01-3 Attachment 3a (Submittals) F-20-400.pdf

PDF 78 KB Posted

Attached to
Repair Concrete Pier Apron, Pier 341 and Damaged Grating Basins at Yokohama North Dock, Kanagawa-ken, Japan
Solicitation number
FA520920B0001
Issued by

About this file

This solicitation seeks competitive bids for two repair projects at Yokohama North Dock in Japan. Project F-20-400 involves repairing a concrete pier apron and Pier 341, while Project F-20-401 repairs damaged grating basins. The performance period for both projects is 270 calendar days from notice to proceed. The total value of the projects ranges from 111.15 to 555.77 million Japanese yen. A site visit will be held on March 10, 2020, with registration due by March 3. Bids are due by the date specified in the solicitation. The successful bidder must furnish a bid guarantee and performance bond. The solicitation is issued by the Department of the Air Force Pacific Air Forces.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

F-20-400

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVED

SECTION 01 11 02

1.10.2 Safety *

SECTION 01 11 02

1.10.3 Environmental **

SECTION 01 11 02

1.13.1 Comprehensive Construction P

SECTION 01 11 02

2.1 Memo for HM Usage

SECTION 01 11 02

2.3 Drawing Bindings

SECTION 01 11 02

1.17.1 As Built Drawing

SECTION 01 11 02

1.17.2 Photographic Records

SECTION 01 11 02

1.17.3 Inspection document

SECTION 01 35 43

1.4 Environmental Protection Plan**

SECTION 01 74 19

1.6 Waste Managt Plan**

SECTION 01 74 19

1.7 Manifest

SECTION 03 01 00

1.5.3 Work Procedure

SECTION 03 01 00

3.2 Field Inspection Report

SECTION 03 01 00

1.5.2.3 Contractor Qualification

SECTION 03 32 01

1.8 Work Procedure

X A14

X D or E13

A12 X

A

DX

15 X

X

A

D

E

A

X D or E

A or E

A or E

B

A

X

X

X2

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

C

EN

SE

S

Repair concrete peir apron, pier 341

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

FA520920B0001

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

X

W O

R K

P R

O C

ED

U

R E

PL

A

N S

O

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

X

X

9 X

5 AX

A. W/in 15days after AWD / NTP whichever later B. 15 days prior to commencement of applic. work C. W/in 5days after commencement of applic. work D. Prior to compl. of Const. Pd.

E. Consult w/ CI

* Safety Office Only ** Env. Div Only *** CMB Only

PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

F-20-400

CONTRAC-

ITEM OR DESCRIPTION REQUIRED DATE DATE TO RETURN FOLLOW-UP TOR RE- FINAL REMARKS

OF ITEM, CONTRACT SUBMISSION RECEIVED CIVIL SUSPENSE SUBMIT- APPROVAL

REFERENCE, TYPE OF DATE IN CONT- ENGINEER- DATE TAL

SUBMITTAL RACTING ING DIS-

APPROVED APPROVED

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LI

C

EN

SE

S

Repair concrete peir apron, pier 341

C A

LC

U

LA

TO

N S

H

EE

TS

TE

ST

R

EP

O R

TS

FA520920B0001

DATE

CONTRACTOR

NOTIFIED

C A

TA

LO

G D

A

TA

C O

LO

R

S

EL

EC

TI

O N

S

O

PE

R A

T.

M A

IN

T.

W O

R K

P R

O C

ED

U

R E

PL

A

N S

O

TH

ER

S

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

IN

ST

A

LL

A

TI

O N

IN

ST

R U

C

TI

O N

S

IN

ST

R U

C

TI

O N

S

C

ER

TI

FI

C A

TI

O

N S

SECTION 03 32 01

1.7 Detail Drawings

SECTION 03 32 01

3.5 Field Inspection Report

SECTION 09 90 00

1.9 Work Procedure

SECTION 09 90 00

1.9 Field Inspection Report

SECTION 31 23 00

3.1 Work Procedure

SECTION 31 23 00

1.5.1 Excavation Plan

SECTION 31 23 00

3.1 Field Inspection Report X D or E22

B21 X

A20 X

X D or E19

A18 X

X D or E17

B16 X

A. W/in 15days after AWD / NTP whichever later B. 15 days prior to commencement of applic. work C. W/in 5days after commencement of applic. work D. Prior to compl. of Const. Pd.

E. Consult w/ CI

* Safety Office Only ** Env. Div Only *** CMB Only

File details come from the government source that posted it. Updated .