This memorandum outlines requirements for a project to install a fire detection system and finishes at Fort Wainwright, Alaska. The project is funded through fiscal year 2023 deferred facility sustainment, restoration, and modernization funds, with a statutory limitation of $500,000 for minor construction. Interested vendors should schedule a pre-proposal site visit and respond to the sources sought notice by January 31, 2024 by emailing the points of contact listed to express capability and interest in the effort. The selected contractor must complete 95% of the work within 90 days of notice to proceed, submit 95% design documents within 21 days thereafter, and achieve 100% completion within 14 days of the subsequent notice to proceed. A one-year warranty on materials and workmanship will commence upon final acceptance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEMORANDUM FOR 354 CONS/PKA 18 January 2024

FROM: 354 CES/CENMP

SUBJECT: INSTALL FIRE DETECTION SYSTEM AND FINISHES, FTQW 251101

1. Forwarded for your continuance of action are the following attachments:

a. Synopsis of Work

b. Statement of Work

c. Government Cost Estimate

d. Evaluation Factors

2. Period of Performance for each task is:

- 90 calendar days after receipt of Notice to Proceed to 95%.

- 21 calendar days after submittal of the 95% Design documents.

- 14 calendar days after receipt of Notice to Proceed to 100%.

3. This project is on FY23 dFSRM.

4. There is no statutory limitation for the repair portion of this project, but the statutory limitation of the minor construction portion is $500,000.

5. I have reviewed the requirement, including available technical documentation, and believe that it does not require the contractor to use Class I Ozone Depleting Substances (ODS) identified in Air Force Policy, nor is it written so that it can only be met by the use of a Class I ODS. The Government does not anticipate asbestos, but does anticipate PCB, and/ or lead containing materials.

6. Please schedule a pre-proposal site visit after the initial posting.

7. Provide a standard one-year warranty on materials and workmanship commencing at final acceptance.

8. If you have any questions or need further assistance, please call me at (907) 377-4304.

Project Manager

354 CES/CEN