01b. Attachment A- Hollywood AMD as built DWGS Reactor Tank Manway Access.pdf
PDF 16 MB Posted
- Attached to
- Hollywood Reactor Tank Maintenance
- Solicitation number
- 6100066151
- Issued by
- Clearfield County, Pennsylvania
About this file
This file is a technical attachment consisting of as-built drawings and construction documentation for the Hollywood Treatment Plant's reactor tank system in Pennsylvania. The document set includes detailed engineering drawings for the Hollywood Reaction Tanks (identified as S303 and S309), construction drawings with amendments (AMD 17(1416)102.1), and specifications for manway access to the reaction tank. The drawings appear to be marked with reviewer highlights by Robert Knieriem and serve as reference documentation for the related contract opportunity involving reactor tank maintenance and sludge deposit removal and disposal at the Hollywood Treatment Plant.
The file primarily contains technical reference materials rather than contract specifications or solicitation details. These as-built drawings and construction documents establish the baseline physical specifications and configurations of the reactor tank infrastructure and would serve as essential reference materials for contractors bidding on or performing the reactor tank maintenance work. The documentation focuses on the structural and access specifications of the tanks, including manway configurations, which are critical for planning maintenance operations, sludge removal procedures, and waste disposal activities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
Robert Knieriem Highlight
| 2 - Attachment B - HW RT AS-BUILT Drawings C201 301 & S303 309 |
| Constr Drawings AMD 17(1416)102.1_ 10 |
| Constr Drawings AMD 17(1416)102.1_ 12 |
| 2 - Attachment B - Hollywood Reaction Tanks Constr AS-BUILT Drawings - S303309 |
| Hollywood Reaction Tanks Constr AS-BUILT Drawings AMD 17(1416) - S303 |
| Hollywood Reaction Tanks Constr AS-BUILT Drawings AMD 17(1416) - S309 |
3 - Manway Access to Reaction Tank
File details come from the government source that posted it. Updated .