02-SOW-NBPL HDA-MURALS.docx

DOCX document 46 KB Posted

Attached to
Mixed Media Art Installation for Point Loma
Solicitation number
N00244-26-Q-0060
Issued by

About this file

This is a Statement of Work (SOW) for the fabrication, delivery, and installation of custom mixed media art displays and murals at the HDA CZ Hall Gallery located in Point Loma. The work is being procured by the Department of the Navy Naval Supply Systems Command under Solicitation Number N00244-26-Q-0060.

The SOW outlines the contractor's responsibilities to design, fabricate, and install mixed media art installations that meet specified aesthetic and technical requirements for the gallery space. The contractor must coordinate all aspects of the project including material procurement, quality assurance, delivery logistics, and on-site installation. The work requires adherence to Navy facility standards and coordination with government representatives throughout the project lifecycle. All deliverables must be completed in accordance with the technical specifications and schedule outlined in the solicitation documents, with the contractor responsible for ensuring all materials, labor, and equipment necessary for project completion are included in the proposal pricing.

View the file

Other files

File Type Posted
4.02 N00244-26-Q-0060 Combined Synopsis.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Naval Base Point Loma Harbor Drive Annex 3244 Echo Lane Bldg 66 San Diego, CA 92147 Project Title: Mixed Media Art Installation

1.0 Objective

The purpose of this Statement of Work is to define the requirements for the fabrication, delivery, and installation of custom mixed media art displays and murals at the HDA CZ Hall Galley located in Point Loma.

2.0 Scope of Work

The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, and supervision necessary to fulfill the requirements of the art installations as specified in this document. The work includes the creation of mixed media art with integrated photography, artist relief elements, and proper mounting/application to designated glass and drywall surfaces.

3.0 Deliverables and Specifications

The contractor shall deliver and install the following specific items:

Item No.
Location / Description
Material & Method
Dimensions
Qty
0001
Glass Panels - StandardMixed Media Art Installation with Integrated Photography
CMYK 3M applied to Glass
Cut to Size:24.5" W x 67" H
20
0002
Glass Panels - Artist ReliefMixed Media Art Installation with Hand Done Artist Relief and High Definition Photography Integration
CMYK 70/30 with Lamination on Glass
Cut to Size:21" W x 19.25" H
20
0003
Dining 1 Wall MuralMixed Media Art Installation with Hand Done Art Relief on Dry Wall
CMYK 3M
Cut to Size:16'5" W x 7'8" H
1
0004
Galley 1 (Bake Shop) MuralMixed Media Art Installation with Hand Done Art Relief on Dry Wall
CMYK 3M
Cut to Size:8'8" W x 7'6" H
1
0005
Galley 2 (Back Door Entrance) MuralMixed Media Art Installation with Hand Done Art Relief on Dry Wall
CMYK 3M
Cut to Size:13'6" W x 7'11" H
1

4.0 Additional Requirements

a. The contractor shall provide consultation services to gain an understanding of specific visual references to incorporate into the mural work that are expressive of the location, culture, interest, or desired aesthetic of the client.

b. The contractor shall use a professional visual artist, design a mixed-media mural wall(s) that incorporates custom, commercial-grade wallpaper or high tach commercial grade vinyl, hand painted accents, high definition photography integration, LED lighting, wood, floating walls to create a 3 dimensional effect, and any other materials needed to enhance the overall look and feel of the space. (Consideration to the use of props, such as hanging décor, should be included and provided to further established the desired look and feel of the space.) The design should be artistic in nature and employ the use of stylization, fonts, negative and positive space, color, and texture to create a final look.

c. The contractor shall provide a visual artist’s draft using photo specific references of the space to show the full layout of elements, colors, textures, lighting, etc.

d. The contractor shall asses and prepare all affected areas to ensure proper installation of mixed media mural wall(s). Preparation may include but not be limited to, removal of molding, preexisting fixtures, repairing of holes or uneven textures, application of necessary primer, etc.

e. The contractor shall fabricate floating walls that create a three dimensional effect and layered aesthetic while simultaneously integrating walls into an overall cohesive design.

f. The contractor shall install LED lighting (backlighting) integrated into floating walls that create visual interest and align with the overall look and feel of the space. The contractor shall ensure the proper wiring and wire management of all electronic elements.

g. The contractor shall fabricate and install all visual aspects of mixed-media walls, including but not limited to, custom wallpaper or vinyl, hand-done painting, wood accents, veneers, stains or other specialty finishes. The contractor shall ensure the full design extends throughout floating walls while maintaining one cohesive look.

5.0 Contractor Responsibilities

a. Contractor is responsible for verifying all dimensions prior to bidding and installation.

b. The contractor will provide personnel who are certified to perform required tasks.

c. Contractor will be permitted to work inside of the Dining Facility during the following hours: Monday through Friday - 0730-1700 except during meal hours and holidays.

Meal Hours (No work permitted): Coordinate with the Installation FSO | Meal | Time | | Breakfast | 0600 - 0730 | | Lunch | 1100 - 1230 | | Dinner | 1600 - 1730 | Night or weekend shift may be coordinated with Food Service Officer with no additional cost in pricing. Night shift is preferred if project involves loud noise and heavy dust to not interfere with patrons during meal hours and must be coordinated with the FSO. Exact days of work will be coordinated before commencement to ensure space availability. Coordinate with LCPO /FSO before commencing work to ensure serving line or each section is secured for work while utilizing different serving lines to serve the patrons. Immediate work area will be properly secured by the contractor and will not conflict with meals being served or dining area being utilized.

d. Contractor will provide plastic barriers to contain dust or paint.

e. Contractor is responsible for daily clean up and disposal of all generated debris/materials to proper disposal or recycle containers at the back dock.

f. Contractor is responsible to obtain necessary security pass for base access. The government will not provide escorts to and from the gate.

6.0 Period and Place of Performance & Contacts

Category
Details
Period of Performance
01 September 2026 to 31 August 2027 2027
Place of Performance
Naval Base Point Loma Harbor Drive Annex, Building 55, 3244 Echo Lane, San Diego, CA 92147.
Primary POC
CW03 Martell Pierce, Cell: 310-977-0842; e-mail: martell.l.pierce.mil@us.navy.mil
Alternate POC
CSC Simpkins Donald Telephone: (360) 475-4705; e-mail: donald.e.simpkins.mil@us.navy.mil

WAWF Information and routing Data Table

Field Name in WAWF
Data to be entered in WAWF
Pay Official DoDACC
N50082
Issue By DoDACC
N00244
Admin DoDACC
N00244
Inspect By DoDACC
N63406
LPO DoDACC
N00052
Acceptor DoDACC
N00242
Acceptor E-mail address
raymond.rodriguez18.civ @us.navy.mil;

CNRSW_INVOICING@us.navy.mil

File details come from the government source that posted it. Updated .