019-Attachment-A-Performance-Work-Statement.pdf

PDF 417 KB Posted

Attached to
WCMO Bare Ground Weed/Vegetation Control Federal contract opportunity
Solicitation number
89503223QWA000534
Issued by
Department of Energy Western Area Power Administration

About this file

This document is a Performance Work Statement for bare ground vegetation control services at various Western Area Power Administration sites. The contractor will be required to control undesirable vegetation from 129.14 acres across 62 substations, communication sites, and other facilities located in Colorado, Wyoming, Utah, Nebraska, New Mexico, and Montana. Services include spring herbicide applications to provide year-round vegetation control. The contractor must be licensed for pesticide application in the relevant states and have experience in weed control near high voltage substations. The contractor will submit various plans and reports, obtain required permits, and adhere to environmental and safety regulations when performing the services. Payment will be made based on actual acreage treated after inspection and approval by the contracting officer's representative. The contractor guarantees the areas will remain weed free for one growing season following application.

View the file

Other files for this federal contract opportunity

Other files attached to WCMO Bare Ground Weed/Vegetation Control, newest first.
File Type Posted
019-Amendment 00001 Extension.pdf PDF
019-Sol_89503223QWA000534.pdf PDF
019-Attachment-D-IPP-Payment-Requirements.pdf PDF
019-Attachment-C-2021-087-WCMO-CX.pdf PDF
019-Attachment-B-Wage-Determinations.pdf PDF
019-Attachment-E-Foreign-National-Data-Card.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A

Performance Work Statement

89503223PWA000534

U.S. DEPARTMENT OF ENERGY

WESTERN AREA POWER ADMINISTRATION

PERFORMANCE WORK STATEMENT BARE

GROUND VEGETATION CONTROL SERVICES

1. GENERAL

1.1. SCOPE OF WORK

The Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), requires a contractor to perform Bare Ground vegetation control. The required services, as described further in this Performance Work Statement (PWS) include but are not limited to the following: Prevention and removal of all undesirable vegetation (Bare Ground control) from substation, microwave, and other facility sites on Western Area Power Administration (WAPA) Vegetation control with spring applications that will result in complete year-round vegetation control. WAPA, RMR and the Government are used interchangeably in this document, and all have the same meaning.

1.2. Background

WAPA, part of the U.S. Department of Energy (DOE), is a Federal power marketing administration that markets and delivers reliable, cost-based hydroelectric power and related services within a 15-state region.

The RMR serves preference customers in Colorado, Wyoming, Nebraska and Kansas. RMR also services the Colorado River Storage Project Management Center (CRSP-MC) in Salt Lake City, Utah. The CRSP-MC provides transmission services to facilities in Arizona, New Mexico, Colorado, Utah, Texas and Wyoming.

RMR’s mission includes maintenance and operation of the high-voltage transmission system including 80 substations and over 5,400 miles of high-voltage power transmission lines that deliver power from CRSP-MC and over 19 power plants to its wholesale customers.

1.3. Location

Substations, microwaves, and other facilities throughout WAPA Area Power Administration (WAPA) RMR.

See Exhibit 3

1.4. Government Personnel

1.4.1. The Contracting Officer (CO) is the individual executing this contract on behalf of the Government and is responsible for the overall administration of the contract. He/she is the only person authorized to make any changes in the prices, terms or other conditions of the contract.

1.4.2. The Contracting Officer’s Representative (COR) is responsible for giving the Contractor any special technical instructions or guidance necessary to ensure contract execution. The COR has no authority to alter the terms of conditions of the contract.

1.5. Contractor Personnel

1.5.1. The Contractor shall furnish adequate supervision at the premises to ensure that work is performed in a satisfactory manner. It is the responsibility of the Contractor to maintain close surveillance over personnel employed to perform work on the contract. The actions of the Contractor employees, agents, and subcontractors shall be properly managed at all times on WAPA property.

1.5.2. The Contractor shall have a competent on-site representative authorized to act on behalf of the contractor, available to the CO or COR to receive instructions or information regarding work under the contract. The on-site representative shall be able to fluently speak and understand English.

The contractor representative will be required to have a copy of the contract in their possession at all times for referral concerning questions of Contractor responsibility. Theon-site representative shall provide a phone number where he/she can be contacted Monday thru Friday during normal hours and in emergencies.

1.5.3. The Government reserves the right to restrict the employment of any Contractor employee, or prospective contractor employee who is identified as a potential threat to the health, safety, security, or general well-being of Government or Contractor personnel and the operation of the Western Colorado Maintenance facilities upon which work is being performed. The Government shall also restrict employment of any Contractor or prospective Contractor employee for which adequate evidence of training or any required certification/license has not been provided to the Government.

