01_26-0312_Market Museum Facility RFQ_03_09_26 - FINAL.pdf
PDF 2 MB Posted
- Attached to
- 26-0312 - 814 MARKET ST MUSEUM REPURPOSE
- Solicitation number
- 338-26-0312
- Issued by
- Camden County, North Carolina
About this file
This Request for Qualifications (RFQ) is issued by New Hanover County, North Carolina, seeking design services for the repurposing of the Cape Fear Museum of History and Science located at 814 Market Street. The project involves transitioning the building from a public-facing facility to a collections and internal operations site, with services divided into two phases. Phase 1 includes space needs assessment, concept plan development, and budget estimation, scheduled for June 2026 through September 2026 (120 days). Phase 2 encompasses full design services including architectural, structural, mechanical, electrical, plumbing, interior design, signage, site work, utilities, and construction administration, scheduled for October 2026 through December 2026 (90 days), with an anticipated Construction Manager @ Risk delivery method. Statements of Qualifications must be submitted by 5:00 P.M. EST on Tuesday, April 07, 2026, to David King, Facilities Project Manager, at 200 Division Drive, Wilmington, North Carolina 28401. Questions may be submitted until March 24, 2026, with answers posted by March 31, 2026. Respondents should submit five (5) hard copies and one (1) electronic copy on USB. The project encompasses redesign of the existing facility to provide office space, staff meeting rooms, artifact storage, research library, exhibit fabrication shop, print production area, exhibit storage, museum storage, collections workshop, employee breakroom, and staff parking, with considerations including discrete climate control, loading dock and freight elevator access, historical facade preservation, and building accessibility.
New Hanover County reserves the right to accept or reject any or all Statements of Qualifications and to renegotiate any elements of the proposal. The evaluation process includes two selection phases: Phase 1 involves ranking firms based on past performance (40%), project approach (35%), proposed team and relevant experience (15%), and interview rating (10%). The county will select qualified firms for interviews, and Phase 2 of the selection process may require presentations. The successful firm will be approved for Phase 1, with the county retaining the option to proceed with the same firm for Phase 2. All work must be completed within twelve (12) months of the Notice to Proceed. Respondents must comply with N.C. General Statute 143-128 regarding minority business participation with a verifiable goal of 10% participation in total work value. Additional requirements include E-Verify compliance for all subcontractors, Iran Divestment Act certification, professional liability insurance with minimum limits of $1,000,000 per loss, and maintenance of certificate of authority if the firm is organized outside North Carolina.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW HANOVER COUNTY
REQUEST FOR QUALIFICATIONS DESIGN SERVICES
814 Market Street Museum Facilities Repurpose
RFQ # 26-0312
COUNTY COMMISSIONERS
LEANN PIERCE, CHAIR
DANE SCALISE, VICE-CHAIR
BILL RIVENBARK
STEPHANIE WALKER
ROB ZAPPLE
CHRIS COUDRIET, COUNTY MANAGER
Advertisement
NEW HANOVER COUNTY
REQUEST FOR QUALIFICATIONS DESIGN SERVICES
MARKET STREET MUSEUM FACILITIES REPURPOSE
RFQ 26-0312
New Hanover County is soliciting qualifications from interested firms to provide complete design services for repurposing the existing Cape Fear Museum of History and Science, transitioning the building from a primarily public-facing building to a collections and internal operations site. This project will be completed in phases:
Phase 1 – Space Needs Assessment, Concept Plan, & Budget Estimate o Evaluation of existing conditions o Working with the end users to determine the needs o Developing a concept plan for the project(s) o Developing a budget estimate for each part of the project o Determine an estimated timeline for each project
Phase 2 – Full and complete design services o Includes Architectural, Structural, Mechanical, Electrical, Plumbing, Interior design, signage, site work, utilities, construction administration, assisting with permitting with AHJs and utility providers o Anticipated delivery method is Construction Manager @ Risk (CM@R) o Includes participating in selection and working with CM@R
Submit Statements of Qualifications by mail to:
New Hanover County Attn: David King, Facilities Project Manager 200 Division Drive, Wilmington, North Carolina 28401
The deadline for receipt of Statements of Qualifications is 5:00 P.M. EST, Tuesday, April 07, 2026.
