About this file

This is an Advertisement for Bid issued by Clinch County Board of Commissioners in Georgia for resurfacing improvements to the Homerville Bypass under TIA Project SWE Project #25-3633 (PI#0016215). The project encompasses resurfacing improvements totaling 4.71 miles on the Homerville Bypass. Sealed bids will be received until 10:00 a.m. local time on Tuesday, October 27, 2026, at the Clinch County Board of Commissioners' Office, with bids opened and read at that time. Proposals should be mailed to Jaclyn James, County Administrator, at 22 Court Square, Suite B, Homerville, Georgia 31634. All work must be completed within 120 consecutive calendar days from the start date. Specifications are available from Stonewide Engineering, Inc. at 516 East Ashley Street, Douglas, Georgia 31533, for $100.00 per printed set or $50.00 for a PDF version (both non-refundable). Bidders must obtain the bid package from the Engineer to be certified; bids from non-certified bidders will not be considered.

Bidders must submit a Bid Bond equal to at least five percent of the lump sum bid, with Performance and Payment Bonds each equal to 100 percent of the contract amount required upon award. The Bid Bond will be forfeited as liquidated damages if the bidder fails to execute the contract and provide required bonds within 10 days of notification of award. Contractors must be either prequalified with the Georgia Department of Transportation, Office of Contract Administration, or receive written approval from the Clinch County Board of Commissioners prior to bid opening, with proof of qualification or approval letter submitted with the bid. The project will be governed by Georgia Department of Transportation Standard Specifications (2021 Edition), Supplemental Specifications (2024 Edition), Special Provisions, and 2025 Construction Standards and Details. All materials, workmanship, and testing must meet Georgia Department of Transportation specifications. Bids may not be withdrawn for 60 days after opening. The County reserves the right to reject all bids, waive informalities, and accept any bid deemed in its best interest, as well as to add or delete from the contract post-award.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00030- 1 of 2

ADVERTISEMENT FOR BID

CLINCH COUNTY, GEORGIA

TIA PROJECT

SWE PROJECT # 25-3633

RESURFACING IMPROVEMENTS TO

HOMERVILLE BYPASS, PI#0016215

Separate, sealed Bids will be received for furnishing all materials, labor, tools, equipment, and incidentals necessary for the installation of the Resurfacing Improvements to Homerville Bypass until 10:00am (local time), Tuesday, October 27, 2026, at which time bids will be opened and read.

The meeting will be held at the Clinch County Board of Commissioners’ Office and will be open to the public. Proposals can be mailed to the attention of Jaclyn James, County Administrator for the Clinch County Board of Commissioners, 22 Court Square, Suite B Homerville, Georgia 31634. Proposals received after the designated time will not be considered. Clinch County Board of Commissioners may select a successful low bidder after evaluation of all bids.

The Scope of Work Includes:

Resurfacing Improvements on Homerville Bypass. (Total of 4.71 Miles)

All proposals shall be accompanied by a Bid Bond in favor of the Clinch County Board of Commissioners in the amount of at least five percent (5%) of the lump sum bid for the complete work:

such Bid Bond representing that the Bidder, if awarded a Contract, will promptly enter into a Contract and furnish Performance Bond and Payment Bonds as provided by the law and approved by the Attorney for the Clinch County Board of Commissioners. Performance Bond shall be equal to 100 Percent (100%) of the contract amount and Payment Bond shall be equal to 100 percent (100%) of the Contract amount.

The Bid Bond shall be forfeited to the Clinch Board of Commissioners as liquidated damages if the Bidder fails to execute the Contract and provide Performance and Payment Bonds within (10) days after being notified that he has been awarded the Contract.

All work on the project must be completed within 120 consecutive calendar days of date work begins.

Copies of the specifications may be obtained from Statewide Engineering, Inc., 516 East Ashley Street, Douglas, Georgia 31533, 912-384-7723 for $100.00 per set (non-refundable) for printed copy or $50.00 for pdf version emailed (non-refundable). Specifications are also on file (for view only) at the Clinch County Board of Commissioners’ Office. All Bidders must receive bid package from Engineer to be considered certified. Bids from non-certified Bidders will not be considered.

The Contractor shall be a current “Prequalified Contractor” with the Georgia Department of Transportation, Office of Contract Administration or shall be approved in writing prior to bid being opened by the Clinch County Board of Commissioners. A copy of the Contractor’s “Notice of Contractor Qualification” as issued by the Georgia Department of Transportation or a copy of an approval letter from the Clinch County Board of Commissioners must be submitted with the bid.

The Georgia Department of Transportation Standard Specifications, 2021 Edition, any applicable Supplemental Specifications, 2024 Edition, Special Provisions, and 2025 Construction Standards and Details, contained within this contract will be applicable to this project. All materials, workmanship, testing, etc. shall meet the Georgia Department of Transportation Specifications.

00030- 2 of 2

The Owner reserves the right to reject all bids and to waive informalities, and to accept any Bid which in its opinion may be in the best interest of the Owner. The Owner has the right to add or to delete from the Contract once it has been awarded. No bids shall be withdrawn for a period of 60 days after the opening of the bids.

Clinch County Board of Commissioners

By:

Henry Moylan, Chairman