1.6. Hours of Work

Western Colorado Maintenance Office (WCMO), Montrose, Colorado, regular business hours are from 7:30 a.m. to 4:00 p.m. daily, Monday through Friday, except for Federal holidays. Normal work hours for RMR’s Maintenance personnel are from 7:00 a.m. to 5:30 p.m. daily, Monday through Thursday. Differing from this schedule may be authorized on a case-by-case basis with the COR’s and CO’s prior approval.

1.7. Submittals

1.7.1. Safety Plan. A Safety Plan is required to be submitted to the CO and COR no later than 10 calendar days after contract award. WAPA’s approval of the plan is required prior to the commencement of work.

1.7.2. List of Employees. Contractor shall furnish names of all personnel performing work on this contract no later than 10 calendar days after contract award. List of employees shall be submitted to the CO and COR no later than 10 calendar days after contract award. No unidentified or unauthorized personnel shall be allowed or permitted on the work site.

1.7.3. Work Schedule. Contract shall submit a proposed work schedule to the CO and COR no later than

10 calendar days after contract award. WAPA’s approval of the work schedule is required prior to the commencement of work.

1.7.4. Herbicide Application Plan. At least 10 calendar days prior to the date of intended application submit the herbicide application plan. The plan shall specify the following:

A) One copy of herbicide applicator’s certifications/licenses for all States in which herbicides will be applied as well as appropriate insurance paperwork.

B) Where the herbicide is to be applied.

C) Planned date of application.

D) Herbicide products to be applied and planned application rates (pounds of active ingredients per acre or quantity of product per acre). Spray marking dye name and manufacturer.

E) Method of application (equipment to be used to apply herbicide).

F) Herbicide manufacturer’s product specimen label and any supplemental product labels (include directions for use of material, use precautions, and storage and disposal.

G) Material Safety Data Sheets (MSDS).

1.7.5. Final Report. Within 7 calendar days after each application, submit two copies to the CO/COR a written report which provides the record keeping information required by Federal and State regulations. The report shall include the following:

A) A synopsis of the services provided.

B) Date of application.

C) Place (facility) and size of area (square feet or acreage) treated.

D) Name and manufacturer of herbicide applied, together with the EPA pesticide registration number and product lot number from the labels. Include name and manufacture of spray marking dye.

E) Method of application (equipment used, carrier).

F) Weather conditions at time of application (wind speed, wind direction, temperature, rainfall, and humidity).

G) Quantity/rate of herbicide applied in pounds of active ingredient per acre or quantity of product per acre.

H) Problems that occurred such as any health effects and noncompliance with environmental and health/safety laws or regulations.

I) Other information/data as required by applicable Federal, State, and local regulations.

1.7.6. Spill Prevention Measures, Notification and Cleanup Plan (Plan) Submit the Plan to the CO and COR for approval 10 days prior to start of work. Approval of the plan is for the purpose of determining compliance with the specifications only and shall not relieve the Contractor of the responsibility for compliance with all Federal, State, and local regulations. Provide a Spill Prevention Notification and Cleanup Plan which includes the following:

A) Spill prevention measures- Describe the work practices or precautions that will be used at the job site to prevent spills. These may include storage of regulated substances in spill proof containers and management techniques such as requiring workers to handle material in certain ways.

B) Notification- Most States and the U.S. Environmental Protection Agency require by regulation that anyone who spills certain types of pollutants in certain quantities notify them of the spill within a specific time period. Some of these agencies require written follow up reports and cleanup reports. Include in the Plan, the types of spills for which notification would be made, the agencies notified, the information the agency requires during the notification, and the telephone numbers for notification.

C) Employee Awareness Training- Written employee awareness training procedures shall be implemented to ensure personnel are knowledgeable about the contents of the Plan and the need for notification.

D) Commitment of Manpower, Equipment and Material- Identify the arrangements made to respond to spills, including the commitment of manpower, equipment and material.

1.8. Pre-Performance Meeting

The CO will schedule a meeting with the Contractor within 1 week following the contract award to discuss the requirements of the contract, to include safety prior to start of work.

1.9. Quality Control and Quality Assurance

1.9.1. The Contractor is responsible for quality control and shall utilize its own internal quality control processes in the performance of this contract. The Contractor shall develop and maintain a Quality Control Plan (QCP) to ensure all services are performed in accordance with the Government’s performance standards outlined in the Performance Requirements Summary (PRS) section of this

PWS.

1.9.2. Performance Standards. See Exhibit 1. The PRS is a listing of significant performance objectives with associated performance standards that will be monitored and inspected by Government personnel. Each performance objective represents a critical function as identified by the Government at the time of contract award. The performance standard represents the minimum acceptable level of Contractor performance. The performance objectives and standards represent only the critical components of this Contract, and do not excuse the Contractor from performance of other responsibilities identified in the PWS. All services described in this PWS are subject to inspection/surveillance by the Government.

