This solicitation requests proposals for the removal of existing dewatering pit pumps and installation of new pumps at two lock locations. The scope of work includes furnishing hatch cover sills, concrete work, plumbing, pipefitting and electrical wiring at each site. The procurement is set aside for small businesses under NAICS code 237990 for other heavy and civil engineering construction. The magnitude of construction is between $100,000 and $250,000. Interested offerors should attend the site visit on June 13th and submit any questions by June 16th. Proposals are due by June 30th and should be emailed to the points of contact listed. Performance and payment bonds are required within ten days of award. The soliciting agency is the Department of Transportation Saint Lawrence Seaway Development Corporation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ_6923G522Q0771_Dewatering_Pit_Install.pdf | ||
| RFQ 6923G522Q0771_Statement of Work.pdf | ||
| 02 - Gould Pump Specifications.pdf | ||
| 07 - Wage Determination.pdf | ||
| 05 - Existing Fairbanks Morse Pump Drawing.pdf | ||
| 06 - Past Performance Questinnaire (PPQ).pdf | ||
| 04 - Snell Reference Drawings - 1 of 5.pdf | ||
| 03 - Eisenhower Reference Drawings - 1 of 7.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THREADED DRIVE COUPLING
PUMP DISCHARGE HEAD &
SUCTION COLUMN
(CORPORATION SUPPLIED)
i: '.:�t.2.:i�-i�;{i{.�:;{;:•{:-�S{;:}�:J�:-'
---�----'-...._--'---"-'-"---'---"'--�----'--'--"------'--'-'--'-'S.....�=-----'-'--"""--"---', ,:_-�,-�: . ,-!-i.�
�,e1·
:: 1.f!'
·,1.•_ :.
'<1:
:of'! ·•
T
HATCH OPENING
NEW 40HP ELECTRIC MOTOR
(HOLLOW SHAFT STYLE)
(CORPORATION SUPPLIED)
. i .·.
FIELD WELD ANY PIPING AS REQUIRED
APPROXIMATELY 1 • PIPE STUB TO BE PLUGGED/CAPPED
EXISTING 1-1/2" BUBBLER PLUMBING TO BE DEMOLISHED INCLUDING WALL
MOUNTS. CUT OFF PIPE AT WALL AND CAP, GROUT, OR APPROVED PLUG
TYPICAL EISENHOWER & SNELL.
6° 125# FLANGED SWING CHECK VALVE
6° 125# FLANGED WOO NON-RISING STEM WEDGE GATE VALVE
CLEAN PIPE STUB W/ WIRE WHEEL PRIOR TO NEW INSTALL
PER MANUF. INSTRUCTIONS. EXISTING STYLE COUPLING SHOWN.
TO BE REPLACED WITH HYMAX GRIP COUPLING.
6° CAST IRON PIPE IN WALL
._.-..:l-----:-E�����3'-i.<Cf.
19°
FIELD VERIFY
. '�. •.:- · .. 4
•,el' ..
:,r,_·J.-----
"':·•,i
, ,_r
,n➔-, PIT BELOW FLOOR LEVEL IS A CONFINED SPACE
STAINLESS STEEL SUPPORT BY CONTRACTOR
ADJUSTABLE HEIGHT
*NOTE: FULLY SUPPORT VALVES AND PIPING
AT ALL TIMES TO PREVENT UNDUE STRESS
ON THE COUPLING ITEM 1
.:1--------- BROKEN SECTION FOR CLARITY
EISENHOWER/SNELL DEWATERING PITS- NEW
PUMP INSTALLATION- ELEVATION SECTION VIEW
SCALE :f"=1'-0"
· · -,.-�- EXISTING LOWER COLUMN ANCHOR
. BRACKET -REPLACE WITH STAINLESS STEEL BRACKET FABRICATED BY CONTRACTOR AS .
'.f :.
