01 RWM Addendum #3.pdf

PDF 151 KB Posted

Attached to
Western Elementary School Bid Package #2 -Addendum #3
Solicitation number
RFP - WEST - 240000000145
Issued by
Jackson County, Michigan

About this file

This document is Addendum #3 for the New Western Elementary School project bid being managed by R.W. Mercer Co. General Contracting Division. The addendum provides clarification and changes to the original bid documents issued on October 16, 2023. Key changes include a revised bid due date and time of November 29, 2023 at 2:30 pm, a revised bid form with changes to the "Combined Bid Offer", clarification on Alternate 1 work, and instructions for submitting additional required documents such as the Familiar Disclosure Statement and Iran Economic Sanctions Act Affidavit. Contractors are also directed to review the attached RFI Log, Revised Milestone Schedule, and Bid Opening Map. Additionally, the addendum notes that this is not a prevailing wage project, bid bonds are required, and performance/labor & material bonds may be required for bids over $3 million.

The addendum specifies that all applicable taxes must be included, dumpsters will be provided by the Construction Manager, and the cutoff for RFI submissions is November 17, 2023. Interested contractors are advised to review the full addendum and all attached documents on the provided SharePoint site link.

View the file

Other files

File Type Posted
01 RWM Addendum #1.pdf PDF
01 RWM Addendum #2.pdf PDF
01 RW Mercer Addendum #4.pdf PDF
Advertisement For Bid - Western School Bid Package #2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R. W. MERCER CO. - GENERAL CONTRACTING DIVISION

P.O. BOX 180, 2322 BROOKLYN ROAD, JACKSON, MICHIGAN 49203

TELEPHONE: (517) 787-2960 FAX: (517) 787-1970 / 787-8111

AADDDDEENNDDUUMM ##33

ADDENDUM #3 – 11/10/23

DATE: NOVEMBER 10, 2023

PROJECT: NEW WESTERN ELEMENTARY SCHOOL

This Addendum provides clarification and information regarding the Bidding Documents issued for bid dated October 16th, 2023 for the above-referenced project and hereby become a part of the Bidding Documents for that project.

The Bidder shall review this information and follow the instructions for any and all changes and shall include in its bid amount any and all adjustments in cost. All material, transportation, taxes, etc., and any other related costs are applicable as required or implied by this Addendum.

All items not mentioned by this Addendum shall remain unchanged and as per the original Bidding Documents.

GENERAL INFORMATION – BIDDING DOCUMENTS: (New Items per This Addendum are highlighted yellow)

1. The Bid Due Date & Time HAS CHANGED; Bids are now due at the Western School District Administration Building, 1400 S. Dearing Road, Parma MI 49269 on Wednesday, November 29th at 2:30pm. Please see attached aerial photo included in this Addendum for the entrance doors and parking lot all Contractors should access on bid day; Contractors are welcomed to attend the public bid opening starting at approximately 2:45pm at the Western Community Arts Center (High School Auditorium) as noted on the attached Bid Opening Map as well.

2. Refer to the attached TMP Architecture’s Addendum #2 Package to be incorporated herein as part of this overall Addendum issuance.

3. Refer to the RFI LOG as included within this Addendum as a means to further explain any changes or clarifications noted in both Addendums #1 & #2.

4. Refer to the attached Revised Milestone Construction Schedule for all Work Categories use in the assembly of their bids. NOTE: It is the Western School Districts and Construction Managers intent to begin onsite construction this winter beginning with the single-story Zones E & F Classroom wings.

Construction will continue throughout the winter months of 2023 & 2024 unless sever weather conditions prohibit efficient progress, or the quality of work could be adversely affected.

5. A second Revised Bid Form is included as part of this Addendum; all Work Categories are to use this Bid Form for the submission of their bids. Revisions to this Bid Form include changing the “Combined Bid Offer” to “Combined Bid Deduct Offer”.

6. Clarification of Alternate 1: The additional work encompasses the following: First Floor Zone A Classroom A126 and Huddle Room A125 and extending Corridor A100 and First Floor Zone B Classroom B127 and Huddle Room B126 and extending Corridor B100; Second Floor Zone A Classroom A229 and Huddle Room A228 and extending Corridor A227 and Second Floor Zone B Classroom B129 and Huddle Room B128 and extending Corridor B228. Stair Towers at both Zones A & B are to be relocated to the south as shown. There are only a Total of 4 Classrooms with Huddle Rooms that are Added per this Alternate.

7. All Work Categories are responsible to review all Alternate information as listed in Specification Section 01-23-00 for a greater understanding of the work involved for each Contractors Scope Outline.

8. Refer to the attached Revised Bid Opening Map for locations of Bid drop-off, parking and public opening.

rschonhard Rectangle

ADDENDUM #3 – 11/10/23

9. The cut-off for the submission of RFI’s shall be the end of the day Friday, November 17th. Please submit the attached Revised RFI Form when requesting information.

10. All Bidding Contractors shall fill out and submit along with their bids the attached Familiar Disclosure Statement and Iran Economic Sanctions Act Affidavit of Compliance as required by State Law; Bids received without the inclusion of these documents will not be read.

11. Contractors are reminded that the last sheet of their respective Work Category Scope Outlines as contained in the bidding documents MUST BE filled out, signed and attached to the Bid Form when submitting its proposals.

12. All Bidding Documents, including Addendums, can be viewed on RW Mercer’s SharePoint file sharing websites by connecting to the following link:

https://rwmercerco-my.sharepoint.com/:f:/g/personal/rschonhard_rwmercer_com/Ev4JjZ7VLhpOi3wIMABYpy4Br_FnOSweIE S5gkjThGsKoQ?e=CFbNWC

13. This is NOT a Prevailing Wage Project.

14. Bid Bonds or Certified Cashier’s Checks in the amount equivalent to 5% of the Contractors Base Bid ARE

REQUIRED.

15. Performances, Labor & Material Bonds MAY BE REQUIRED for Bids received in excess of $3,000,000;

Include costs for bonds as instructed on the Revised Bid Form included in this Addendum. DO NOT INCLUDE the P, L&M Bond Premium Costs in the Contractors Base Bid.

16. This project is NOT tax exempt. All applicable taxes need to be included.

17. Dumpsters shall be furnished by the Construction Manager for use by the Project Contractors for disposal of ordinary / common debris generated as part of their work or unless otherwise noted in the individual Work Category Scopes Outlines. Misuse or improper disposal methods can result in Contractors losing their privilege of using these dumpsters and causing them to pay for their own disposal fees.

ATTACHMENTS:

1. Revised Milestone Schedule

2. Revised RFI Form

END OF ADDENDUM #3