1.9.3. Government Surveillance of Contractor Performance. In order to supplement the Contractor’s QCP, WAPA personnel will verify Contractor compliance with essential performance requirements. The Government may use various methods to perform surveillance of Contractor performance, including customer input, random sampling, periodic inspection, Contractor reporting, etc. The standard is that the areas treated for Bare Ground control under the contract remain weed free for one (1) growing season following application. Any defect (weed re-growth) brought to the Contractor’s attention by the Government must be corrected by re-performance 14 calendar days after notification by the Government. The COR may approve additional time to correct the defect as the COR deems appropriate. If recurring defects occur in a growing season, or the Contractor fails to correct a defect in the required time, the recurring defects or failure to perform in a timely manner will be reported to the Contracting Officer for appropriate action.

1.9.4. Contract Discrepancy Report (CDR). A CDR (PWS Exhibit 2) will be initiated by the CO or COR if, at any time during the performance, the results of WAPA’s surveillance show the number of observations of unacceptable performance during the period exceeds the threshold specified in the PRS, and the CO/COR determines that the unacceptable performance was not caused by the Government. Instructions for completing the CDR are as follows:

1.9.4.1. The COR completes Blocks 1 through 6 and sends the form to the CO. Block 6 must include the PRS number corresponding to the discrepancy, the threshold of that PRS item,the number of discrepancies documented, and the PWS paragraph reference describing the Government’s expectations for that PRS item.

1.9.4.2. The CO evaluates the CDR, and if appropriate, signs it and sends it to the Contractor with a cover letter requesting a response within a specified number of days.

1.9.4.3. The Contractor must complete Blocks 7 through 10 and return the CDR to the COwithin the specified time period on the cover letter.

1.9.4.4. Upon receipt of the Contractor’s response, the CO, in consultation with the COR, will evaluate the Contractor’s response and take appropriate action. The CO will document the evaluation in Block 11 and action taken in Block 12.

1.9.4.5. In most cases, the preferred action is re-performance by the Contractor at no additional cost to the Government. If deduction from payment is the appropriate action, the COR and CO will calculate the payment deduction based on the performance period in which the discrepancy occurred. The deduction is taken from the Contractor’s payment as close as possible to the month in which the discrepancy occurred, but not necessarily the same month. The Government should not withhold payment of an invoice while calculating the deduction.

1.9.4.6. The COR will complete Blocks 13a and 13b. The CO signs the CDR in Block 13c. These signatures indicate concurrence with the actions taken.

1.9.4.7. In the event the CO determines that issuance of a CDR is not appropriate; the COshall document the contract file indicating why such action is not appropriate.

1.10. Compliance with Regulations

In performing the work required by this Contract, the Contractor shall comply with all applicable Federal, State and local laws and regulations.

1.11. Licenses and Permits

The Contractor shall obtain and maintain, at its sole expense, all necessary licenses and permits required in the States in which the applications are applied to meet the requirements of the contract.

1.12. Materials, Equipment and Storage

1.12.1. The Contractor shall furnish all materials and supplies required for the performance of work under this contract.

1.12.2. The Contractor shall determine and furnish all equipment required for the performance of the work under this contract. All equipment shall comply with applicable OSHA guidelines, and shall be in good operating condition. The Contractor shall operate the equipment in accordance with the original manufacturer’s recommendation and applicable laws and regulations

1.12.3. Equipment, Materials, and supplies may be temporarily stored at some sites at the sole discretion of the CO/COR, inspector or WAPA’s representative and only for the completion of work being performed at that site. WAPA will not be held liable for any loss, damage or theft of Contractor’s equipment, materials, or supplies. Further, it will be the Contractor’s sole responsibility for completing all paperwork and reporting any spills to proper authorities. Contractor will be financially liable for all damage, clean-up, and repairs to WAPA’s property or neighboring property should any contamination occur for any reason.

1.13. Interference with Business

The Government may undertake or award other contracts for additional work, and the Contractor shall fully cooperate with such other contractors and Government employees and carefully schedule its own work to such additional work as may be directed by the COR. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by Government employees.

The services under this contract shall be performed in such a way that there will be no interruption to or interference with the normal operation of Government business on the premises. Persons employed by the Contractor shall, while on the premises, comply with all applicable regulations.

1.14. Government Furnished Property, Equipment, Materials and Utilities

1.14.1. The Government will not furnish any property, equipment or materials for use under this contract.

1.14.2. The Government will provide electrical power at sites with existing power outlets for the operation of equipment as necessary to perform services. Contractor shall furnish and provide power for those sites without electrical power.

1.14.3. The Government will provide water at sites where it is available from an existing outdoor source.

Contractor shall furnish and provide water for those sites without existing water.

1.14.4. Sanitation facilities are available at some sites.

1.15. Security of Facilities

Security of Government facilities is a shared responsibility of all employees, both Federal and contractor.

