002_140802-25-0720_Statement_of_Work.pdf
PDF 548 KB Posted
- Attached to
- RA-2 Turbo and Exhaust Repairs
- Solicitation number
- 1333MK25Q0153
About this file
This Statement of Work (SOW) details turbo and exhaust repair requirements for a NOAA Marine Engineering small boat, specifically the HRN 2701 (RA-2), a 27-foot North River Boat manufactured in 2014. The boat requires comprehensive repair of its exhaust system and twin turbochargers due to severe corrosion, with work to be performed at Schooner Creek Boat Works in Portland, Oregon. The requested performance period is from September 15, 2025, to October 31, 2025, with specific tasks including removing the existing exhaust system and turbo assemblies, procuring and installing replacement parts, replacing necessary fluids, and conducting a sea trial to confirm full boat operation.
The SOW outlines detailed requirements for the repair contractor, including protective coverings, interference and restoration protocols, gasket replacements, fluid disposal procedures, and post-repair testing. The contractor must provide appropriate parts, notify the contracting officer of any procurement issues, and submit estimates and timelines for any additional or corrective work. Key contacts include LCDR Ben Kaiser as the main point of contact, with secondary technical support from Paul Siebert. The repair will follow NOAA Small Boat Standards and Procedures Manual, ABYC Standards, and Yanmar Marine Propulsion Engine specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HRN 2701 Turbo and Exhaust Repair 06 August 2025
NOAA Marine Engineering
Small Boat HRN 2701 (RA-2) Turbo and Exhaust Repairs
140802-25-0720
STATEMENT OF WORK
1. BACKGROUND:
NOAA’s research and survey ships comprise the largest fleet of federal research ships in the nation. Ranging from large oceanographic research vessels capable of exploring the world's deepest oceans to smaller ships responsible for charting the shallow bays and inlets of the United States, the fleet supports a wide range of marine activities, including fisheries research, nautical charting, and ocean and climate studies. In addition to its ships, the NOAA Small Boat Program manages a fleet of more than 400 small boats that perform various data collection missions for NOAA throughout the United States and its territories, including hydrographic surveys, fishing, diving, scientific instrument deployment/recovery, water and air quality monitoring, law enforcement, and marine mammal surveys. Vessels vary in size from a simple 10-ft. kayak to a complex 85-ft.
research vessel. The majority of small boats fall within the range of 16-26 feet in length and operate in near-shore environments, but extended missions in deep water environments are common among the larger vessels.
2. SCOPE
2.1.This specification contains the general requirements for work performed by the Small
Boats Repair Contractor (Contractor) for one of the Office of Marine and Aviation Operations (OMAO) small boats. These general requirements apply to all work items contained in this work package, including but not limited to the service that is listed.
2.2.There is one (1) small boat covered under this Scope of Work, with the following particulars:
2.2.1. 2701, a.k.a. RA-2 – 27 foot North River Boat foam collared survey boat, manufactured in 2014, 7500 lb Displacement, Hull Number NRB25120B313, Aluminum Hull, Yanmar 350 HP 8LV350c engine, S/N# 862, Hamilton Jet Drive J241.
2.3.During initial repairs and inspection, the boat was discovered to have a heavily corroded exhaust, leading to leaks. The degree of the corrosion has led to the twin turbocharger no longer being able to connect to any piping or hoses, and both the exhaust and turbo assemblies need to be replaced for continued operation.
3. Period Of Performance
3.1. Requested start date of 09/15/2025 with completion of work no later than
10/31/2025.
4. Place Of Performance
4.1.The boat is currently at Schooner Creek Boat Works undergoing repairs and inspections.
4.1.1.Schooner Creek Boat Works 3255 N Hayden Island Drive Portland, OR 97217
4.1.2.The boat is currently hauled out on its trailer with its trailer.
4.2.The boat is able to be transported to the vendors work location should that facilitate on time completion of the work package.
5. Point Of Contact and Vessel Representative
5.1. Main Point of Contact:
5.1.1.LCDR Ben Kaiser, Email: sbengineer.mo@noaa.gov, Phone: 240-705-5133
5.2.For Vessel and Facility Access:
5.2.1.LCDR Ben Kaiser, Email: sbengineer.mo@noaa.gov, Phone: 240-705-5133
5.3. Secondary Contacts:
5.3.1.Technical Items: Paul Siebert, Email: paul.siebert@noaa.gov , Phone: 541-
272-9561 5.3.2.Schooner Creek Access and Coordination: Ron Bergmann, Email:
ronb@schoonercreek.com, Phone: 503-735-0569
6. REFERENCES
6.1.American Boat and Yacht Council (ABYC) Standards and Technical Information
Reports for Small Craft 6.2.NOAA Small Boat Standards and Procedures Manual, 4.2 Edition, January 05, 2024.
6.2.1.OMAO Supplement to the NOAA Small Boat Standards and Procedures Manual, Version 2.0, June 2018.
6.3.Yanmar Marine Propulsion Engine 8LV350, Code 0A8LV-G00101, Apr. 2011.
7. REQUIREMENTS
7.1.Following completion of work and prior to acceptance, all work areas shall be restored to the same condition of cleanliness and serviceability as they were upon the boat's arrival.
