00100_Advertisement to Bid_2024 Sylvania Stre.pdf
PDF 347 KB Posted
- Attached to
- 2024 Sylvania Streets CDBG (PE25162)
- Solicitation number
- PE-66397-NONST-2026-000000015
- Issued by
- Talbot County, Georgia
About this file
This document is an Advertisement for Bids for the City of Sylvania's 2024 Sylvania Streets CDBG project, prepared by Parker Engineering, Inc. The project involves street improvements covering approximately 1.30 miles in the City of Sylvania, including milling, tack coat, asphalt leveling, striping, thermoplastic stop bars, and traffic control. Sealed bids will be received until November 5th, 2025, at 3:00 PM at the Sylvania City Hall, with a time allotted for completion of thirty (30) calendar days. Bid documents can be obtained from Parker Engineering, LLC for a non-refundable fee of $100.00 per full-size set.
The project is funded through the Community Development Block Grant Program administered by the Georgia Department of Community Affairs, with additional funding from the City of Millen. Bidders must comply with affirmative action requirements and Build America, Buy America Act (BABAA) regulations, ensuring all iron, steel, manufactured products, and construction materials are produced in the United States. Bids must be accompanied by a bid bond or certified cashier's check for at least 10% of the base bid, and performance and payment bonds will be required for the successful bidder. The City reserves the right to reject any or all bids and requires contractor compliance with E-Verify regulations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Sylvania – 2024 Sylvania Streets CDBG
Technical Specifications
Parker Engineering, Inc. 00100-1 Proj. No. PE25162
SECTION 00100
ADVERTISEMENT FOR BIDS
PART 1. GENERAL
1.1 SEALED BIDS
Sealed bids for construction of 2024 Sylvania Streets CDBG will be received until November 5th, 2025, 3:00 PM at the City of Sylvania City Hall at 104 South Main Street, Sylvania, Georgia 30467. Bids may also be mailed to 104 South Main Street, Sylvania, Georgia 30467 (Attn.: Stacy Mathis). Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of thirty (30) days.
1.2 SCOPE OF WORK
The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following:
The project consists of street improvements in the City of Sylvania approximately 1.30 miles. Project includes milling, tack coat, asphalt leveling, striping, thermoplastic stop bars, traffic control.
Time allotted for completion of work is thirty (30) calendar days. All Work shall be completed in accordance with the plans and specifications.
1.3 PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS
Plans, Specifications, and Contract Documents are on file at Parker Engineering, LLC.
Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: (912) 764-7722, Email: lindsey@parker-engineering.com, upon payment of $100.00 for each full-size set (non-refundable).
1.4 BONDS
Bids shall be accompanied by a bid bond or certified cashier’s check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an “A” minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of “Best’s Key Rating Guide Property Liability”. Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a “Power of Attorney” authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond.
1.5 FUNDING SOURCES
Funding is to be provided by the Community Development Block Grant Program which is administered by the Georgia Department of Community Affairs. Funding also provided by
City of Sylvania – 2024 Sylvania Streets CDBG
Technical Specifications
Parker Engineering, Inc. 00100-2 Proj. No. PE25162 the City of Millen. All Bidders must comply with 41 CFR 60-4, in regard to affirmative action, to ensure equal opportunity to females and minorities and will apply the timetables and goals set forth in 41 CFR 60-4, as applicable to the area of the project. This project is a Section 3 covered contract. Section 3 Business Concerns are encouraged to apply.
1.6 BUILD AMERICA, BUY AMERICA BID REQUIREMENTS
This agreement is for services related to a project that is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (“IIJA”), Pub. L. 177-58. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States, as further outlined by the Office of Management and Budget’s Memorandum M-22-11, Initial Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure, April 18, 2022.
1.7 RESERVATION OF RIGHTS
Owner reserves the right to reject any or all Bids and to waive informalities, including without limitation, the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.
1.8 E-VERIFY
Contractor shall comply with E-Verify regulations.
CITY OF SYLVANIA
OWNER
END OF SECTION
File details come from the government source that posted it. Updated .