003 - DBA - Wage Determination.pdf
PDF 2 MB Posted
- Attached to
- Rec Camp Sidewalk Repair - Goodfellow AFB
- Solicitation number
- FA303025Q0037
About this file
This document is a Wage Determination for Heavy and Highway Construction Projects in Texas, issued by the U.S. Department of Labor on 01/03/2025. It covers Armstrong, Carson, Crosby, Ector, Irion, Lubbock, Midland, Potter, Randall, Taylor, and Tom Green Counties, and provides detailed wage rates for various construction job classifications effective 01/03/2025.
The wage determination specifies different minimum wage rates based on contract timing and Executive Order applicability. For contracts entered into after January 30, 2022, workers must be paid at least $17.75 per hour under Executive Order 14026. For contracts awarded between January 1, 2015 and January 29, 2022, the minimum wage is $13.30 per hour under Executive Order 13658. The document includes comprehensive wage rates for numerous job classifications such as Cement Mason/Concrete Finisher, Electrician, Laborers, Power Equipment Operators, Truck Drivers, and Welders, with most rates ranging between $10.30 and $20.96 per hour. Additional provisions include paid sick leave requirements and instructions for wage determination appeals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 001 - Solicitation - FA303025Q0037.pdf | ||
| 002 - ABV SOW - Rec Camp Sidewalk.pdf | ||
| 004- Rec Camp Work Area.pdf | ||
| 005 - Rec Camp Concrete Route.pdf | ||
| 006 - Layout1.pdf | ||
| 007 - Layout2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .