This document is a Categorical Exclusion Determination for a proposed action by the Western Area Power Administration's Rocky Mountain Region to conduct routine herbicide application for vegetation management at communication sites and facilities in Colorado, New Mexico, Utah, Wyoming, and surrounding areas. The proposed action fits within B1.3 Routine Maintenance, which is a listed class of actions categorically excluded from further NEPA review. The proposed action would involve applying herbicide by backpack or vehicle-mounted sprayer within WAPA property boundaries and rights-of-way managed by BLM, BOR, Navajo Nation, Colorado State, and US Forest Service. Treatment areas would be accessed using existing routes, and no new road construction or maintenance is authorized. The determination includes various stipulations for applicators to meet licensing requirements and follow regulations and guidelines for application methods and protected species.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 019-Amendment 00001 Extension.pdf | ||
| 019-Attachment-A-Performance-Work-Statement.pdf | ||
| 019-Attachment-B-Wage-Determinations.pdf | ||
| 019-Attachment-E-Foreign-National-Data-Card.pdf | ||
| 019-Sol_89503223QWA000534.pdf | ||
| 019-Attachment-D-IPP-Payment-Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C
Categorical Exclusion Determination
89503223QWA000534
CATEGORICAL EXCLUSION DETERMINATION
Western Area
Power Administration
Rocky Mountain Region
Proposed Action Title: Western Colorado Maintenance Office Communication Site and Facility
Herbicide Treatments
Location: Chaffee, Custer, Dolores, El Paso, Fremont, Garfield, Grand, Gunnison, Jackson, La Plata, Lake, Moffat, Montezuma, Montrose, Rio Blanco, Routt, San Miguel, and
Summit Counties, Colorado; San Juan County, New Mexico; Daggett and Uintah
Counties, Utah; Lincoln and Sweetwater Counties, Wyoming
Project Number: 2021-087
Expiration Date: December 31, 2023
A. PROPOSED ACTION DESCRIPTION:
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine herbicide application for vegetation management in the spring and fall, as necessary, at the communication sites and facilities listed below. Herbicide will be applied by backpack sprayer or custom vehicle-mounted sprayer. All weeds will be treated within WAPA’s property boundaries and rights-of-way (ROWs) on lands managed by the Bureau of Land
Management (BLM), Bureau of Reclamation (BOR), Navajo Nation (NAV), State of Colorado
(CO), and US Forest Service (USFS). Treatment areas will be accessed using existing access routes; no road maintenance or new road construction is authorized.
Facility Name Facility Type FID County State
Land
Management
Agency
Animas River Substation ANM La Plata Colorado N/A
Bears Ears Substation BEA Moffat Colorado CO
Big Mesa Communication
Site
BMS Gunnison Colorado BLM
Blue Mesa Switchyard BM Gunnison Colorado BLM
Blue Ridge Communication
Site
BLR Grand Colorado USFS
Brush Creek Tap Substation BCK Uintah Utah BLM
Cahone Pumping Plant CNE Dolores Colorado BOR
Canon West Substation CCW Fremont Colorado N/A
Cathedral Bluff Communication
Site
CAB Rio Blanco Colorado BLM
Cedar Mountain Communication
Site
CMT Moffat Colorado BLM
Cliff Ridge Communication
Site
CLI Uintah Utah BLM
Cow Point Communication
Site
CWP Montezuma Colorado BLM
CATEGORICAL EXCLUSION DETERMINATION - Project Number: 2021-087
Craig
Maintenance
Facility
Service Center CRM Moffat Colorado N/A
Curecanti Substation CCI Montrose Colorado N/A
Deer Peak Communication
Site
DPK Custer Colorado USFS
Dove Creek Pumping Plant DOV Dolores Colorado BOR
Fairview Pumping Plant FRV Montezuma Colorado BOR
Flaming Gorge Switchyard FGE Daggett Utah USFS
Flaming Gorge Communication
Site
FGC Daggett Utah USFS
Fontenelle Camp Communication
Site
FNP Lincoln Wyoming BOR
Fontenelle Switchyard FON Lincoln Wyoming BOR
Four Corners Communication
Site
FCM San Juan New Mexico NAV
Granby Pumping
Plant
Switchyard GPP Grand Colorado BOR
Granby Substation GRB Grand Colorado BLM
Great Cut Pumping Plant GCT Montezuma Colorado BOR
Green Mountain Communication
Site
GMM Summit Colorado USFS
Green Mountain Switchyard GM Summit Colorado BOR
Green River Communication
Site
GNR Sweetwater Wyoming BLM
Grizzly Ridge Communication
Site
GRZ Uintah Utah USFS
Hayden Communication
Site, Pole Yard, and Substation
HDN Routt Colorado N/A
Kremmling Substation KRM Grand Colorado BLM
Midway Substation MID El Paso Colorado N/A
Monarch Communication
Site
MNK Chaffee Colorado USFS
Moncisco Communication
Site
MCO San Juan New Mexico NAV
Montrose Substation MTR Montrose Colorado N/A
Mount Elbert Substation MTE Lake Colorado BOR
North Park Substation NOP Jackson Colorado N/A
Oak Creek Tap OCR Routt Colorado N/A
Pinion Hill Communication
Site
PNN Chaffee Colorado N/A
Pleasant View Pumping Plant PTV Montezuma Colorado BOR
Poncha Switchyard PON Chaffee Colorado N/A
Raspberry Creek Communication
Site
RBC Montrose Colorado USFS
Rifle Communication
Site
RFM Garfield Colorado N/A
Rifle Substation RFL Garfield Colorado N/A
Ruin Canyon Pumping Plant RUC Montezuma Colorado BOR
Salida Substation SLA Chaffee Colorado N/A
Sandrock Communication
Site
SDR San Miguel Colorado BLM
Sheeps Knob Communication
Site
SHK Montrose Colorado BLM
Shiprock Substation SHR San Juan New Mexico BLM
Silt Pumping Plant SLT Garfield Colorado BOR
Skito Metering Station SKO Gunnison Colorado N/A
Sunlight Peak Communication
Site
SUN Garfield Colorado BLM
Table Mountain Communication
Site
TBM Grand Colorado USFS
Towaoc Power Plant TOA Montezuma Colorado BOR
Tyzack Substation TYZ Uintah Utah BOR
Vernal Communication
Site and
Substation
VNL Uintah Utah N/A
Waterflow Substation WTF San Juan New Mexico BLM
Willow Creek Switchyard WCR Grand Colorado N/A
B. STIPULATIONS PERTAINING TO PROPOSAL:
1) If the scope of work of this project changes, RMR’s Environment Department must be contacted to determine whether additional environmental review is required.