7.2.NOAA employees and contractors may be working on board the vessel during the contract performance period. During this period, it will be required to coordinate work with the ship’s small boat team.
7.3.Protective Coverings 7.3.1.Utilize foreign material exclusion barriers (FMEs) or protective coverings to protect all compartments, machinery, equipment, deck coverings, furnishings, insulation, glass, cables, piping systems, coatings, structures, and other vessel components from damage and from entry of dust, dirt, grit, sand, and other foreign particles.
7.3.2.All damage and contamination resulting from failure to provide adequate protection shall be repaired and cleaned by the Contractor at the Contractor’s expense to re-establish the condition that existed at the start of the work.
7.3.3.After completion of all other work, remove and dispose of all protective coverings, along with any adhesive residue used to hold coverings in place.
mailto:sbengineer.mo@noaa.gov mailto:sbengineer.mo@noaa.gov mailto:paul.siebert@noaa.gov mailto:ronb@schoonercreek.com
7.4.Interferences and Restorations
7.4.1.Remove all interferences and obstructions necessary to complete the required work. This shall include the disassembly and removal of machinery, piping, ducts, cable, wiring, insulation, structures, and anything else that interferes with the proper accomplishment of work. Except as otherwise specified, this does not include relocations made necessary by new installations that physically prevent interference from being returned to its existing location.
7.4.2.Restore all interferences to their existing configuration and condition. Install new gaskets and fasteners. In place of material that is rendered unsuitable for reinstallation during removal or storage, provide and install new materials that are equal in composition, strength, design, type, and size as they existed prior to removal. All insulation removed or damaged shall be replaced with new insulation.
7.4.3.Align and conduct strength, tightness, and operational tests to ensure that the reinstalled interferences safely perform their normal functions.
7.4.4.The Contractor shall be responsible for identifying all interferences involved in accomplishing required work. Interferences are not normally identified in the detailed specifications of the work item.
7.5.Gaskets, Packing, and Seals - Whenever the Contractor performs work that disturbs existing gaskets, packing, or seals, new gaskets, packing, and seals of same material as existing ones shall be installed unless otherwise specified.
7.6.Departure Trials and Testing - Upon completion of work, all systems that were worked on shall be tested per manufacturer’s recommendation and to demonstrate satisfactory system performance in normal operating conditions. Timeline for completion of this testing will vary based upon when the vessel will next be in the water and operators will be available.
7.7.Disposal of Fluids - Whenever work requires that equipment, machinery, piping, or tanks be drained of fluids, the Contractor shall be responsible for draining and proper disposal of the fluid in accordance with local, state, and federal regulations. If the Contractor drains the fluid into the boat's bilges, the Contractor shall pump all fluid from the applicable bilges into tanks and properly dispose of the fluid, including the fluid that existed prior to and the fluid that accumulates between the time the equipment, machinery, piping, or tanks were drained and the time the bilges have been pumped dry by the Contractor. The cost of this should be included in the specific work items. A written record shall be provided to a NOAA representative at the completion of the contract, documenting the quantity and type of fluids disposed of and receiving authority (i.e., the company that took possession of the fluids).
8. GOVERNMENT FURNISHED MATERIAL
As specified in specific tasks.
9. SECURITY REQUIREMENTS
The Vendor shall have appropriate identification to get onto a government facility.
Identification must be state or federally issued (ex. State ID = Driver’s License or ID Card ex. Federal = Passport, CAC or TWIC card). An escort from the facility may be required for personnel without a CAC or TWIC.
10. NOTES
Any additional work identified or changes to the scope of approved work are to be documented with estimates of additional cost and timeline for completion and submitted to the contracting officer for review.
11. Work Items
11.1.Vendor shall provide the appropriate parts for listed service items. If there are issues procuring the necessary items, the vendor shall notify the contracting officer.
11.2.Repairs to HRN 2710
11.2.1.Remove existing exhaust system and turbos on boat’s engine
11.2.2.Procure the necessary replacement turbo assemblies, hoses, and pipes.
11.2.3.Install the replacement turbo assemblies, hose, pipes for the exhaust system.
11.2.4.Replace any fluids drained or used during the reinstallation process.
11.3.Sea Trial
11.3.1.Complete an underway test of the boat and confirm full operation of the boat following compilation of all other work items
11.3.2.Run engine and propulsion through incremental speed adjustments to ensure full item operation.
11.3.3.Confirm that all previous work items are satisfactory in an operational setting. If previous work items are noted to be unsatisfactory, correct any issues.
12. Growth or Corrective Actions
12.1.Any additional items or corrective actions that are determined to be necessary by the vendor will be forwarded to the contracting officer for approval before any additional work is performed.
12.2.All additional work items or corrective actions will have a cost estimate for parts and labor required, as well as a timeframe for completion.
| 1. BACKGROUND: |
| 2. SCOPE |
| 2.1. This specification contains the general requirements for work performed by the Small Boats Repair Contractor (Contractor) for one of the Office of Marine and Aviation Operations (OMAO) small boats. These general requirements apply to all work ite... |
| 6. REFERENCES |
| 7. REQUIREMENTS |
| 8. GOVERNMENT FURNISHED MATERIAL |
| As specified in specific tasks. |
| 10. NOTES |
| 11. Work Items |