This document is a Statement of Work (SOW) for a heavy weather plan as part of a General Services and Requirements Contract for the USNS ANYSHIP. The key details are:

The contractor is required to provide a heavy weather plan that describes the protection arrangements and preventive measures to ensure the safety of the ship in Beaufort Wind Scale Number 7 and higher conditions. The plan must address daily weather monitoring, communications with government agencies, decision-making processes, personnel recall, facility/equipment protection, vessel mooring/flooding/ballasting precautions, and potential temporary relocation of the vessel. The contractor is responsible for the planning aspects, while extraordinary measures to protect the vessel will be approved by the government via a contract change order. The heavy weather plan is a required submittal as part of the technical proposal for this contract.

View the file

Other files

File Type Posted
0004_NSP_TAKE-SWI-TESTING AND QUALITY ASSURANCE.doc DOC document
0015_A_TAKE-SWI-ILS GFM.doc DOC document
0007_NSP_TAKE_SWI_COLD WEATHER PLAN.doc DOC document
0023_A_TAKE-SWI-HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR FACILITY.doc DOC document
Encl 4 MSC Ship Repair Facility Survey.docx DOCX document
Annual Submittals - RFI.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ANYSHIP

( XXXX XX )

GENERAL SERVICES AND REQUIREMENTS
CONTRACT NO. N00000-00-X-0000
ITEM NO. 0006
CATEGORY "N"
2023-06-29
TAKE_SWI_HEAVY WEATHER PLAN
Port Engineer's Name

1.0 ABSTRACT

This item describes the requirements for the contractor to provide a heavy weather plan.

2.0 REFERENCES/ENCLOSURES

2.1 References

2.0 MSC Drawing No. 839 – 0136 USNS ANYSHIP Trim and Stability Booklet.

2.2 Enclosures

2.2.1 Beaufort Wind Scale

3.0 ITEM LOCATION/DESCRIPTION

3.1 LOCATION: Contractor's facility

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES

5.1 In order to ensure vessel safety in extreme circumstances, the contractor's Heavy Weather Plan may contain references to ballasting and deballasting the vessel. In such an instance the safety requirements of reference 2.1.1 shall not be exceeded. Minimum draft clearance shall be two feet beneath the keel at mean lower low water (MLLW).

5.2 The contractor shall not be permitted to alter the ballast conditions of the vessel in any manner without having first submitted detailed trim and stability calculations to the OMT REP, and having obtained written approval of same from the ship's Master and the OMT REP.

5.3 In order to ensure vessel safety in extreme circumstances, the contractor's heavy weather plan may contain references to shifting the ship to another berth. In such an instance, all safety precautions shall be taken to ensure the ship's transit route maintains the minimum draft clearances as stated herein, an adequate quantity of tugs having sufficient horsepower ratings to maintain control of the ship are provided, and the ship is properly secured to the tugs at all times during the shifting evolution.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional

7.0 STATEMENT OF WORK REQUIRED

7.1 Arrangements/Outfitting

7.0 The contractor shall provide a heavy weather plan as part of the technical proposal. The plan shall include a description of the protection arrangements available and the preventive measures that will be taken to ensure the safety of the ship from heavy weather conditions for a Beaufort Wind Scale, enclosure 2.2.1, Number 7 and higher. The heavy weather plan should at a minimum address the following:

7.0 Daily monitoring and tracking operations of heavy weather conditions reported by the National Weather Service (NWS) and National Hurricane Tracking Center (NHTC).

7.0 Maintenance of communications with the local offices of the NWS, NHTC, and Federal Emergency Management Agency (FEMA).

7.0 A timetable for making decisions including identification of the parties participating in the decision-making process.

7.0 A timetable for initiating contractor actions relative to deteriorating weather conditions for Beaufort Wind Scale (enclosure 2.2.1) Number 7 and higher, based on the approaching geographic position of the reported heavy weather.

7.0 Describe the personnel recall plan to accomplish each level of action including:

7.0 Facility power loss protection and precautions

7.0 Facility damage protection and precautions

7.0 Personnel safety protection and precautions

7.0 Plant equipment protection and precautions

7.0 Resources available for continued contractor's communications with the appropriate decision-making company officials

7.0 Resources available for continued contractor's communications with OMT REP and the ship's Master

7.0 Describe the actions taken for each level of the Beaufort Wind Scale (enclosure 2.2.1) deterioration in preparation to protect the vessel from damage including:

7.0 Vessel mooring protection and precautions

7.0 Vessel flooding protection and precautions

7.0 Vessel ballasting and deballasting as a protection and precaution

7.0 Trim and stability calculation for ballasting/deballasting

7.0 Vessel equipment protection and precautions

7.0 Precautions taken if the vessel is on dry dock

7.0 Movement of the vessel to a different temporary lay berth for safety

7.0 Interim milestones for notification of OMT REP and ship's Master at each appropriate time of the decision-making process

7.0 Level of ship's force participation (if any) for each required action

7.0 The contractor is responsible for the costs associated with the planning aspects of the heavy weather plan that deal with the safety and protection of the contractor’s facility and the Government’s assets located in that facility. Extraordinary measures required to protect the vessel and its crew shall be presented to the OMT REP as a milestone event in the subject heavy weather plan. The OMT REP shall approve these extraordinary measures to prepare for heavy weather conditions via a change order.

7.0 Extraordinary measures may include such actions as ballasting the vessel, moving the vessel to a safe haven, and/or temporarily installing protective measures for sensitive and vulnerable ship’s equipment.

7.0 Non-extraordinary protective measures considered to be the responsibility of the contractor include such actions as adding additional mooring lines, temporarily disconnecting ship services, and vessel flooding protection.

7.0 Structural: None

7.0 Mechanical/Fluids: None

7.0 Electrical: None

7.0 Electronics: None

7.0 Preparation of Drawings/Documentation: None

7.0 Inspection/Test: None

7.0 Painting: None

7.0 Marking: None

7.0 Manufacturer’s Representative: None

8.0 GENERAL REQUIREMENTS: None additional