01_-_SOW_For_Structural_Lumber_Observation_Platform_LWS.pdf

PDF 168 KB Posted

Attached to
WA-FWS LWS NFH-MOLDED LUMBER MATERIAL
Solicitation number
140FS123Q0140
Issued by

About this file

This statement of work requests proposals for structural molded lumber materials to replace an observation platform at the Little White Salmon National Fish Hatchery in Washington. The US Fish and Wildlife Service seeks delivery by November 30, 2023 of fiber reinforced structural molded lumber components matching those in an attached bill of materials. Proposals may include substitutions if equal or better than the specified "Tangent" material and accompanied by supporting structural calculations. Delivery must be pre-coordinated for a forklift and take place between 7:30am to 3:00pm Pacific time on weekdays. Questions should be directed to the points of contact provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Little White Salmon National Fish Hatchery, WA

Structural Lumber Material Procurement

U.S. Fish & Wildlife Service

1. Background:

a. The purpose of this procurement is for the USFWS to procure Fiber Reinforced

Structural Molded Lumber to be used as structural components to replace the existing

Little White Salmon Observation Platform.

b. The project is to be completed in partnership with a local volunteer organization.

2. Scope of work:

a. Contractor shall review attached Bill of Materials (BOM) and provide a cost proposal to procure the requested materials and transport them to the hatchery address listed at the top of the BOM. The hatchery has a forklift available to support unloading, but delivery must be pre-coordinated at least 24-hours prior to arrival for access. Delivery trucks must arrive no later than 2:00 pm to allow for unloading during normal business hours.

b. The structure is planned to mirror the look of aged northwest cedar so the Fiber

Reinforced Structural Molded Lumber color should be a grey or variant of a grey color.

c. Contractors may propose a substitution to the “Tangent” material listed in the solicitation, but must demonstrate that the substitution is equal to/or better than the

Tangent material and the proposal must include the associated structural calculations to support the substitution.

d. Required Delivery date: Nov 30, 2023

i. USFWS can accept early delivery and, if invoice is submitted can process payment in IPP upon actual delivery date.

ii. Work Hours: Monday - Friday 7:30 am (PST) - 3:00 pm (PST) only

3. Project POC:

Contracting Officer’s Representative:

To Be provided upon Award. Please forward any questions to Oscar_orozco@fws.gov mailto:Lynn_moriarty@fws.gov mailto:bob_turik@fws.gov

File details come from the government source that posted it. Updated .