combined_synopsis_format_-_Bldg._2000_Demo.pdf | ||
| DOC491.pdf | ||
| combined_synopsis_format_-_Bldg._2000_Demo.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION #020-G14-16-0171 – GALLUP 4TH FLOOR, WEST WING DEMO
PROJECT.
Gallup Indian Medical Center
Bldg. #2000, 4th Floor, East Wing Demo & Lead/Asbestos Abatement
Project Number: NA15GA001H8
PERFORMANCE WORK STATEMENT
1.0 Scope: The Contractor shall provide Construction services for the provision of Demolition and Lead/Asbestos Abatement to specified interior walls of Building #2000, 4th Floor, East
Wing at Gallup Indian Medical Center, Gallup, New Mexico, as defined in this PWS.
1.1 Introduction: Navajo Area Indian Health Service (NAIHS), Gallup Indian Medical
Center, Building 2000, is known as GIMC Main Hospital. The 4th Floor, East Wing where this project area is comprises of 5,262 square-feet. GIMC Main Hospital was built in 1961 and has a total square-footage of 136,726.
1.2 Background: Bldg. #2000, is a building classified as mixed occupancy. In Feb.
2012 an Environmental Consulting Firm took samples and identified Lead and
Asbestos inside of Bldg. #2000.
Bldg. #2000, 4th Floor, East Wing renovation for Eye Clinic Staff Project is a prerequisite project of overall GSU Emergency Department (ED) Expansion Project;
The primary objective of this project is to abate any Lead and Asbestos and demolish the identified areas on attached drawing at Main Hospital, 4th Floor, East Wing and make it ready for renovation work.
2.0 General Information:
2.1 Safety/Environmental: The contractor shall comply with all federal and state OSHA requirements and standards, technical orders, regulations, and referenced publications as published in the OSHA 29 CFR. The Safety Officer or Facility Manager may issue an order to the contractor or employee(s) to stop all or part of the contractor’s work until all violations are corrected. Bio-environmental Engineering personnel, who notice violation of OSHA or local standards, will notify the Contracting Officer who has the authority to stop all or part of the contractor’s work. The contractor shall not be excused for unsatisfactory performance that may result from a stop work order.
2.2 Accident prevention and safety practices on contractual work under the jurisdiction of the Contracting Officer are the responsibilities of the contractor concerned. The contractor shall brief all employees on proper safety and accident reporting. The contractor shall provide all occupational health services to his employees. Contractor employees shall be instructed to notify the contractor’s Contract Manager of potential or existing occupational health hazards that require attention.
2.3 Liability. The contractor hereby agrees to release the Government (to include its officer, enlisted personnel, agents, and employees) from any liability for any loss, damage, or injury sustained by the contractor or his employees during the performance of this contract. The contractor also agrees to indemnify the Government for any loss, damage, or injury to Government personnel or agents or other third parties, provided such loss to the Government is caused by the negligence of the contractor or his personnel while performing this contract.
2.4 Handling, Storage and Disposal of Hazardous Waste (HW). All HW shall be handled and stored in strict compliance with federal, state and, local regulations. Contractors will be held fully liable for any negligence that results in a Notice of Violation or other penalty. HW will be defined as a solid or liquid waste which exhibits a characteristic such as flammability, corrosivity, reactivity, or toxicity, as identified in 40CFR
261.20-261.33 (Code of Federal Regulations: Discarded commercial chemical products, off-specification species, container residues, and spill residues). Any mixture of a solid or liquid waste and a listed HW is also considered a HW. It must be understood that proper management of any waste generated, hazardous or non-hazardous, shall and will be the responsibility of the Contractor.
2.5 Government Observations and Inspections. Government personnel other than the
Contracting Officer and CORs may occasionally observe contract operations. These personnel will not, however, interfere nor provide direction to the contractors’ performance.
3.0 Applicable Documents: Please see reference regulations listed below.
OSHA
IBC
Manufacturer Guidelines
NFPA 99 and 101
Guidelines for Design and Construction of Health Care Facilities
4.0 Definitions:
4.1 Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
4.2 Contractor Officer. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government.
Note: The only individual who can legally bind the government.
4.3 Contracting Officer Representative (COR). An employee of the U.S. Government designated by the Contracting Officer to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations.
This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
4.4 Contractor Performance Assessment Report (CPAR): A report that assesses a contractor’s performance and provides a record, both positive and negative, on a given contract for specific period of time.
4.5 Federal Acquisition Regulation (FAR): The FAR is the primary regulation for use by all Federal Executive agencies in their acquisition of supplies and services with appropriated funds.
4.6 Materials: All materials used must be of high grade quality and ready for repairs that can with stand severe weather conditions.
4.7 Personal Protective Equipment (PPE): The equipment used to protect medical personnel from exposure to biological, chemical, and radioactive hazards.
5.0 Government Furnished Property and Utility Services:
Government will not provide any labor, tools, material, supplies, transportation, equipment, supervision or other items to perform required services.
The Government shall make all reasonably required amounts of utilities available to the
Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer.
The Contractor shall carefully conserve any utilities furnished without charge.
The Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting
Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia.
6.0 Contractor Furnished Property. Except for the property and utility services specified in section 5.0 as government furnished, the contractor shall provide all tools, materials, supplies, transportation, equipment, personnel, project management and all other necessary items for a complete and useable project.
7.0 Performance Requirements:
Contractor shall abate any lead and asbestos from 4th floor, east wing.
Contractor shall demolish interior walls at specified on the attach demolition plan.
Contractor shall remove all drywall, flooring, ceilings, insulation, doors and other interior materials (except for structural frames and areas identified by Facilities Manager or designee)
Contractor shall be responsible for properly disposing of all debris as a result of this project.
Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the COR.
Contractor shall continue to keep surrounding rooms/areas operational at all times during this repair and/or construction period (Work before 8AM and after 5PM is permitted to minimize disturbances to Patients Services)
Contractor shall conduct a Pre-construction Meeting before starting with any work including mobilization and provides specific details regarding the date, time, and location of the meeting, any need for attendance by subcontractors, and information regarding the agenda items to be discussed.
Contractor shall before any work is started, conduct a thorough survey with the Facilities
Manager of areas in which alterations occur and areas which are anticipated routes of access and furnish a clear construction schedule with specific start and finish dates for each task
Contractor shall provide a 120 hours (5 Days) prior notice to Facilities Manager before conducting any work (to coordinate for security badges, parking and staging areas for equipment)
Contractor shall inform Gallup Maintenance personnel daily of the exact locations of work being performed.
Patients, staff rooms and office windows are to be covered for privacy if necessary.
Contractor shall develop and maintain a comprehensive safety plan/program. All contractors’ personnel onsite must use Personal Protective Equipment (PPE) that meets
OSHA requirements.
Contractor shall comply with Hospital’s Interim Life Safety Measure (ILSM) and Infection
Control Risk Assessments (ICRA) while doing business on IHS property. All work areas shall be maintained in a clean and orderly condition with NO piling of demolished materials.
All workmanship shall be of high standard.
Any scratches or other damages caused during construction of this project must be fixed immediately.
Any major repairs or any shutdowns are to be approved by Facilities Manager.
Train and provide recommendations to Gallup Maintenance Staff on the best solutions to continuously maintain buildings in excellent conditions
Provide detailed technical specifications and owner’s manuals of all installed materials and equipment (2 copies) [if applicable]
Inspection is to be made for final approval of the project; by Facilities Manager.
8.0 Designated Contracting Officer Representative (COR):
Ali S. Ali, Facilities Manager, COR
Phone: 505-722-1558
Cell: 505-409-6026
Email: ali.ali@ihs.gov
Gallup Maintenance Staff, Points of Contact:
Brian Johns, Maintenance Supervisor
Office: 505-722-1557
Cell: 505-977-6664
Email: Brian.Johns@ihs.gov
Ervin King, Carpenters Leader
Office: 505-722-1554
Email: Ervin.King@ihs.gov
9.0 Work Hours: All site work shall be performed between 8:00 am and 5:00 pm, Monday through Friday and during evening hours and on weekends as agreed upon by Contracting
Officer in concurrence from Facilities Manager. Work outside of these business hours is permitted after authorization from Facilities Manager or designee
10.0 Contractor Qualification Requirements: Contractor to be license to perform work in the state of New Mexico. Contractor is required to have qualified construction workers that are primarily trained in Lead and Asbestos abatement, demolition and associated repair work.
Contractor is to have a DUNS number and an SAM registration.
11.0 Performance Requirements Summary:
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance.
Task Performance Standard Quality Assurance Surveillance
Method / By COR
Removal of
Lead/Asbestos
Contractor shall remove lead and asbestos from interior structure of
4th Floor, East Wing, Bldg. #2000
100% of the lead/asbestos is removed.
Periodic inspection and upon completion
Demolition
Demolish interior walls of Bldg.
2000, 4th Floor, East Wing as specified.
100 % of specified area is demolished.
Periodic inspection and upon completion
Disposal
All debris is removed and properly disposed.
100% of debris is removed and properly disposed of.
Periodic inspection and upon completion
Cleaning
Upon completing the work, the
Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the COR.
Identified work areas are cleaned.
Periodic inspection and upon completion
File details come from the government source that posted it. Updated .