01-4 Attachment 3b (Submittals) F-20-401.pdf
PDF 78 KB Posted
- Attached to
- Repair Concrete Pier Apron, Pier 341 and Damaged Grating Basins at Yokohama North Dock, Kanagawa-ken, Japan
- Solicitation number
- FA520920B0001
About this file
This document includes a solicitation for repair work on concrete piers and damaged grating basins at Yokohama North Dock in Japan. The solicitation involves two projects, including repair of a concrete pier apron at Pier 341 and repair of damaged grating basins at the dock. The performance period to complete both projects is 270 calendar days from the effective date of the notice to proceed. The government's cost estimate for both projects ranges from 111,154,200 Japanese yen to 555,771,000 Japanese yen. The solicitation method is an invitation for bid employing competitive bids, public opening of bids, and award. Bidders will be required to furnish a bid guarantee and performance bond. A site visit will be held on March 10, 2020 at 12:30 PM at the dock's main gate, with participation limited to three personnel and one vehicle per bidder.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
F-20-402
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVED
SECTION 01 11 02
1.10.2 Safety *
SECTION 01 11 02
1.10.3 Environmental **
SECTION 01 11 02
1.13.1 Comprehensive Construction P
SECTION 01 11 02
2.1 Memo for HM Usage
SECTION 01 11 02
2.3 Drawing Bindings
SECTION 01 11 02
1.17.1 As Built Drawing
SECTION 01 11 02
1.17.2 Photographic Records
SECTION 01 11 02
1.17.3 Inspection document
SECTION 01 35 43
1.4 Environmental Protection Plan**
SECTION 01 74 19
1.6 Waste Managt Plan**
SECTION 01 74 19
1.7 Manifest
SECTION 02 41 00
1.8 Dem / Deconst Plan
SECTION 03 01 00
1.5.3 Work Procedure
SECTION 03 01 00
3.2 Field Inspection Report
SECTION 03 01 00
1.5.2.3 Contractor Qualifications
X A
X
X
9 X
X
13 X
X
X
X
O
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R
U C
TI
O
N S
C
ER
TI
FI
C A
TI
O
N S
X
W O
R K
P R
O C
ED
U
R E
PL
A
N S
FA520920B0001
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
O
PE
R A
T.
M A
IN
T.
LI
C
EN
SE
S
Repair damaged grating basin
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
X
A or E
A or E
B
A
X
X
X
A or E
A
A
D or E
D
E
A
D
A
X D or E8
A. W/in 15days after AWD / NTP whichever later B. 15 days prior to commencement of applic. work C. W/in 5days after commencement of applic. work D. Prior to compl. of Const. Pd.
E. Consult w/ CI
* Safety Office Only ** Env. Div Only *** CMB Only
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
F-20-402
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVEDO
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
W O
R K
P R
O C
ED
U
R E
PL
A
N S
FA520920B0001
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
O
PE
R A
T.
M A
IN
T.
LI
C
EN
SE
S
Repair damaged grating basin
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SECTION 03 32 01
1.8 Work Procedure
SECTION 03 32 01
1.7 Detail Drawings
SECTION 03 32 01
3.5 Field Inspection Report
SECTION 05 05 24
1.3 Work Procedure
SECTION 05 05 24
1.3 Field Inspection Report
SECTION 05 05 24
1.4.1 Welder, Welding Operator, And
SECTION 05 50 15
3.8 Work Procedure
SECTION 05 50 15
1.4 Detail Drawings
SECTION 05 50 15
3.8 Field Inspection Report
SECTION 09 90 00
1.9 Work Procedure
SECTION 09 90 00
1.9 Field Inspection Report
SECTION 33 01 30
1.5.2 Work Procedure
SECTION 33 01 30
3.4 Field Inspection Report
SECTION 33 01 30
1.5.1 Qualifications
SECTION 33 01 30
3.3.1 Records of Disposals
A16 X
17 X B
18 X D or E
19 X A
20 X D or E
21 X A
22 X A
23 X B
24 X D or E
25 X A
26 X D or E
27 X A
28 X D or E
29 X A
30 X D or E
A. W/in 15days after AWD / NTP whichever later B. 15 days prior to commencement of applic. work C. W/in 5days after commencement of applic. work D. Prior to compl. of Const. Pd.
E. Consult w/ CI
* Safety Office Only ** Env. Div Only *** CMB Only