1.15.1. Contractor personnel shall be alert to surroundings and notify the CO, COR, RMR Safety/Security Office, or on-duty contractor security staff after hours of suspicious activity, including unescorted persons who do not have a visitor’s badge, or known or suspected unauthorized removal of Government property from the facility.

1.15.2. Contractor personnel shall notify the CO, COR and RMR Safety/Security Office, or on-duty contractor security staff after hours, if they have any security issues or concerns.

1.15.3. Contractor personnel shall protect identification badges and card keys and notify the RMR Security Manager within 24 hours if card keys or badges are lost. Badges and card keys shall be returned to the RMR Security Manager when employment is terminated. (Reference clauses WES-H-1045 and

WES-H-1055.)

1.15.4. Contractor personnel shall not prop open doors, and when entering or leaving the complex shall ensure that doors and gates are secure. Contract staff shall notify the RMR Security Manager if they are unable to secure a door or gate.

1.15.5. Contractor personnel shall not allow any person to enter WAPA property without proper clearance from the RMR Security Office.

1.15.6. The Government may require immediate removal of the employee from the contract and the job site for conduct issues deemed by the Government to be serious (for example, violent behavior or comments, theft, misuse of Government equipment, unsafe work practices, fraudulent activity, etc.).

1.16. Safety

1.16.1. The Contractor, and all employees to be utilized under this contract, shall be required to take a safety orientation. This will require all contract personnel to take a tour of a WAPA substation with a WAPA representative. This tour will point out the hazards involved while working in an energized high-voltage substation, the WAPA rules and regulations governing this work, and entry procedures into WAPA’s substations. After these requirements have been satisfactorily completed, a list of the Contractor employees, who have been orientated to work in WAPA substations, will be established by WAPA. The Contractor and his employees must be on this orientation list before entering a WAPA substation, switchyard, or performing any work in said facilities. The Contractor will not allow any person on the job site who has not received the safety orientation and is not on the orientation list.

The WAPA COR may decline to orientate any Contractor employee and may remove any Contractor employee from the orientation list.

1.16.2. The Contractor shall comply with the latest effective standards promulgated by the Department of

Labor, Occupational Safety and Health Administration, Safety and Health Standards, 29 CFR 1910 and 29 CFR 1925, and shall comply with all applicable safety and health regulations and requirements, including DOE and WAPA requirements.

1.16.3. The Contractor shall take all reasonable precautions in the performance of the work under this contract to protect the safety and health of employees and members of the public and shall comply with all applicable safety and health regulations and requirements, including DOE and WAPA requirements.

1.16.4. The Contractor shall maintain an accurate record of, and shall immediately report to the COR and the CO, all cases of death, occupational disease, or traumatic injury to employees or the public, and any property damage as a result of performance under this contract.

1.16.5. The Contractor shall ensure that its employees are provided with personal protective equipment

(PPE) as necessary in accordance with established regulations and procedures. This equipment includes, but is not limited to, occupational foot protection, head protection (Hard Hats, non-metallic) and eye and face protection as required by OSHA Standards, 29 CFR 1910 and as required by WAPA safety standards and directives.

1.16.6. The Contractor shall ensure that its employees have been appropriately instructed and trained in the proper use of any equipment, vehicles, and/or personal protective equipment needed for the performance of their duties. The Contractor shall ensure that its employees comply with all applicable Federal, State, and/or local safety rules and regulations in the performance of their duties.

1.16.7. The Contractor shall report all near misses to the CO, COR within 24 hours of the occurrence. These near-miss reports, identifying the nature of the hazard and the corrective actions which have been implemented to prevent a reoccurrence in the future, may be generic, with no mention of individual employees involved in the incident. Near-miss reports are used as an information tool and are distributed regionally.

1.16.8. The Contractor is required to establish a Safety Plan/Program which includes, in addition to other requirements, a monthly safety meeting for all employees (with the exception of office staff).

The Contractor's Safety Plan shall be documented and available for the CO and COR to review at any time.

1.17. Environmental Requirements

1.17.1. The Contractor shall comply with all applicable Federal, State, and local environmental laws and regulations, and current WAPA policies and procedures.

1.17.2. The Contractor shall have the herbicide labels, MSDS, and the Spill Prevention Measures, Notification and Cleanup Plan on site during the time of herbicide transportation, mixing, loading, application, and container rinsing.

1.17.3. The Contractor shall dispose of or recycle hazardous, universal, and non-hazardous waste material in accordance with all applicable Federal, State and local laws, regulations and ordinances and current policies and procedures identified by WAPA. Remove all waste materials from the site. No waste shall be left on WAPA property, right-of-way, or easement. Burning or burying of waste material is not permitted. Wastes shall be reduced by recycling, reusing, or reprocessing to the maximum extent practicable.

1.17.4. Cleanup is to be done during the progress of work and upon completion. All empty herbicide containers must be disposed of by the Contractor in accordance with applicable regulations. No empty herbicide containers will be disposed of on WAPA property. The Contractor is responsible for removal from WAPA property all litter and/or garbage generated by the Contractor, their employees, or representatives.

1.17.5. Hazardous, Universal, and Non-Hazardous Wastes. The Contractor shall manage hazardous, universal, and non-hazardous wastes in accordance with all applicable State, Federal and Local regulations, and existing policies and procedures identified by WAPA.

1.17.6. Recyclable Material. The Contractor shall reduce wastes, including excess WAPA material, by recycling, reusing, or reprocessing. Examples of recycling, reusing, or reprocessing includes, but not limited to, reprocessing of solvents; recycling cardboard; and salvaging scrap metals.

1.17.7. Contractor’s Liability for Regulated Material Incidents. The Contractor is solely liable for all expenses related to spills, mishandling, or incidents of regulated material (such as, but not limited to petroleum products and pesticides) attributable to its employees’ actions or the actions of its subcontractors. This includes all response, investigation, cleanup, disposal, permitting, reporting, and requirements from applicable environmental regulation agencies.

1.17.8. The Contractor shall provide a “clean vehicle policy” while entering and leaving WAPA property and right-of-way areas to prevent transport of noxious weed plants and/or seed. The Contractor shall transport only authorized vehicles that are free of mud and vegetation debris to staging areas and the project right-of-way.

1.17.9. The Contractor shall use only EPA registered herbicides that are approved for the intended use.

1.17.10. The Contractor shall obtain and comply with all required Federal and State licenses and permits

(including the submittal of Pesticide Use Proposals [PUPs] for herbicide application on all Federal lands).

1.17.11. The Contractor shall submit all approved (signed) Pesticide Use Proposals (PUPs) to WAPA’s COR prior to application.

1.17.12. The Contractor shall administer and apply all pesticides/herbicides in accordance with categorical exclusions (CX) Determinations provided by the Government in Attachment E.

1.17.13. All employees utilized under this contract shall have experience requisite with the requirements of this contract. The Contractor will provide competent supervision and take necessary precautions to protect persons or property against injury or damage.

1.18. PWS Exhibits

The exhibits listed below are attached to and incorporated into this PWS.

Exhibit 1: Performance Requirements Summary (PRS). The purpose of the PRS is to communicate the Government’s quality expectations and the process to evaluate the Contractor’s performance.

Exhibit 2: Contract Discrepancy Report (CDR)

Exhibit 3: Locations where herbicide is to be applied.

2. Scope of Work

2.1. Qualifications:

2.1.1. Contractor Foreman/Project Manager/Project Superintendent (who will be onsite during all treatment services) shall possess at least five (5) years of experience in weed control application in and around high voltage substations.

2.1.2. Personnel shall be licensed to apply pesticides in Colorado, Nebraska, Wyoming, and Montana.

2.1.3. Contractor shall own or lease at least four trucks and/or trailers (4-wheel drive with extended/higher clearance) with water tanks/mixing capability.

2.2. Responsibility

2.2.1. The Contractor shall obtain all required Federal and State licenses and permits (including the submittal of Pesticide Use Proposals [PUPs] for herbicide application on all Federal lands).

2.2.2. The Contractor shall submit all approved (signed) Pesticide Use Proposals [PUPs] to WAPA’s COR prior to application.

2.2.3. The Contractor shall administer and apply all pesticides/herbicides in accordance with the Categorical Exclusion (CX) Determination provided by the Government in Attachment E.

2.2.4. All employees to be utilized under this contract shall have experience requisite with the requirements of this contract. The Contractor will provide competent supervision and take all necessary precautions to protect persons or property against injury or damage.

2.3. Herbicide Application

The Contractor shall comply with manufacturer's recommendations in accordance with applicable Regulations and as specified herein.

2.3.1. All herbicides used for Bare Ground shall be pre-approved by the CO/COR prior to application.

Drift control agents, where appropriate, shall be used per manufacturer's directions. Any deviations from the herbicide use list will require approval by the CO/COR prior to application

2.3.2. Daily contact with the COR or inspector will be made each morning for coordination of work.

2.3.3. A dye shall be added to all liquid herbicides or tank mixtures at a rate sufficient to ensure that the applications are visible to the Government’s inspector.

2.3.4. All herbicides will be mixed in the presence of the COR, inspector or WAPA representative.

Herbicide not mixed in the presence of the COR or inspector will not be applied on WAPA property.

2.3.5. A list of WAPA sites requiring Bare Ground control with acreage is listed in Exhibit 3. The

Contractor shall observe the WAPA boundaries and will confine all herbicide applications to those boundaries.

Total acreage to be treated each contract year is 129.14.

2.3.6. Contract acreage treated may vary by 3 percent at the discretion of the CO/COR to allow for entry roads, ditches, shoulder rock, around dumpster or additional areas not previously identified.

