00017747 Exhibit 6 Plans.pdf
PDF 5 MB Posted
- Solicitation number
- S-73000-00017747
- Issued by
- Oregon
About this file
This is a set of structural and barrier plans for the State of Oregon Department of Transportation's median barrier repair project on Interstate 84 Eastbound at milepost 258.83 in Union County. The project involves the removal and replacement of 25 feet of concrete barrier and 16 feet of the leading end bridge rail. The plans include standard Oregon construction drawings effective from June 1, 2026, through November 30, 2026, and reference multiple standard drawing specifications for precast concrete barriers, cast-in-place concrete barriers, bridge rail details, temporary traffic control devices, and barricade configurations. The documentation comprises detailed technical specifications for Type "F" concrete rails, 32-inch precast concrete median barriers, transitional barrier sections, and reinforcing steel requirements, along with temporary construction staging and traffic control measures required during project execution.
The plans specify materials conforming to current Oregon Standard Specifications and ASTM standards, with all reinforcing steel meeting ASTM A706 or AASHTO M31 Grade 60 requirements. Concrete barriers must achieve Class 3300 with 1.5-inch slump, and all steel components including pins, bolts, dowels, and connectors require hot-dip galvanizing after fabrication. The barrier specifications include detailed joint configurations, expansion joint details, and scupper placement requirements, with safety emphasis throughout the documentation. Temporary traffic control provisions include lane closure tapers, portable changeable message signs, barricade placement standards, temporary sign supports, and freeway work zone delineation following Oregon Standard Drawings TM800 through TM880. The plans accommodate both fixed-form and slip-formed concrete construction methods and provide for both permanent and temporary barrier installations with specific anchoring and securing methodologies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00017747 PI_ITB.docx | DOCX document | |
| 00017747 Sample PI Contract.docx | DOCX document | |
| 00017747 Exhibit 5 Specifications.pdf | ||
| 00017747 Form A-2 Bid Pricing Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNION COUNTY
OLD OREGON TRAIL HIGHWAY
MEDIAN BARRIER REPAIR PROJECT
I-84 EASTBOUND: M.P. 258.83
ST. HELENS
ASTORIA
TILLAMOOK
MCMINNVILLE
ALBANYNEWPORT
CORVALLIS
HOOD
RIVER
DALLES
THE
MADRAS
PRINEVILLE
BEND
COQUILLE
GRANTS
PASS
Ashland
BURNS
KLAMATH
FALLS
CONDON
MORO
PENDLETON
LA GRANDE
ENTERPRISE
VALE Ontario
PORTLAND
SALEM
MEDFORD
EUGENE
ROSEBURG
Athena
N. Powder
Unity Dayville
Sisters
Juntura
Frenchglen
Burns Jct.
McDermitt
Paisley
La Pine
Crescent
Biggs
Lexington
Hermiston Boardman
Ukiah
Arlington
Malin
Brookings
Coos Bay
Drain
Canyonvil le
Reedsport
Oakridge
Goshen Florence
Lincoln City
Waldport
Home Sweet
Detroit Antelope
Maupin
Forest Grove
Hebo
Cannon Beach
Seaside Rainier
Milton-Freewater
W
26 35 197
39519
3953197
Bonanza
Junction City
BAKER CITY
HEPPNER
Copperfield
Lake Silver
Junction CaveBEACH
GOLD
Orford Port
LAKEVIEW
CANYON
CITY
Day John
CITY
OREGON
HILLSBORO
DALLAS
Redmond
Val ley Jordan
(503) 232-1987).
The Oregon Utility Notification Center Is
The Center (Note: The Telephone Number For
You May Obtain Copies Of The Rules By Calling
Through OAR 952-001-0100.
Those Rules Are Set Forth In OAR 952-001-0001
By The Oregon Utility Notification Center.
