This Invitation to Bid document from the City of Oxford, Georgia describes a water and electric meter replacement project managed by Carter & Sloope, Inc. The scope of work includes removing and replacing approximately 770 water meters (3/4", 1", and 2" sizes) with AMI transmitters, installing approximately 200 additional AMI transmitters on existing water meters, installing approximately 705 3/4" backflow preventers, replacing meter boxes, lids, and curb stops as needed, and removing and replacing approximately 750 electrical meters. The project also requires documentation of service line material, site restoration, data collection, communication with property owners, and installation of all necessary appurtenances. Sealed bids must be submitted electronically through QuestCDN.com by July 8, 2026 at 2:00 PM local time, with the base cost of all bids to be posted within approximately 30 minutes after closing. The contract completion timeline is 210 consecutive calendar days, and bids may not be withdrawn for 60 days after the closing time. Digital specifications and contract documents are available at www.cartersloope.com/outforbid, with a $50.00 download fee and an additional $42.00 bid submittal fee required.
Bidders must be licensed utility contractors in Georgia with a designated Utility Manager certification holder overseeing the work. Bid bonds or certified cashier's checks equal to 10% of the base bid are required, with performance and payment bonds of 100% of the contract price required upon award. All surety companies must be Georgia-licensed with an "A" minimum rating and financial strength of at least five times the contract price. The project is funded entirely by local City of Oxford funds, with no wage rate documentation, AIS, or BABA requirements. All necessary easements and rights-of-way will be obtained by the Owner prior to issuing the Notice to Proceed. Bidders must complete the Qualifications of Bidder section and submit an affidavit of compliance with Georgia's Security and Immigration Compliance Act (O.C.G.A. 13-10-91) confirming E-Verify participation. The Owner reserves the right to reject any or all bids and reserves evaluation of bidder qualifications and financial ability.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 00100-1
INVITATION TO BID
City of Oxford C&S Project No: O9800.008
Water and Electric Meter Replacement June 2026
Revision 0
PART 1. GENERAL
1.1 COMPETITIVE COST SEALED BIDS
Sealed bids for construction of the Water and Electric Meter Replacement will be received until the closing time of July 8, 2026 at 2:00 PM local time. Bids must be submitted by the
Bidder electronically through QuestCDN.com. No paper submissions will be accepted. Any bid received after the bid closing time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically provided in the Instructions to Bidders and/or by State law. Base
Cost of all Bids will be posted by the Owner/Engineer to the QuestCDN website within approximately 30 minutes after the bid closing time.
1.2 SCOPE OF WORK
The Work shall consist of providing all labor, equipment, and materials necessary to remove and replace approximately 770 3/4", 1", and 2" water meters and AMI transmitters, install approximately 200 AMI transmitters (MOU's) on existing water meters, install approximately
705 3/4" backflow preventers, replace meter boxes, lids, and curb stops as necessary, remove and replace approximately 750 electrical meters, and document service line material, including site restoration, data collection, communication with property owners, and all appurtenances necessary for a complete installation. Water meters, electric meters, and AMI transmitters will be provided by the Owner. Time allotted for completion of work is 210 consecutive calendar days.
1.3 PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS
Complete digital specifications and contract documents are available at www.cartersloope.com/outforbid. Bidders may also view the digital plan documents for free by creating a Quest account and entering the Quest project number 9506968 on the website’s project search page. Bidders can download the digital documents for a fee of
$50.00 payable through the website. Bids must be submitted electronically at
QuestCDN.com. There will be an additional $42.00 bid submittal fee. Please contact
QuestCDN customer support at 952-233-1632 or info@questcdn.com for assistance in membership registration, downloading, and working with digital project information. All other questions may be directed to the issuing office, Carter & Sloope, Inc., Watkinsville, GA, 706-769-4119.
1.4 CONTRACTOR QUALIFICATIONS
Bidders must complete the Qualifications of Bidder (Section 00470) in order to be evaluated for award of the Contract. Refer to the specific requirements outlined in the referenced Section.
SECTION 00100-2
City of Oxford C&S Project No: O9800.008
Water and Electric Meter Replacement June 2026
1.5 CONTRACTOR LICENSE
The Scope of Work as described herein is defined as “utility contracting” in accordance with
O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a “Utility Contractor” and must also employ a “Utility
Manager” certification holder who will have oversight of all the utility work. See Instruction to Bidders for additional bidding requirements.
1.6 BONDS
Bids shall be accompanied by a bid bond or certified cashier’s check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an “A” minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of “Best’s Key Rating Guide Property
Liability”. Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a “Power of Attorney” authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond.
1.7 PERMITS
The status of Federal, State, and /or Local permits for this project are as follows:
PERMITS/AGENCIES STATUS
A. Land Disturbance Permit N/A
B. NPDES GAR 100002 (Stormwater) N/A
C. GA Environmental Protection Division - Water N/A
D. GA Environmental Protection Division - Sewer N/A
E. GA Department of Transportation N/A
F. Building Permit N/A
1.8 EASEMENTS AND RIGHTS-OF-WAY
All easements and rights-of-way for permanent installations have been obtained or will be obtained by the Owner prior to issuing the Notice to Proceed.
1.9 GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT
All qualifying Contractors and Subcontractors performing work with the City of Oxford must register and participate in the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, to verify the work eligibility information of new employees. In order for a Bid to be considered, it is mandatory that the Bidder’s Affidavit of Compliance with O.C.G.A. §13-10-91 be completed and submitted with the Bid.
SECTION 00100-3
City of Oxford C&S Project No: O9800.008
Water and Electric Meter Replacement June 2026
1.10 FUNDING SOURCES
Funding is to be provided by local funds. No wage rates, payroll, AIS, or BABA documentation is required.
1.11 RESERVATION OF RIGHTS
Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.
1.12 PROJECT DOCUMENTATION
Owner will provide Excel spreadsheets containing water and electric meter data and addresses to registered Plan Holders on Quest upon request.