2.3.7. An attempt should be made to not spray directly onto buildings or equipment. When using “boom busters” spray will not be allowed on buildings or equipment. Switch platforms must be sprayed to alleviate weed growth under the platforms.

2.3.8. Contractor shall cover all substation drains and catch basins to prevent contamination from herbicide application.

2.3.9. Any defect (weed re-growth) brought to the Contractor’s attention by the Government must be corrected by re-performance 14 calendar days after notification by the Government. The COR may approve additional time to correct the defect as the COR deems appropriate. If recurring defects occur in a growing season, or the Contractor fails to correct a defect in the required time, the recurring defects or failure to perform in a timely manner will be reported to the Contracting Officer for appropriate action.

2.3.10. If the Contractor believes that technical specifications conflict with the material manufactures labeled instructions, the CO shall be notified immediately. No herbicides are to be applied to a site until resolutions of the conflicting instructions are arrived at.

2.4. Daily report

The Contractor shall complete a daily report to include the following:

2.4.1. The Contractor's representatives name, State Herbicide Applicator's License number, site treated acreage or square feet treated and signature shall appear on each report. A copy of the signed report shall be submitted by the Contractor to the CO/COR with invoice submittal.

2.4.2. No payment will be made for any work not documented by a daily report with all pertinent information (see section 13. Invoice).

3. Invoicing/Payment

3.1 Requirements

3.1.1 The herbicide application is complete for any given site and the work has been inspected and approved. Payment will be made based upon actual acreage treated.

3.1.2 Payment will be processed when the task is complete for any given site, work has been inspected and All Federal and State required record keeping documentation (and services performed) have been submitted and approved.

3.1.3 Information should include the date of herbicide application, place (facility name) and size of area treated. Name and manufacturer of herbicide applied, together with the EPA pesticide registration number and produce lot number from the labels. Include name and manufacturer of spray marking dye and any drift control agents used. Method of application (equipment used, carrier), sprayer accuracy and calibration logs. Weather conditions at time of application (wind speed, wind direction, temperature, rainfall and humidity). Quantity/rate of herbicide applied (pounds of active ingredient per acre or quantity of product per acre). Any problems associated with the application of herbicides (e.g., noncompliance with environmental and health/safety laws or regulations). Other information/data as required by applicable Federal and State regulations.

4. Warranty

4.1 The Contractor shall guarantee that all areas treated for Bare Ground control under this contract are to remain weed free for at least one (1) growing season following application. Any additional application necessary during this period will be done at the Contractor's expense.

4.2 On all warranty performance requests, the Contractor shall respond and correct the deficiency within 14-calendar days of notification.

EXHIBIT 1

PERFORMANCE REQUIREMENTS SUMMARY

Performance Objective PWS SECTION Performance Standard

1. NO WEEDS IN BARE GROUND AREA 2.2.9 90% OF AREA WEED FREE.

2. NO OVERSPRAY ON WAPA

BUILDINGS OR STRUCTURES

2.1.7 95% PROPERTY FREE OF ANY

OVERSPRAY

1. PESTICIDE USE PROPOSALS

(PUPS)

2.1.2 100% COMPLIANCE

EXHIBIT 2

Contract Discrepancy Report

Contract No. 1. Report No. for this Discrepancy:

Contractor’s Name: 2. From: (Name of Contracting Officer representative)

Dates

3. Prepared: 4. Returned by

Contractor:

5. Action Complete:

6. Discrepancy or Problem: (Describe in detail; include reference to PWS directive; attach continuation sheet, if necessary):

Signature of CO:

7. To: (Contracting Officer) 8. From: (Contractor)

9. Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence (Attach Continuation Sheet if Necessary)

10. Signature of Contractor Representative: Date:

11. Government Evaluation:

12. Government Actions:

13 Close Out Name Title Signature Date

(13a) Contractor Notified

(13b) COR

(13c) CO

Substation/Comm Sites State and County Latitude and Longitude Zone/District Acreage Water

1 Animas Substation

Colorado, La Plata

LATITUDE: N 37 15' 29"

LONGITUDE: W 107 52' 42"

Southern

1.25

No

2 Bears Ears Substation

Colorado, Moffat

LATITUDE: N 40 28' 51"

LONGITUDE: W 107 35' 35"

Northern

17.1

3 Big Mesa Comm Site

Colorado, Gunnison

LATITUDE: N 38 26' 03"

LONGITUDE: W 107 01' 17"

Central

0.25

4 Blue Mesa Substation

Colorado, Gunnison

LATITUDE: N 38 27' 05"

LONGITUDE: W 107 20' 19"

1.1

5 Blue Ridge Comm Site

Colorado, Grand

LATITUDE: N 39 55' 42"

LONGITUDE: W 106 16' 12"

6 Brush Creek Tap

Utah, Uintah

LATITUDE: N 40 33' 59"

LONGITUDE: W 109 23' 11"