2) This Categorical Exclusion expires on December 31, 2023. If all project work has not been completed by the expiration date, or if the need for an environmental compliance extension is anticipated, RMR’s Environment Department must be contacted for an updated environmental review.
3) Pesticide and herbicide applicators must meet all state licensing requirements and must follow all applicable federal, state, and local laws, regulations, and guidelines. Applicators must use only EPA-registered pesticides and herbicides that are approved for the intended use and location and must follow all applicable label directions.
4) To prevent the transport of non-native and invasive plants and animals, including noxious weeds and aquatic nuisance species, work crews must pressure wash vehicle undercarriages when refilling water tanks between herbicide treatments.
5) Any injured or orphaned birds and all observed active nests must be immediately reported to
RMR Environment at (970) 593-8803 or (970) 342-6462. Any dead birds must be reported to
RMR Environment within twenty-four (24) hours of discovery. Additional documentation, such as photographs and GPS coordinates, may be requested to support RMR’s reporting requirements to the U.S. Fish and Wildlife Service.
6) If any cultural resources are inadvertently discovered during implementation of the proposed action, work within 100 feet of the discovery area must halt immediately, and an RMR
Archaeologist must be contacted immediately at (970) 302-4753 or (970) 286-3523. Work in the area of discovery must not resume until notification to proceed is provided by an RMR
Archaeologist.
7) If any possible human remains are inadvertently discovered during implementation of the proposed action, work within 100 feet of the discovery area must halt immediately, and an
RMR Archaeologist must be notified immediately at (970) 302-4753 or (970) 286-3523
(no later than 24 hours from the time of discovery). A reasonable effort must be made to protect the remains from looting and/or further damage. Work in the area of discovery must not resume until notification to proceed is provided by an RMR Archaeologist.
8) Activities involving the use of fuel, oil, hydraulic fluid, or other petroleum products must comply with RMR’s Spill Response Plan (SRP).
C. NUMBER AND TITLE OF THE CATEGORICAL EXCLUSION BEING APPLIED:
(See text in 10 CFR 1021, Subpart D.)
B1.3 Routine maintenance
D. REGULATORY REQUIREMENTS 10 CFR 1021.410 (b): (See full text in regulation)
The proposed action fits within a class of actions that is listed in Appendix A or B of 10 CFR
1021.
To fit within the classes of actions listed in Appendix B, a proposal must be one that would not:
(1) threaten a violation of applicable statutory, regulatory, or permit requirements for environment, safety, and health, or similar requirements of the Department of Energy (DOE) or Executive Orders;
(2) require siting and construction or major expansion of waste storage, disposal, recovery, or treatment facilities (including incinerators), but the proposal may include categorically excluded waste storage, disposal, recovery, or treatment actions or facilities; (3) disturb hazardous substances;
pollutants; contaminants; or Comprehensive Environmental Response, Compensation, and Liability
Act (CERCLA)-excluded petroleum and natural gas products that preexist in the environment such that there would be uncontrolled or unpermitted releases; (4) have the potential to cause significant impacts on environmentally sensitive resources, including, but not limited to, those listed in paragraph B(4) of 10 CFR 1021, Subpart D, Appendix B; (5) involve genetically engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed activity would be contained or confined in a manner designed and operated to prevent unauthorized release into the environment and conducted in accordance with applicable requirements, such as those of the Department of Agriculture, the Environmental Protection Agency, and the National Institutes of Health.
There are no extraordinary circumstances related to the proposal that may affect the significance of the environmental effects of the proposal.
The proposal has not been improperly segmented, and the proposal is not connected to other actions with potentially significant impacts, is not related to other proposed actions with cumulatively significant impacts, and is not precluded by 40 CFR 1506.1 or 10 CFR 1021.211.
E. DETERMINATION:
Based on my review of information conveyed to me and in my possession (or attached) concerning the proposed action, as NEPA Compliance Officer (as authorized under DOE Order 451.1B), I have determined that the proposed action fits within the specified class(es) of action, the other regulatory requirements set forth above are met, and the proposed action is hereby categorically excluded from further NEPA review.
Signature and Date
James Wood
NEPA Compliance Officer
Rocky Mountain Region
Western Area Power Administration
Prepared by:
Andrea Severson, Natural Resource Specialist
William Ankele, Archaeologist
File details come from the government source that posted it. Updated .