Submitted Statements of Qualifications are not subject to public inspection until a contract is awarded and executed. Statements of Qualifications will be evaluated, and firms may be contacted for interviews to be conducted by phone or in person.
Instructions for submitting Statements of Qualifications and complete requirements and information may be obtained by visiting the County’s website at: www.nhcgov.com/bids.aspx
New Hanover County reserves the right to accept or reject any or all Statements of Qualifications and to make the award which will be most advantageous to the County.
Released: Tuesday, March 10, 2026 qq
Section 1 - Schedule
1.1 RFQ Schedule
Advertisement Tuesday, March 10, 2026
Deadline for Questions (Questions may be submitted from the release date until the deadline for questions)
Tuesday, March 24, 2026 by 5:00 PM, EST
Answers to all questions Final answers posted as an addendum by Tuesday, March 31, 2026 by 5:00 PM
Deadline for Receipt of Statements of Qualifications
Tuesday, April 07, 2026 by 5:00 PM, EST To:
New Hanover County Attn: David King, Facilities Project Manager 200 Division Drive,
1.2 Proposed Design Schedule
Phase 1 – Space Needs Assessment, Concept Plan and Budget Estimate
June 2026 – September 2026 (120 days)
Phase 2 – Full and Complete Design Services
October 2026 – December 2026 (90 days)
Section 2 - Instructions
2.1 Statement of Qualifications Instructions
Submit your Statement of Qualifications in a sealed envelope properly marked “RFQ# 26-0312 Cape Fear Museum of History and Science Repurpose” and addressed to the County at the following address:
New Hanover County Attn: David King, Facilities Project Manager 200 Division Drive,
2.1.1 Firms submitting their qualifications statements are asked to submit five (5) copies of the complete statement of qualifications along with one (1) electronic copy on USB.
2.1.2 Clearly indicate the firm’s name, address, email and phone number on the first page of the Statement of Qualifications (SOQ).
2.1.3 The successful firm must have the capability of receiving and submitting all documents in an electronic format. Also, the successful firm must have Internet access for browsing and receipt of electronic documents via email.
2.1.4 Statements of Qualifications received after the time and date for closing will not be considered.
2.1.5 Submitted Statements of Qualifications are not subject to public inspection until a contract is awarded and executed.
2.1.6 After the release date, all communications between the County and prospective respondents regarding this RFQ shall be in writing. Any inquires, requests for interpretation, technical questions, clarification, or additional information shall be directed to David King, Facilities Project Manager by emailing dking@nhcgov.com. Questions and responses will be compiled and shared with all interested Respondents known to the County and posted as an addendum. All questions shall be received no later than Tuesday, March 24, 2026 by 5:00 PM, EST.
Respondents may not have communications, verbal or otherwise, concerning this RFQ with any personnel or boards from New Hanover County, other than the person listed in this section. If any vendor attempts any unauthorized communication, the proposal will be rejected.
All Respondents who intend to submit a Statement of Qualification on this project should send an email to dking@nhcgov.com including pertinent contact information. This will ensure that you receive all addenda issued for this RFQ; if applicable.
Any changes to the qualification request will be issued by addenda and sent by email to all proposers that have notified the County of their intent to submit a Qualification Package.
The addenda will also be posted on the County’s website at https://www.nhcgov.com/bids.aspx
Verbal information obtained otherwise will not be considered in the awarding of the proposal. It is the proposer’s responsibility to review and ensure that their proposal complies with any guidance provided in the addenda.
2.1.7 New Hanover County reserves the right to allow or disallow minor deviations or technicalities should the County deem it to be in the best interest of the County. New Hanover County shall be the sole judge of what is to be considered a minor deviation or technicality.
2.1.8 Statements of Qualifications will be evaluated, and oral interviews may be requested as part of the evaluation process. If interviews are conducted, the County will contact Respondents by email to schedule.
2.1.9 The selected firm shall maintain insurance as outlined in the attached draft contract.
2.1.10 All costs, including travel and expenses, incurred in the preparation of this Qualification Statement will be borne solely by the proposing Respondent.
