This is a conceptual construction phasing document for the State of Michigan's Michigan School for the Deaf (MSD) Residence Hall project. The document outlines a multi-phase construction strategy for developing a new residence hall and apartments on the MSD campus. The project encompasses hazardous material abatement, demolition of existing structures (Gilbert Hall and a portion of Stevens Hall), utility relocation, new construction, and site improvements including landscaping. The phasing schedule begins in July 2025 with relocation of play areas and hazardous material abatement, progresses through December 2025 with the razing of Gilbert Hall and initial sitework, and continues with residence hall and apartment construction from December 2025 through February 2027. Furniture installation and occupancy are scheduled for March 2027 through July 2027, with final demolition and exterior repairs to Stevens Hall occurring from June 2027 through September 2027.

The document provides a conceptual framework for the project's sequencing and site logistics, including building massing overlays, existing site plans, and conceptual renderings of the new residence hall entries and wings. No specific pricing, budget allocation, or contract award information is included in this phasing document. This appears to be a planning and design phase document intended to communicate the overall construction sequence and timeline to stakeholders and potential bidders for the dormitory construction project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

April 5, 2023

State of Michigan | Michigan School for the Deaf (MSD) – Residence Hall

SITE

BUILDING

tray Text Box Conceptual Construction Phasing Approach

MSD – Residence Hall | Existing Site Plan tray

Conceptual Building Massing and Site Location tray

Conceptual Building Massing and Site Location

MSD – Residence Hall | Project Phasing Strategy

Buildings to be affected

Conceptual Residence

Hall Overlay

MSD – Residence Hall | Project Schedule

July 2025

Relocate Play

Areas

Hazardous

Material

Abatement

December 2025

Raze Gilbert Hall

Relocate Utilities

Initial grading and sitework

December 2025 Thru

February 2027

Construct

Residence Hall and Apartments

March 2027 thru July 2027

Furniture and

Move-in

June 2027 thru

August 2027

Raze portion of

Stevens Hall

August 2027 thru

September 2027

Stevens Hall

Exterior Repairs

Site Landscaping and Plantings

MSD – Residence Hall | New Buildings tray

Conceptual Building Entry and Residence Wings

File details come from the government source that posted it. Updated .