0.6

7 Cahone Substation

Colorado, Dolores

LATITUDE: N 37 38' 45"

LONGITUDE: W 108 45' 40"

0.28

8 Canon City West Substation

Colorado, Fremont

LATITUDE: N 38 30' 17''

LONGITUDE: W 105 19' 13"

9 Cathedral Bluffs Comm Site

Colorado, Rio Blanco

LATITUDE: N 39 55' 23"

LONGITUDE: W 108 37' 33"

10 Cedar Mountain Comm Site

Colorado, Moffat

LATITUDE: N 40 33' 57"

LONGITUDE: W 107 36' 38"

11 Cliff Ridge Comm Site

Utah, Uintah

LATITUDE: N 40 21' 21"

LONGITUDE: W 109 08' 44"

12 Cow Point Comm Site

Colorado, Montezuma

LATITUDE: N 37 35' 04"

LONGITUDE: W 108 56' 37"

0.3

13 Craig Maintenance Facility

Colorado, Moffat

LATITUDE: N 40 30' 26"

LONGITUDE: W 107 32' 12"

Yes

14 Curecanti Substation

Colorado, Montrose

LATITUDE: N 38 25' 46"

LONGITUDE: W 107 32' 08"

15 Deer Peak Comm Site

Colorado, Custer

LATITUDE: N 38 02' 29"

LONGITUDE: W 105 11' 05"

16 Dove Cree Substation

Colorado, Dolores

LATITUDE: N 37 44' 45"

LONGITUDE: W 108 52' 55"

17 Fairview Substation

Colorado, Dolores

LATITUDE: N 37 32' 51"

LONGITUDE: W 108 44' 14"

Appendix for Bare ground Control

18 Flaming Gorge Comm Site

Utah, Daggett

LATITUDE: N 40 54' 51"

LONGITUDE: W 109 25' 36"

0.5

19 Flaming Gorge Substation

Utah, Daggett

LATITUDE: N 40 54' 43"

LONGITUDE: W 109 25' 34"

4.5

20 Fontenelle Camp Comm

Wyoming, Lincoln

LATITUDE: N 41 59' 17"

LONGITUDE: W 110 03' 36

21 Fontenelle Substation

Wyoming, Sweetwater

LATITUDE: N 42 01' 37"

LONGITUDE: W 110 03' 53

22 Four Corners Comm Site

New Mexico, San Juan

LATITUDE: N 36 41' 01"

LONGITUDE: W 108 29' 30"

0.75

23 Granby Pump Plant

Colorado, Grand

LATITUDE: N 40 10' 55"

LONGITUDE: W 105 52' 16"

24 Granby Substation

Colorado, Grand

LATITUDE: N 40 08' 30"

LONGITUDE: W 105 53' 38"

25 Great Cut Substation

Colorado, Montezuma

LATITUDE: N 37 30' 44"

LONGITUDE: W 108 35' 21"

0.65

Yes (At Plant)

26 Green Mountain Comm Site

Summit, Colorado

LATITUDE: N 39 52' 29"

LONGITUDE: W 106 19' 45"

27 Green Mountain Switchyard

Colorado, Summit

LATITUDE: N 39 52' 45"

LONGITUDE: W 106 20' 01"

0.2

28 Green River Comm Site

Wyoming, Sweetwater

LATITUDE: N 41 33' 09"

LONGITUDE: W 109 23' 38

29 Grizzly Ridge Comm Site

Utah, Uintah

LATITUDE: N 40 44' 21"

LONGITUDE: W 109 29' 02"

30 Hayden Comm Site

Colorado, Routt

LATITUDE: N 40 28' 49"

LONGITUDE: W 107 11' 00"

Included in Hayden Sub

31 Hayden Pole Yard

Colorado, Routt

Hayden Sub

32 Hayden Substation

Colorado, Routt

11.9

33 Kremmling Substation

Colorado, Grand

LATITUDE: N 40 00' 25"

LONGITUDE: W 106 21' 55"

3.6

34 Midway Substation

Colorado, El Paso

LATITUDE: N 38 33' 39"

LONGITUDE: W 104 41' 30"

6.44

35 Monarch Comm Site

Colorado, Montrose

LATITUDE: N 38 27' 58"

LONGITUDE: W 107 52' 27

36 Moncisco Comm Site

New Mexico, San Juan

LATITUDE: N 36 28' 39"

LONGITUDE: W 108 14' 49"

1.25

37 Montrose POC Substation

Colorado, Montrose

LATITUDE: N 38 26' 18"

LONGITUDE: W 107 57' 04"

38 Mount Elbert Substation

Colorado, Lake

LATITUDE: N 39 06' 22"

LONGITUDE: W 106 20' 49"

2.5

39 North Park Substation

Colorado, Jackson

LATITUDE: N 40 48' 47"

LONGITUDE: W 106 17' 22"