2.1.11 No agreements with any selected Respondent shall be binding until a contract is signed and executed by the authorized County official and authorized representatives of the vendor.
2.1.12 It is the policy of New Hanover County that minority businesses, as defined by NCGS 143-128 have maximum opportunity to participate in the performance of contracts and subcontracts funded in whole or in part with public funds. The County has established a verifiable goal of ten percent (10%) participation in the total value of the work.
2.1.13 Pursuant to S.L. 2015-294, Respondents shall fully comply with the U. S.
Department of Homeland Security employee legal status E-Verify requirements for itself and all its subcontractors.
2.1.14 Trade Secret Confidentiality
Upon receipt of your Qualification Statement by New Hanover County, your submittal is considered a public record except for material which qualifies as "trade secret" under N.C. General Statute 132-1.2. After opening, your submittal will be provided to County staff and others who participate in the evaluation process, and to members of the general public who submit public records requests.
To properly designate material as trade secret under these circumstances, each Respondent must take the following precautions: (a) any trade secrets submitted by a Respondent must be submitted in a separate, sealed envelope marked "Trade Secret - Confidential and Proprietary Information - Do Not Disclose Except for the Purpose of Evaluating This PROPOSAL," and (b) the same trade secret/confidentiality designation must be stamped on each page of the trade secret materials contained in the envelope.
Do not attempt to designate your entire Qualification Statement as a trade secret, and do not attempt to designate pricing information as a trade secret. Doing so will result in your submittal being disqualified.
In submitting a Statement of Qualification, each Respondent agrees that the County may reveal any trade secret materials contained in such response to all County staff and County officials involved in the selection process, and to any outside consultant or other third parties who assist the County in the selection process. Furthermore, each Respondent agrees to indemnify and hold harmless the County and each of its officers, employees, and agents from all costs, damages, and expenses incurred in connection with refusing to disclose any material, which the Respondent has designated as a trade secret.
2.1.15 Certificate of Authority
Subject to several statutory exceptions, a business entity incorporated or organized in a state other than North Carolina must obtain a certificate of authority from the North
Carolina Secretary of State prior to transacting Business in the State. See G.S. 55-15-01(a) (business corporations); G.S. 55A-15-01(a) (nonprofit corporations); G.S. 57D-7-01(a) (limited liability companies); G.S. 59-902(a) (limited partnerships); G.S. 59-91(a) (registered limited liability partnerships); G.S.55B-16(a) (professional corporations). When the requirement applies, the foreign entity transacting Business in the State is responsible for obtaining a certificate of authority—not the domestic (i.e., North Carolina) corporations, public entities, or individuals with whom the foreign entity might contract.
2.1.16 Indemnity
The successful Respondent shall indemnify and hold the County, its agents, and employees harmless against any and all claims, demands, causes of action, or other liability, including attorney fees, on account of personal injuries or death or on account of property damages arising out of or relating to the work to be performed by the Successful Vendor hereunder, resulting from the negligence of or the willful act or omission of the Vendor, his agents, employees, and subcontractors.
2.1.17 Right to Reject Qualification Statements
The County reserves the right to accept and reject any and/or all statements of qualifications submitted, in whole or in part. The County reserves the right to negotiate any and all elements of the qualification statement by and with any consultants it deems suitable to carry out this project. New Hanover County has no obligation to award work based off this RFQ and reserves the right to re-advertise.
2.1.18 Iran Divestment Act Certification
N.C.G.S. 143C-6A-5(a) requires this certification for bids or contracts with the State of North Carolina, a North Carolina local government, or any other political subdivision of the State of North Carolina. The certification is required at the following times:
• When a bid is submitted
• When a contract is entered into (if the certification was not already made when the vendor made its bid)
• When a contract is renewed or assigned
N.C.G.S. 143C-6A-5(b) requires that contractors with the State, a North Carolina local government, or any other political subdivision of the State of North Carolina must not utilize any subcontractor found on the State Treasurer’s Final Divestment List.
2.1.19 Ownership of Documents
All Statements of Qualifications and accompanying documentation will become the property of New Hanover County at the time the Statements are opened and; as such, will not be returned to the Respondent.
