00020 Invitation To Bid Cafeteria_061518.pdf
PDF 89 KB Posted
- Attached to
- CAFETERIA RENOVATIONS
- Solicitation number
- RFP-CAP-180000002843-1
- Issued by
- Genesee County, Clifford Village, Michigan
About this file
This is an Invitation to Bid issued by Clio Area Schools for renovations to the Clio High School Cafeteria located at 1 Mustang Drive in Clio, MI. The project involves selective demolition of existing cafeteria server flooring and installation of new materials including resilient flooring, stone veneer, painting, metal stud framing, and gypsum high impact board. A non-mandatory pre-bid conference is scheduled for June 21, 2018 at 3:30 pm at Clio High School, followed by a site visit to Carter Middle School. Sealed bids are due by July 9, 2018 at 3:30 pm at the Clio Area Schools Administration Office, with public bid opening to follow immediately after.
The project requires bids to be submitted on a lump sum basis with 5% bid security required. 100% performance and payment bonds are mandatory. Davis-Bacon Act prevailing wage rates apply to this project. Bid documents are available at no cost through www.intdesigns.com/planroom starting June 15, 2018. The successful bidder must not be disbarred from federal government contracts per SAM.gov verification. Questions must be submitted via email to scott@intdesigns.com, with responses provided via addendum no later than 3 business days before bid date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cafeteria Veneer and Flooring Plans.pdf | ||
| Clio HS Cafeteria Specificatons_061518.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
00020 - 1
SECTION 00020
INVITATION TO BID – High School Cafeteria
Notice is given hereby that: Clio Area Schools will accept bids from qualified contractors for addition and renovations to:
Clio Area Schools, Clio High School Cafeteria Renovation 1 Mustang Drive Clio, MI 48420 according to Drawings and Specifications prepared by:
Integrated Designs Inc.
8571 W. Grand River Avenue, Suite 600 Brighton, MI 48116
Including, but not limited to: Selective demolition of existing school cafeteria server flooring. Installation of new materials and systems, inclusive of all materials, labor and incidentals. Resilient flooring, stone veneer, painting, metal stud framing and gypsum high impact board.
A non- mandatory pre-bid conference will be held starting at 3:30 pm, Thursday, June 21, 2018 at, Clio High School, 1 Mustang Drive, Clio, MI. Followed by a site visit to Carter Middle School, 300 Rogers Lodge Drive, Clio. MI. afterwards.
Sealed bids will be received at the office of the Clio Area Schools, Administration Office, 430 N Mill Street, Clio, Michigan, 48420, until 3:30 pm Monday, July 9th. At that time, bids will be publicly opened. Bids received after the date and time specified will be returned to the bidder, unopened.
Bids will be taken on a lump sum basis as defined on the Bid Form. Bids shall be accompanied by bid security equal to 5% of the bid amount.
100% Surety Bonds for performance and payment of labor and materials are required. Bonds must be submitted on the forms provided. No alteration(s) to the form will be accepted.
Bid Documents may be examined at the offices of Clio Area Schools.
Bid Documents will be available after noon, on June 15th, 2018 at www.intdesigns.com/planroom, where you can view and download both drawings and specifications for this project at no cost.
All questions, please email scott@intdesigns.com. No correspondence shall be issued unless in addendum form 3 business days prior to the bid date.
Successful bidder must not be disbarred from doing business with the federal government as per SAM.gov.
Prevailing wage rates: Davis-Bacon Act wage rates ARE required on this project.
The Owner reserves the right to reject any or all bids and to waive irregularity in the bidding or the bidding process and accept the bid that is most advantageous to the Owner.
Dated: 6-15-18 by: Clio Area Schools
END OF SECTION
File details come from the government source that posted it. Updated .