40 Oak Creek Tap

Colorado, Routt

LATITUDE: N 40 17' 03"

LONGITUDE: W 106 57' 18"

41 Pinon Hills Comm Site

Colorado, Chaffee

LATITUDE: N 38 32' 55"

LONGITUDE: W 105 59' 48

42 Pleasant View Substation

Colorado, Montezuma

LATITUDE: N 37 35' 17"

LONGITUDE: W 108 46' 57"

43 Poncha Switchyard

Colorado, Chaffee

LATITUDE: N 38 30' 33"

LONGITUDE: W 106 05' 29"

3.5

44 Raspberry Creek Comm Site

Colorado, Montrose

LATITUDE: N 38 18' 57"

LONGITUDE: W 108 11' 56"

45 Rifle Comm Site

Colorado, Garfield

LATITUDE: N 39 31' 00"

LONGITUDE: W 107 40' 18"

Included in Rifle Sub

46 Rifle Substation

Colorado, Garfield

LATITUDE: N 39 31' 14"

LONGITUDE: W 107 40' 48"

4.6

47 Ruin Canyon Substation

Colorado, Montezuma

LATITUDE: N 37 34' 23"

LONGITUDE: W 108 51' 36"

48 Salida Substation

Colorado, Chaffee

LATITUDE: N 38 31' 16”

LONGITUDE: W 106 05' 03”

49 Sand Rock Comm Site

Colorado, San Miguel

LATITUDE: N 37 53' 28"

LONGITUDE: W 108 50' 03"

50 Sheeps Knob Comm Site

Colorado, Montrose

LATITUDE: N 38 27' 32"

LONGITUDE: W 107 34' 59"

51 Shiprock Substation***

New Mexico, San Juan

LATITUDE: N 36 47' 48"

LONGITUDE: W 108 28' 33"

26.5

52 Silt Pumping Plant

Colorado, Garfield

LATITUDE: N 39 32' 41"

LONGITUDE: W 107 37' 44"

53 Skito Substation

Colorado, Gunnison

LATITUDE: N 38 32' 53"

LONGITUDE: W 106 57' 13"

54 Sunlight Peak Comm Site

Colorado, Gunnison

LATITUDE: N 39° 25' 39"

LONGITUDE: W 107° 22' 54"

55 Table Mountain Comm Site

Grand, Colorado

LATITUDE: N 40 09' 48"

LONGITUDE: W 105 54' 15

56 Towaoc Substation

Colorado, Montezuma

LATITUDE: N 37 25' 46"

LONGITUDE: W 108 34' 29

57 Tyzack Pump Plant

Utah, Uintah

LATITUDE: N 40 34' 22"

LONGITUDE: W 109 25' 17"

58 Vernal Comm Site

Utah, Uintah

LATITUDE: N 40 23' 50"

LONGITUDE: W 109 27' 56"

Vernal Sub

59 Vernal Pole Yard

Utah, Uintah

LATITUDE: N 40 23' 51"

LONGITUDE: W 109 27' 52"

Vernal Sub

60 Vernal Substation

Utah, Uintah

LATITUDE: N 40 23' 51"

LONGITUDE: W 109 27' 52"

4.52

61 Waterflow Substation

New Mexico, San Juan

LATITUDE: N 36 49' 01"

LONGITUDE: W 108 26' 33"

3.8

62 Willow Creek Pump Plant

Colorado, Grand

LATITUDE: N 40 08' 50"

LONGITUDE: W 105 56' 31"

TOTAL Acreage 129.14

Substations Only 118.96 Communication Sites 126.61

Incidentals (2%) 2.53

Total 129.14

*** Indicates KROVAR must be used due to BLM ruling

1. GENERAL
1.2. Background
1.3. Location
1.4. Government Personnel
1.5. Contractor Personnel
1.6. Hours of Work
1.7. Submittals
1.8. Pre-Performance Meeting
1.9. Quality Control and Quality Assurance
1.10. Compliance with Regulations
1.11. Licenses and Permits
1.12. Materials, Equipment and Storage
1.13. Interference with Business
1.14. Government Furnished Property, Equipment, Materials and Utilities
1.15. Security of Facilities
1.16. Safety
1.17. Environmental Requirements
1.18. PWS Exhibits
2. Scope of Work
2.1. Qualifications:
2.1.1. Contractor Foreman/Project Manager/Project Superintendent (who will be onsite during all
treatment services) shall possess at least five (5) years of experience in weed control application in
and around high voltage substations.
2.1.2. Personnel shall be licensed to apply pesticides in Colorado, Nebraska, Wyoming, and Montana.
2.1.3. Contractor shall own or lease at least four trucks and/or trailers (4-wheel drive with extended/higher clearance) with water tanks/mixing capability.
2.3. Herbicide Application
2.4. Daily report
3. Invoicing/Payment
4. Warranty

File details come from the government source that posted it. Updated .