2.1.20 Withdrawal of Statements
No Qualification Statement may be modified, withdrawn, or canceled by the Respondent for a period of ninety (90) days following the receipt of Statement. Negligence or error on the part of any Respondent in preparing their Statement confers no right of withdrawal or modification after the Statements have been opened.
2.1.21 Equal Opportunity
The non-discrimination clause contained in Section 202 (Federal) Executive Order 11246, as amended by Executive Order 11375, relative to Equal Employment Opportunity for all persons without regard to race, color, religion, sex, or national origin, and the implementing rules and regulations prescribed by the Secretary of Labor, are incorporated herein.
The Respondent agrees not to discriminate against any employees or applicant for employment because of physical or mental handicap regarding any position for which the employee or applicant is qualified. The Respondent agrees to take affirmative action to employ, advance in employment, and otherwise treat qualified disabled individuals without discrimination based upon their physical or mental handicap in all employment practices.
Under GS 143-48, New Hanover County encourages small, minority, physically handicapped, and women firms to submit Statement of Qualifications in response to this RFQ
Section 3 – Project Description
This Request for Qualifications (RFQ) is to solicit qualifications from qualified firms to provide complete design services for repurposing the existing Cape Fear Museum of History and Science, transitioning the building from a primarily public-facing building to a collections and internal operations site. This project will be completed in phases:
3.2 Project Background Information
This information is preliminary in nature and not intended to steer the project but will provide insight to the Museum’s current facilities and their anticipated needs.
3.2.1 Redesign and renovation of existing facility to provide essential spaces:
3.2.1.1 Office Space
3.2.1.2 Staff Meeting Room
3.2.1.3 Artifact Storage
3.2.1.4 Research Library
3.2.1.5 Exhibit Fabrication Shop
3.2.1.6 Print Production
3.2.1.7 Exhibit Storage
3.2.1.8 Museum Storage
3.2.1.9 Collections Workshop Room
3.2.1.10 Employee Breakroom
3.2.1.11 Other Spaces TBD
3.2.1.12 Staff Parking
3.2.2 Considerations:
3.2.2.1 Discrete climate control (temperature and humidity) per space type
3.2.2.2 Existing loading dock adjacency and access
3.2.2.3 Existing freight elevator adjacency and access
3.2.2.4 Historical facade preservation
3.2.2.5 Building Accessibility
3.1 Phase 1 – Space Needs Assessment, Concept Plan, & Budget Estimate
a) Evaluation of existing conditions
b) Working with the end users to determine the needs
c) Developing a concept plan for the project(s)
d) Developing a budget estimate for each part of the project
e) Determine an estimated timeline
The awarded firm will be approved for Phase 1 and the county will have the option to move into Phase 2 with the same firm. The final recommended total scope of work will be determined as a deliverable of Phase 1.
3.3 Phase 2 – Full and complete design services
a) Includes Architectural, Structural, Mechanical, Electrical, Plumbing, Interior design, furniture, signage, site work, utilities, construction administration, assisting with permitting with AHJs and utility providers
b) Anticipated delivery method is Construction Manager @ Risk (CM@R)
c) Includes participating in selection and working with CM@R
Section 4 – Selection Criteria and Format of Proposal
The following criteria will be used for (1) determining the short-listed candidates and (2) the selection of the firm after the interviews. If you are submitting as a joint venture, both partners are required to respond completely.
In preparing responses to this RFQ, firms should pay particular attention to identifying prior experience with comparable museum projects. Specific and relevant responses will be reviewed as more relevant than those stressing breadth of experience or general qualifications. Important considerations include the following:
Artifact and collections storage and workshop – knowledge to evaluate existing conditions and recommend space requirements, environmental needs, and storage types.
Exhibit fabrication shop – knowledge to evaluate existing conditions and recommend specialized production areas for woodworking, metalworking, and painting. Essential components may include CNC router, welding equipment, paint booths, and areas for assembly.
Print Production – knowledge to evaluate existing conditions and recommend area to house large format printer and laminator, 3D printer, and oversized graphic work tables for exhibit sized panel production.
