This document is a set of technical specifications for Solicitation Number 00706-001-14-AS-1 issued by the City of Springfield Public Works Department. The specifications outline the requirements for the construction of a new 5-mile sewer line and lift station project. Key details include:
The project will install approximately 26,000 linear feet of 24-inch reinforced concrete sewer pipe and construct a new lift station facility. Bids are due by October 15, 2022 at 2:00 PM local time. A mandatory pre-bid conference will be held on September 30, 2022. The contract is expected to be awarded by November 30, 2022, with construction to be completed within 18 months of the notice to proceed. The initial contract term is 3 years, with two 1-year renewal options.
The specifications provide detailed technical requirements for pipe materials, fittings, valves, lift station equipment, electrical systems, and other components. Pricing is to be provided as lump sum and unit prices. The project is funded through a combination of state and local sources, with a total budget of $12.5 million. Small and minority-owned business participation goals have been established for the contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .