02. Attachment 3 - Price Response.docx

DOCX document 27 KB Posted

Attached to
Report on Economic Impact of a 1-in-100 Year Hurricane
Solicitation number
RFP-11453
Issued by
Leon County, Florida

About this file

This is a Price Response attachment from the Florida Department of Financial Services for RFP 2425-09 COS regarding a report on the economic impact of a 1-in-100 year hurricane. The document outlines the pricing structure for two required deliverables: a Draft Report (Deliverable 1) and a Final Report (Deliverable 2).

The pricing document includes two tables. Table 1 requires respondents to provide mandatory pricing for the Draft and Final Reports, with a total projected price to be used in the price point evaluation. Table 2 is optional and requests pricing for two additional elements: an estimate of the impact of a 1-in-100 year hurricane on State-owned buildings and recommendations for reducing the economic impact from such a hurricane. The pricing for Table 2 will not be considered in the respondent's price point evaluation.

View the file

Other files

File Type Posted
2425-09 RFP COS - Addendum 1.pdf PDF
04- Appendix C- Questions Template.xlsx XLSX spreadsheet
05. Appendix E- Award Preferences Form.docx DOCX document
02. Attachment 3 - Price Response.docx DOCX document
03. Attachment 6, Certification Form.docx DOCX document
01- 2425-09 RFP COS - Complete.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF FINANCIAL SERVICES

ATTACHMENT 3

PRICE RESPONSE

2425-09 RFP COS

Instructions:

1. Table 1, Deliverable Pricing: Include a per deliverable price for each deliverable listed. The Respondent’s price points will be calculated using the “Total Projected Price.”

2. Table 2, Optional Additions to Report: Provide the estimated cost for each optional element. Respondents are not required to complete Table 2, and pricing for Table 2 will not be considered in the Respondent’s price point evaluation.

TABLE 1

DELIVERABLE PRICING

Deliverable
Proposed Price
Deliverable 1: Draft Report
$
Deliverable 2: Final Report
$
TOTAL PROJECTED PRICE
$

TABLE 2

OPTIONAL ADDITIONS TO REPORT

Additional Element
Proposed Price

Estimate of the impact of a 1-in-100 year hurricane on State-owned buildings

Recommendations for reducing the economic impact from a 1-in-100 year hurricane

TOTAL PROJECTED PRICE FOR ADDITIONAL ELEMENTS
$

Attachment 3

File details come from the government source that posted it. Updated .