1. Past Performance – Museum Preferred (40%)
a. List all pertinent projects designed (indicate dates) within the last 10 years. Select three of the most recent projects (Sample Projects) that design is completed and bidding is completed and provide the following information:
b. Scope Description - services provided & facility description
c. Budget – Provide estimated vs. actual (construction cost)
d. Schedule – Provide estimated vs. actual (design schedule including permitting)
e. Detail your firm’s specific role
f. Indicate the project solicitation method and what differentiated your team
g. Owner contact information
h. Reference letter from owner
2. Project Approach (35%)
a. Indicate what could have been done better on each project to improve the outcome. Describe how you’ve incorporated this improvement on latter projects
b. Describe your team’s approach to this type of project. Please give a brief outline of the steps you will take to complete this project.
c. Please indicate your firm's approach to ensuring end user involvement during design
d. What will your team need from the owner to ensure a successful project?
3. Proposed Team for this Project & Relevant Experience (15%)
a. Please provide a list of the proposed team members for this project. Please include their role in the project, license information, and experience. This should be the Team you are proposing as this projects continuous Team
b. Please indicate the office location for each proposed team member.
c. Please indicate if the proposed team worked on the Sample projects listed above.
4. Selection Committee Interview Rating (10%)
a. Our Selection Committee will make an assessment of the finalists’ interviews as an integral part of final scoring
*Please see the attached score sheet showing the selection criteria point breakdown
New Hanover County Contract # 26-0312
Section 5 – Selection Process
Selection Phase 1: Each firm initially will be evaluated based upon information provided in the Selection Criteria listed above. From such review, firms receiving the highest ranking will be the firms chosen to participate in Phase 2, the second phase of the selection process. The County reserves the right to reject any and all statements of qualifications as well as reserve the right to waive any irregularities in the statements of qualifications.
Selection Phase 2: The firms chosen for Phase 2 of the selection process may be required to make a presentation.
Firms will be notified if presentations are required and given the dates and times reserved for the presentations. The County reserves the right to establish additional rules and procedures for the presentations and for the interview process.
Final Selection: The County will negotiate a contract with the top-rated firm as selected by the County. If a contract cannot be successfully negotiated with the top-rated firm, the County will proceed to the second-rated firm. The County reserves the right to reject any and all statements of qualifications.
New Hanover County Contract # 26-0312
Section 6 – Included Exhibits/Appendix (provided by NHC)
A. Existing Building As-Builts B. Existing Site Plan
REQUEST FOR QUALIFICATIONS
DESIGN Cape Fear Museum Repurpose
RFQ-26-0312
EVALUATION OF FIRMS
A B C D E F G I N Q
FI
RM
S
N A
M E
Pa st e Pe rf or m an ce
Li st a ll pe rt in en t p ro je ct s de si gn ed w ith in p as t 1 ye ar s (0 to
Pa st
P er fo rm an ce
D et ai l t he
S co pe o f th re e re la te d
Sa m pl e
Pr oj ec ts to
Pa st
P er fo rm an ce
D et ai l t he
B ud ge t &
S ch ed ul es
Ex pl ai n
P ro je ct ed v s.
A ct ua ls
(0 to
Pa st
P er fo rm an ce
D et ai l y ou r f ir m s sp ec ifi c ro le o n th e pr oj ec t.
to
0%
Pa st
P er fo rm an ce
W ha t w as th e so lic ita tio n m et ho d fo r t he se th re e pr oj ec ts
(R
FP
/R
FB
/R
FQ
W ha t di ff er en tia te d yo ur te am
(0 to
Pa st
P er fo rm an ce
Sa m pl e Pr oj ec ts
O w ne r
Re fe re nc e Le tt er s (0 to
0%
Pr oj ec t A pp ro ac h
- W ha t c ou ld h av e be en d on e be tt er o n ea ch o f y ou r 3 s am pl e p ro je ct s.