REQUIRED, CONTRACTOR SUPPLIES STAINLESS STEEL ANCHORS ALSO
·: · · .,. ·. . · (REPRESENTATION ONLY-EXACT GEOMETRY UNKNOWN)
: . i-,e1;_; ·.
1. USE THIS DRAWING IN CONJUNCTION WITH REFERENCE DRAWINGS CALLED OUT IN THE REQUEST FOR QUOTE.
2. THE MAJORITY BILL OF MATERIAL ON THIS DRAWING HAS BEEN PURCHASED BY AND WILL BE SUPPLIED BY THE CORPORATION, INCLUDING THE 6° VALVES AND COUPLING A FEW INCIDENTAL ITEMS MAY STILL BE NEEDED AND SHALL BE SUPPLIED BY CONTRACTOR.
3. THE BILL OF MATERIAL QUANTIES LISTED ARE FOR ONE DEWATERING PIT LOCATION
4. EISENHOWER & SNELL LOCK DEWATERING PIT ROOMS ARE ORIENTED IN DIFFERENT CARDINAL DIRECTIONS BUT ARE SIMILAR IN LAYOUT. SEE REFERENCE
DRAWINGS.
5. ANY WALL OR FLOOR ANCHORS TO BE STAINLESS STEEL
6. CRANE WORK SHALL NOT INTERFERE WITH SHIPPING. SEE SCOPE OF WORK •
ITEM Q1Y.
4 2
BILL OF MATERIAL
(NON-COMPREHENSIVE)
DESCRIPTION
HYMAX GRIP COUPLING
FOR 6° CAST IRON TO 6° STEEL PIPE
(GLS PROVIDED)
6° 125# WOO FLANGED NON-RISING STEM SOLID WEDGE
GATE VALVE ASME B16.34 GLS PROVIDED
s• 125# SWING CHECK VALVE (ASME B16.34)
(GLS PROVIDED)
6° 150# STEEL WELDED SUP ON FLANGE
(GLS PROVIDED)
6° NPS SCH 40 STEEL PIPE ASTM A53 AS REQUIRED
(GLS PROVIDED)
s· X a· NPS SCH 40 ECCENTRIC WELDED TRANSmON
(GLS PROVIDED)
8° NPS SCH 40 STEEL PIPE ASTM A53 AS REQUIRED
(GLS PROVIDED)
0-100PSI GLYCERIN FILLED PRESSURE GAGE
WITH INLINE SHUTOFF VALVE.
GLS PROVIDED
9 1-1 /2" NPS SCH 40 STEEL PIPE ASTM A53 AS REQUIRED
(GL.S PROVIDED)
REV. DATE
1-1/2" NPS SCH 40 TEE
(GLS PROVIDED)
1-1/2" NPT INUNE SWING CHECK VALVE
(GLS PROVIDED)
1-1 /2" QUARTER TURN SHUTOFF VALVE
(GLS PROVIDED)
1-1/2" NPT 90" STREET ELBOW
(GLS PROVIDED)
1-1/2" NPT X :f" NPT REDUCING BUSHING
(GLS PROVIDED)
:f" NPT X GARDEN HOSE ADAPTER
(GLS PROVIDED)
STAINLESS STEEL SUPPORT STAND
(CONTRACTOR PROVIDED)
8° 150LB WELDED SUP ON FLANGE
(GLS PROVIDED)
DESCRIPTION BY
GREAT LAKES ST. LAWRENCE SEAWAY
DEVELOPMENT CORPORATION
MASSENA, NE1f YORK
OFFICE OF ENGINEERING AND JIJ.INTENANCE
CORPORATION FACILITIES
EISENHOWER AND SNELL LOCKS
DEWATER/NG PITS
WATER INFILTRATION CONTROL
SECTIONS AND PLANS
-=Jl,='J.=:r.'--------
.IIIUD.· JIJL
cnctlD• AKC
BCAU: .11,127,
NT S 04/14/22
SIIJlff
2 ,,, 3
DWG. NO.
SLS-370-250/2
File details come from the government source that posted it. Updated .