00100 _ Invitation to Bid _ BB Pump Station.pdf

PDF 193 KB Posted

Attached to
BID 2025-32 BEAR BRANCH PUMP STATION UPGRADES PHASE II
Solicitation number
PE-66243-NONST-2025-000000066
Issued by
Henry County, Georgia

About this file

The document is an Invitation to Bid for the City of Perry's Bear Branch Pump Station Upgrades Phase II project (Bid Number 2025-32), scheduled for bid submission until May 14, 2025, at 10:15 a.m. The project involves comprehensive pump station improvements, including cleaning and relining two existing wet wells, removing the existing packaged pump station, installing a new suction lift pump station with associated piping, electrical and instrumentation upgrades, connecting to existing force main, installing a generator for backup power, and adding a new 4-inch water service line with a water meter and backflow prevention device. The total project timeline is 120 consecutive calendar days, with a non-mandatory pre-bid meeting set for April 30, 2025, at Perry City Hall.

Bidders are required to submit a bid bond or certified cashier's check for 10% of the base bid and must possess a valid Georgia Utility Contractor License. The contract documents can be obtained for a non-refundable fee of $200 from GWES, LLC, the project management firm. Additional requirements include providing E-Verify documentation with the bid and coordinating work with the City of Perry and other utility owners. The Owner reserves the right to reject any or all bids and to waive informalities. Surety companies must be licensed in Georgia, listed in the U.S. Treasury Circular 570, with an "A" minimum rating and financial strength at least five times the contract price.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF PERRY

BEAR BRANCH PUMP STATION UPGRADES PHASE II

APRIL 2025 033.69.1.23 00100 - 1

SECTION 00100

INVITATION TO BID

PART 1: GENERAL

1.1 Competitive Cost Sealed Bids

Separate sealed Bids for construction of Bear Branch Pump Station Upgrades Phase II for the

City of Perry (Bid Number 2025-32) will be received until May 14, 2025 at 10:15a.m. in Perry

City Hall, 1211 Washington Street, Perry, GA 31069. Bids will then be publicly opened and read aloud at said office. Any bid received after May 14, 2025 at 10:15a.m. will not be considered by the Owner. Following the closing time for the receipt of bids no bid may be withdrawn for a period of sixty (60) days.

1.2 Scope of Work

The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following:

Cleaning and relining of the two (2) existing wet wells. Removal of existing packaged pump station. Installation of new packaged suction lift pump station, suction and discharge piping, and associated electrical and instrumentation and controls improvements. Connect discharge piping to existing force main. Remove and replace emergency bypass connection. Install generator to provide backup power to the pump station. Install new 4-inch water service line. Connect to existing water service line. Install a water meter, backflow prevention device, and yard hydrant.

Remove and replace chain link fencing as necessary for construction. The time allotted for final completion of work is 120 consecutive calendar days.

Contractor will be required to coordinate all work with the City of Perry and other utility owners who have facilities within the project corridor. The project will be managed by GWES, LLC. located at

733 Carroll Street, Perry, GA 31069, telephone number (478) 235-0307.

All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract.

1.3 Plans, Specifications and Contract Documents

The Instructions to Bidders, Bid Forms, Contract Agreement, Drawings, Specifications and forms of Bid Bond, Performance Bond, Payment Bond, and other Contract Documents may be obtained upon payment (non-refundable) of $200 from:

GWES, LLC.

733 Carroll Street

Perry, GA 31069

(478) 235-0307

1.4 Contractor License

The Bidder shall affix to the outside of its Bid envelope, its Georgia Utility Contractor License

Number, not the license number of a Utility manager or a subcontractor’s Georgia Utility

CITY OF PERRY

BEAR BRANCH PUMP STATION UPGRADES PHASE II

APRIL 2025 033.69.1.23 00100 - 2

Contractor License Number. No bid will be opened unless the Contractor’s Utility License

Number is affixed to the envelope.

1.5 Bonds

Each Bid must be accompanied by a Bid Bond or certified cashier’s check, in the amount of 10% of the base bid, prepared on the form of Bid Bond, section 00410, attached to the Contract

Documents or a Surety Company’s Standard Bid Bond, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570 with an “A” minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of “Best’s Key Rating Guide Property Liability”. Each Bond shall be accompanied by a “Power of Attorney” empowering the attorney-in-fact to bind the surety and certified to include the date of the bond.

1.6 Pre-Bid Meeting

A non-mandatory pre-bid meeting will be held April 30, 2025 at 10:00a.m. in Perry City Hall, 1211 Washington Street, Perry, Georgia 31069.

1.7 Permits

Contractor will acquire all necessary Federal, State and local permits preceding the issuance of the Notice to Proceed.

1.8 Easements & Rights-of-Way

Owner has or will acquire all necessary easements and rights-of-way for permanent installations preceding the issuance of the Notice to Proceed.

1.9 Reservation of Rights

The Owner reserves the right to reject any or all Bids, to waive informalities and to re-advertise.

2.0 Contractor E-Verify

Contractor shall supply E-Verify documentation with the bid to be deemed responsive.

END OF SECTION 00100

File details come from the government source that posted it. Updated .