H ow h av e yo u im pl em en te d th is im pr ov em en t?
to
0%
Pr oj ec t A pp ro ac h
- s te ps to c om pl et e th is p ro je ct (0 to
0%
Pr oj ec t A pp ro ac h ho w d o yo u en su re e nd u se r in vo lv em en t ( to
Pr oj ec t A pp ro ac h
- w ha t w ill y ou n ee d fr om th e ow ne r ( to
0%
Pr op os ed
T ea m
R ol es a nd E xp er ie nc e (0 to
0%
Pr op os ed
T ea m
O ff ic e lo c.
d id th ey w or k on th e sa m pl e pr oj ec ts (0 to
Se le ct io n Co m m itt ee
In te rv ie w R at in g (0 to
0%
TO
TA
L
12 Evaluator's Name:
Date:
New Hanover County Contract # 26-0312 DRAFT
Acct. # TBD Req. # TBD
STATE OF NORTH CAROLINA
AGREEMENT
NEW HANOVER COUNTY
THIS CONTRACT made and entered into this _____ day of
____________________ 2026 by and between NEW HANOVER COUNTY, a political subdivision of the State of North Carolina, hereinafter referred to as "County"; and ____, a ________________________, hereinafter referred to as "Contractor."
W I T N E S S E T H:
That the Contractor, for the consideration hereinafter fully set out, hereby agrees with the County as follows:
1. Scope of Services. Contractor shall provide all labor, equipment and materials to complete design services for repurposing the existing Cape Fear Museum, as more specifically described in Exhibit A, attached hereto, and incorporated herein by reference.
2. Time of Performance. The term of this Agreement shall begin from receipt of Notice to Proceed, and all work shall be completed within twelve (12) months of said Notice.
3. Payment. County hereby agrees to pay for the cost of this Contract not to exceed a sum of $_________. Payment is contingent upon a final County inspection and acceptance of work or services.
4. Extra Work. County and Contractor shall negotiate and agree upon the value of any extra work or services prior to the issuance of a County Change Order or Renewal/Amendment (CRA) form covering said extra work or services. Such Change
Order or CRA shall set forth the corresponding adjustment, if any, to the Contract Price and Contract Time.
5. Indemnity. Contractor shall indemnify and hold County, its officers, officials, agents, and employees, harmless against any and all claims, demands, causes of action, or other liability, including attorney fees, for any property damages, personal injuries or death arising out of, relating to, or resulting from the negligence, willful act, or omission of Contractor, its agents, employees and subcontractors in the performance of work or services.
6. Insurance. Before commencing any work or services, Contractor shall procure insurance in Contractor’s name and maintain all insurance policies for the duration of the Contract of the types and in the amounts listed in this Contract. The insurance shall provide coverage against claims for injuries to persons or damages to property which may arise from operations or in connection with the performance of the work hereunder by Contractor, its agents, representatives, employees, or subcontractors, whether such operations by itself or anyone directly or indirectly employed by it.
7. Minimum Scope and Limits of Insurance
7.1. Professional Liability Insurance
7.1.1 Contractor shall maintain in force for the duration of
this Contract Contractor liability or errors and omissions liability insurance appropriate to Contractor’s profession. Coverage as required in this paragraph shall apply to liability for a Contractor error, act, or omission arising out of the scope of Contractor’s services as defined in this Contract. Coverage shall be written subject to limits of not less than
$1,000,000 per loss.
7.1.2 If coverage in this Contract is on a claims-made basis, Contractor warrants that any retroactive date applicable to coverage under the policy precedes the effective date of this Contract, and that continuous coverage will be maintained, or an extended discovery period will be exercised for a period of two (2) years beginning from the time that work or services under the Contract is complete.
7.2. Deductibles and Self-Insured Retentions
7.2.1. Any deductibles or self-insured retentions must be
declared to and approved by County. At the option of County, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects County, its officers, officials, agents, or employees; Contractor shall procure a bond guaranteeing payment of deductibles or self-insured retentions.
7.2.2. Contractor shall be solely responsible for the payment of all deductibles to which all policies are subject, regardless of whether County is an insured under the policy.
7.3. Miscellaneous Insurance Provisions.
7.3.1. Any failure to comply with reporting provisions of the policies listed in this Contract shall not affect coverage provided to County, its officers, officials, agents, and employees.
7.3.2. Each insurance policy required by this Contract shall
be endorsed to state that coverage shall not be canceled by either party except after thirty
(30) days prior written notice has been given to County, 230 Government Center Drive, Ste. #125, Wilmington, NC 28403.
