01-3 Attachment 3a (Submittals) F-20-400.pdf
PDF 78 KB Posted
- Attached to
- Repair Concrete Pier Apron, Pier 341 and Damaged Grating Basins at Yokohama North Dock, Kanagawa-ken, Japan
- Solicitation number
- FA520920B0001
About this file
This solicitation seeks competitive bids for two repair projects at Yokohama North Dock in Japan. Project F-20-400 involves repairing a concrete pier apron and Pier 341, while Project F-20-401 repairs damaged grating basins. The performance period for both projects is 270 calendar days from notice to proceed. The total value of the projects ranges from 111.15 to 555.77 million Japanese yen. A site visit will be held on March 10, 2020, with registration due by March 3. Bids are due by the date specified in the solicitation. The successful bidder must furnish a bid guarantee and performance bond. The solicitation is issued by the Department of the Air Force Pacific Air Forces.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
F-20-400
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVED
SECTION 01 11 02
1.10.2 Safety *
SECTION 01 11 02
1.10.3 Environmental **
SECTION 01 11 02
1.13.1 Comprehensive Construction P
SECTION 01 11 02
2.1 Memo for HM Usage
SECTION 01 11 02
2.3 Drawing Bindings
SECTION 01 11 02
1.17.1 As Built Drawing
SECTION 01 11 02
1.17.2 Photographic Records
SECTION 01 11 02
1.17.3 Inspection document
SECTION 01 35 43
1.4 Environmental Protection Plan**
SECTION 01 74 19
1.6 Waste Managt Plan**
SECTION 01 74 19
1.7 Manifest
SECTION 03 01 00
1.5.3 Work Procedure
SECTION 03 01 00
3.2 Field Inspection Report
SECTION 03 01 00
1.5.2.3 Contractor Qualification
SECTION 03 32 01
1.8 Work Procedure
X A14
X D or E13
A12 X
A
DX
15 X
X
A
D
E
A
X D or E
A or E
A or E
B
A
X
X
X2
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
C
EN
SE
S
Repair concrete peir apron, pier 341
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
FA520920B0001
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
O
PE
R A
T.
M A
IN
T.
X
W O
R K
P R
O C
ED
U
R E
PL
A
N S
O
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
X
X
9 X
5 AX
A. W/in 15days after AWD / NTP whichever later B. 15 days prior to commencement of applic. work C. W/in 5days after commencement of applic. work D. Prior to compl. of Const. Pd.
E. Consult w/ CI
* Safety Office Only ** Env. Div Only *** CMB Only
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
F-20-400
CONTRAC-
ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS
OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL
REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL
SUBMITTAL RACTING ING DIS-
APPROVED APPROVED
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
C
EN
SE
S
Repair concrete peir apron, pier 341
C A
LC
U
LA
TO
N S
H
EE
TS
TE
ST
R
EP
O R
TS
FA520920B0001
DATE
CONTRACTOR
NOTIFIED
C A
TA
LO
G D
A
TA
C O
LO
R
S
EL
EC
TI
O N
S
O
PE
R A
T.
M A
IN
T.
W O
R K
P R
O C
ED
U
R E
PL
A
N S
O
TH
ER
S
SH
O
P D
R A
W
IN
G S
SA
M
PL
ES
IN
ST
A
LL
A
TI
O N
IN
ST
R U
C
TI
O N
S
IN
ST
R U
C
TI
O N
S
C
ER
TI
FI
C A
TI
O
N S
SECTION 03 32 01
1.7 Detail Drawings
SECTION 03 32 01
3.5 Field Inspection Report
SECTION 09 90 00
1.9 Work Procedure
SECTION 09 90 00
1.9 Field Inspection Report
SECTION 31 23 00
3.1 Work Procedure
SECTION 31 23 00
1.5.1 Excavation Plan
SECTION 31 23 00
3.1 Field Inspection Report X D or E22
B21 X
A20 X
X D or E19
A18 X
X D or E17
B16 X
A. W/in 15days after AWD / NTP whichever later B. 15 days prior to commencement of applic. work C. W/in 5days after commencement of applic. work D. Prior to compl. of Const. Pd.
E. Consult w/ CI
* Safety Office Only ** Env. Div Only *** CMB Only
File details come from the government source that posted it. Updated .