00018334 Exhibit 5 Specifications.doc

DOC document 61 KB Posted

Attached to
ESB Chiloquin & OR 58 Stockpile Site Fencing
Solicitation number
S-73000-00018334
Issued by
Jackson County, Cheshire CDP, Oregon

About this file

This is an Exhibit 5 Specifications document for a state contract opportunity involving fence and gate installation at stockpile sites in Oregon, managed by the Oregon Department of Transportation or related state agency under Project Manager Ramon Alonso. The project scope includes installation of four-wire smooth twisted two-strand fencing and one 24-foot double gate across three separate locations: OR-58 Gate and Fencing at MP 73 on Highway 58, Chiloquin North Stockpile Site at MP 245.8 on Highway 97, and Chiloquin South Stockpile Site at MP 248.0 on Highway 97. The OR-58 location requires installation of a new 24-foot double gate set back 60 feet from the pavement edge with new fencing extending 50 feet beyond the gate posts in each direction. The Chiloquin North site requires new fencing on both sides of an existing gate, with the south section measuring 250 feet and the north section approximately 260 feet. The Chiloquin South site requires 260 feet of new fencing on the south side of an existing gate, with all ending points to be staked prior to project commencement.

The specifications require compliance with the 2024 Oregon Standard Specifications for Construction, with fencing specified as Type 1 construction featuring four-wire smooth double-strand twisted wire with a minimum top wire height of 48 inches and metal posts. Double gates must consist of two 12-foot gates per standard drawing RD 820 with 6-inch diameter schedule 40 galvanized steel gate posts, with hinge connections welded to posts; Powder River 12-Ft X 52-In 1600 Tube Gates are listed as acceptable or approved equal. Smooth wire must be twisted two-strand 12½ gauge conforming to AASHTO M 280 (ASTM A121) standards with Class 3 galvanizing. The document does not specify pricing terms, contract duration, set-asides, or award dates; these details would appear in separate procurement documents.

View the file

Other files

File Type Posted
00018334 ESB_RFCQ_279C.docx DOCX document
00018334 Exhibit 6 Standard Drawings.pdf PDF
00018334 ESB Sample Contract.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 5 - SPECIFICATIONS

Special Provisions

PROJECT NAME: ESB Chiloquin & OR 58 Stockpile Site Fencing SCOPE OF WORK: Work includes installation of four wire smooth twisted two-strand fence including the installation of one 24-foot double gate.

WORK LOCATION: There are three separate work locations for fence and gate installations as described below:

1. OR-58 Gate and Fencing

- Located at MP 73 on Highway 58. Install new 24-foot Double Gate at entrance to the stockpile site. The gates should be set back 60 feet from the edge of pavement, centered in the roadway opening. Install new fencing on both sides of the new gate to extend 50 feet beyond the gate posts in each direction.

2. Chiloquin North Stockpile Site - Located at MP 245.8 on Highway 97. The site has an existing gate. Work at this site is to install new fencing on both sides of the existing gate. Fencing south of the gate will be 250 feet in length and will end where the site drops off to a low point. This ending point will be staked prior to the project starting. The north section of the fence will be approximately 260 feet long with fencing meeting an existing property line fence. This area will also be staked prior to project start-up.

3. Chiloquin South stockpile Site - Located at MP 248.0 on Highway 97. The site has an existing gate. Work at this site is to install new fencing on the south side of the existing gate. The fencing will be 260 feet in length and will end at the approximate south corner of the site. This ending point will be staked prior to the project starting

PROJECT MANAGER:

Ramon Alonso

63055 N. Hwy 97. Bldg. M Bend, OR 97701 APPLICABLE SPECIFICATIONS: The Specifications which are applicable to the work on this project are the 2024 edition of the “Oregon Standard Specifications for Construction”, which are by this reference incorporated herein. However, the provisions of Part 00100 – General Conditions are not incorporated herein unless expressly set forth in this ITB.

All numbered references in these Special Provisions shall be understood to refer to the Sections and subsections of the Standard Specifications bearing like numbers and to the Sections and subsections contained herein in their entirety.

Section 00210 – Mobilization Comply with Section 00220 of the Standards Specifications:

Section 01050 – Fences

Comply with Section 00220 of the Standards Specifications modified as follows:

01050 – Scope – add the following to this subsection:

Fence to be Type 1, 4 wire smooth double strand twisted wire constructed as shown on standard drawing RD 810, top wire 48” min height, with metal posts.

Double gates shall consist of two each 12 foot gates per standard drawing RD 820 with 6” diameter schedule 40 galvanized steel gate posts. Gate to hinge and hinge to post connections are to be welded. Powder River 12-Ft X 52-In 1600 Tube Gates are acceptable commercially available gates or approved equal.

01050.10 Materials - add the following to this subsection:

Smooth Wire - The smooth wire shall be twisted two-strand 12 1/2 gauge conforming to the requirements of AASHTO M 280 (ASTM A121). Galvanizing shall be Class 3.

All barbed wire installed on the Project shall be new, and the same diameter.

File details come from the government source that posted it. Updated .