7.3.3. If Contractor’s liability policies do not contain the
standard ISO separation of insureds provision, or a substantially similar clause, they shall be endorsed to provide cross-liability coverage.
7.4. Acceptability of Insurers. Insurance is to be placed with insurers licensed to do business in the State of North Carolina with an A.M. Best’s rating of no less than A VII unless County has granted a specific exemption.
7.5. Evidence of Insurance
7.5.1. Contractor shall furnish County with a certificate(s) of insurance, executed by a duly authorized representative of each insurer, showing compliance with the insurance requirements prior to commencing the work or services, and thereafter upon renewal or replacement of each certified coverage until all operations under this Contract are deemed complete.
7.5.2. Evidence of additional insured status shall be noted on the certificate of insurance as per requirements in this Contract.
7.5.3. With respect to insurance maintained after final
payment in compliance with requirements, an additional certificate(s) evidencing such coverage shall be provided to County with final application for payment and thereafter upon renewal or replacement of such insurance until the expiration of the period for which such insurance must be maintained.
7.6. Subcontractors. Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated herein. CGL coverage shall include independent contractors’ coverage, and Contractor shall be responsible for assuring that all subcontractors are properly insured.
7.7. Conditions
7.7.1. County may, at its discretion and with approval of Risk
Management and the Finance Department, accept letters of credit or custodial accounts in lieu of specific insurance requirements.
7.7.2. Contractor shall warrant the insurance contributing to the satisfaction of insurance requirements in this Contract shall not be canceled, terminated, or modified by Contractor without prior written approval of County.
7.7.3. Contractor shall promptly notify New Hanover County
Facilities Management and New Hanover County Risk Management at (910) 798-7497 of any accidents arising in the course of operations under the Contract causing bodily injury or property damage.
7.7.4. County reserves the right to obtain complete, certified copies of all required insurance policies.
7.7.5. Failure of County to demand a certificate of insurance or other evidence of full compliance with these insurance requirements or failure of
County to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor’s obligation to maintain such insurance.
7.7.6. County does not represent that coverage and limits will be adequate to protect Contractor and such coverage and limits shall not be deemed as a limitation of Contractor’s liability under the indemnities granted to County in this
Contract.
7.7.7. If Contractor fails to maintain the insurance as set forth herein, County shall have the right to purchase said insurance at Contractor’s expense.
Contractor agrees to reimburse County for all expenses incurred for such purchase.
7.7.8. Contractor or its agent may apply to County for approval of higher deductibles based on financial capacity and quality of the carrier affording coverage.
7.7.9. County shall have the right to prohibit Contractor or any subcontractor from performing work or services and may withhold payment until required certificates has been received and approved by County.
8. Independent Contractor. The parties mutually agree that the
Contractor is an independent contractor and not an agent of the County, and as such, the
Contractor shall not be entitled to any County employment benefits, such as, but not limited to, vacation, sick leave, insurance, workmen's compensation, or pension and retirement benefits.
9. Default and Termination. If Contractor fails to prosecute the work or services with such diligence as will insure its completion within the Contract time, or if
Contractor breaches any of the terms or conditions contained in this Contract and fails to cure said breach within two (2) days of County's mailing of Notice of Default, or otherwise fails to perform the work or services hereunder to the County’s reasonable satisfaction, County may terminate this Contract forthwith. Upon termination, County may, without prejudice to an action for damages or any other remedy, take the prosecution of the work or services out of the hands of Contractor. County may enter into another Contract for the completion of the Contract or use such other methods as may be required for the completion of the Contract. County may deduct all costs of completing the Contract from any monies due or which may become due to Contractor. In the event this Contract is terminated prior to completion of the services by the Contractor, the Contractor shall be paid for work or services performed to the date of termination. In no event will the amount due Contractor in the event of termination exceed that amount set forth in this Contract.
Nothing contained herein shall prevent the County from pursuing any other remedy, which it may have against Contractor, including claims for damages.
10. Termination for Convenience. County may terminate this Contract for convenience at any time and without cause. Upon receipt of notice, Contractor shall immediately discontinue providing the work or service and, if applicable, the placing any orders for any materials, facilities, and supplies in connection with the performance of the work or services of this Contract.
11. Non-appropriation. All funds for payment by County under this
Contract are subject to the availability of an annual appropriation of the New Hanover
County Board of Commissioners for the services provided under the Contract, County will terminate the Contract, without termination charge or liability, on the last day of the then-current fiscal year or when the appropriation made for then-current year for the services/items covered by this Contract is spent, whichever occurs first. If at any time funds are not appropriated for the continuance of this Contract, cancellation shall be accepted by the Contractor on ten (10) business days’ prior written notice, but failure to give such notice shall be of no effect and County shall not be obligated under this Contract beyond the date of termination.
12. Non-waiver of Rights. The parties mutually agree that either party's failure to insist upon the strict performance of any provision of this Contract or to exercise any right based upon a breach thereof, or the acceptance of any performance during such breach, shall not constitute a waiver of any rights under this Contract.
13. Conflict of Interest. No paid employee of the County shall have a personal or financial interest, direct or indirect, as a contracting party or otherwise, in the performance of this Contract.
14. Subcontracts. The Contractor shall utilize no subcontractors for performing the work or services to be performed under this Contract without the prior written approval of the County.
15. Entire Contract. This Contract constitutes the entire understanding of the parties.
16. Binding Effect. This Contract shall be binding upon the parties hereto, and their heirs, successors, executors, administrators, and assigns.
17. Severability. If any provision of this Contract is held unenforceable, all remaining provisions of this Contract shall remain in full force and effect.
18. Inclusive Terms. Use of the masculine herein shall include the feminine and neuter, and the singular shall include the plural.
19. Governing Law. All of the terms and conditions contained herein shall be interpreted in accordance with the laws of the State of North Carolina.
20. E-Verify Compliance. Pursuant to N.C.G.S. 143-133.3, Contractor shall fully comply with the U.S. Department of Homeland Security employee legal status
E-Verify requirements for itself and all its subcontractors. Violation of the provision, unless timely cured, shall constitute a breach of Contract.
21. Iran Divestment Act Certification. Pursuant to N.C.G.S. 147-86.55, Contractor shall fully comply with the North Carolina State Treasurer requirement that the
Contractor or any of its subcontractors are not listed on the Final Divestment List created by the State Treasurer. Violation of the provision, unless timely cured, shall constitute a breach of Contract.
22. Compliance with Federal Law. If applicable, all federally funded projects, loans, grants, and sub grants whether funded in part or wholly, must be procured in a manner that conforms with all applicable Federal laws, policies, and standards, including those under the Uniform Guidance (2 C.F.R. Part 200).
23. Notices. All notices required hereunder to be sent to either party shall be sent to the following designated addresses, or to such other address or addresses as may hereafter be designated by either party by mailing of written notice of such change of address, by Certified Mail, Return Receipt Requested:
To County:
New Hanover County Facilities Management Attn: David King 200 Division Drive Wilmington, NC 28401
To Contractor:
24. Assignability. The parties hereto agree that this Contract is not transferable and shall not be assigned by either party without the written consent of the other party to this Contract.
25. Contract Under Seal. The parties hereto expressly agree to create a
Contract under seal.
IN WITNESS WHEREOF, the parties have hereunto affixed their hands and seals, the day and year first above written and by authority duly given.
CONTRACTOR
________________________________ (Seal) President
ATTEST:
Secretary
STATE OF ______________
_________________COUNTY
I, ____________________________, a Notary Public of the State and County aforesaid, certify that _______________________ came before me this day and acknowledged that (s)he is President of ____________________, a_______________________, and that by authority duly given and as the act of the corporation, the foregoing instrument was signed and sealed in its name by its President.
WITNESS my hand and official seal, this ____ day of ___________________, 2026.
Notary Public
My commission expires: ________________
[REST OF PAGE INTENTIONALLY BLANK.
NEW HANOVER COUNTY DIGITAL SIGNATURE PAGE FOLLOWS EXHIBIT A AND IS
INCORPORATED HEREIN BY REFERENCE]
File details come from the government source that posted it. Updated .