Oregon Law Requires You To Follow Rules Adopted
ATTENTION:
LET'S ALL
WORK TOGETHER
TO MAKE THIS
JOB SAFE
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
AUGUST 2026
UNION COUNTY
OLD OREGON TRAIL HIGHWAY
MEDIAN BARRIER REPAIR PROJECT
I-84 EASTBOUND: M.P. 258.83
STRUCTURE & BARRIER
PLANS FOR PROPOSED PROJECT
DEPARTMENT OF TRANSPORTATION
STATE OF OREGON
T. 2 S., R. 37 E., W.M.
F
O T
N E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
ADMINISTRATION
FEDERAL HIGHWAY
DIVISION
OREGON
PROJECT NUMBER
NO.
SHEET
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
A01A01STATE
INDEX OF SHEETS
SHEET NO. DESCRIPTION
Title SheetA01
R/W Map No. - N/A
Standard Dwg. Nos.
C01
ROADWAY CONSTRUCTION
General Construction
BRIDGE
J01 Plan and Notes
J02 Bridge Rail Removal Details
114596
SHEET NO. B.D.S. DWG. NO.
114597
DESCRIPTION
STRUCTURE #19684
Securing 32" Concrete Type "F" And Tall 42" Precast Concrete Barrier To The- RD502
Cast-In-Place Concrete Barrier Transition To Concrete Bridge Rail Type "F"- RD520
Type "F" Concrete Rail- BR200
Transition Type "F" Concrete Rail To Guardrail- BR203
I-84, MP 258.83 EB
PROJECT LOCATION
LA GRANDE
Tables, Abrupt Edge and PCMS Details- TM800
Temporary Barricades- TM820
Temporary Sign Supports- TM821
Temporary Sign Supports- TM822
Freeway Sections- TM861
Roadway
32" Concrete Barrier Type "F" Precast - RD500
32" Concrete Barrier Type "F" Precast Reinforcing- RD501
Concrete Barrier Cast-In-Place- RD505
Cast-In-Place Tall Concrete Barrier Transition To Standard Concrete Barrier- RD560
Freeway Or Divided Highway Speed Reduction (Paving Operations)- TM880
BA01 Details
R_M26046_ts_01.dgn :: A01 8/5/2026 9:17:41 AM hwye53h
2026.08.04 15:38:19 -07'00'
2026.08.04 15:44:23 -07'00'
2026.08.05 07:36:50-07'00'
2026.08.05 07:38:16-07'00' the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this*
4"
16"
Concrete
Bars "a" & longit.
1" added Ht.
Fixed Forms
Slip Formed Bars "A", "C" & "E"
Detail "A"
14.83 #/ft.
4"
4"
2"cl
2"
2"
1'-0"
2"
2"dee p
4"
(When Required by Bridge Plans)
2"cl.71 2" 71
2"
2'-8" Ht.
0.11 ft.³/ft.
10.81 #/ft.
Bar weight assume scoring joints at 15'-0" ctrs.
10" R.
4" R.
2"cl.
Roadway Width
4"
2"
8"
8"
1'-4"
2" 8"
3"
Details shown are general details only and should be modified as needed to fit specific project requirements.
"N"
Max. Joint
Traffic
Direction
"J"
Opening + 1"
3"
"J"+1 2"
4" 8" Steel Back
Cover Plate.
"J" = Joint Opening at mean temp. See
Project Plans.
Opening + 2"
4"
8"
Spanned distance
@ Mean Temp.
m in
Max. Joint
E x p a n s io n J t.
F il le r)
P re fo rm e d
Provide 1" dia. hole through barrier
@ 10'-0" for anchorage connectors
2" 71
2" typ.
4" V-Groove
Csk Screw
Bars "b"
Bars "a"
Finish Grade
1" radius
(typ.)
1" radius
(typ.)
4" Preformed
Expansion Joint Filler
8" Steel Front Cover Plate
#3 bolster "U" bar
0.545 ft C.G.
c l.
c l.
m in c l.
typ.
**2-#4
Detail "B"
4" wide x 11
2" deep poured joint filler
4" preformed expansion joint filler
V a ri e s c l.
**2-#4 Bars "C"
7-#4 Bars "C".
Stop 2" clear at open or exp. joints and rail ends.
**2-#4 Bars "E"
2" x3
4" scoring all faces above top of deck
Finish
Grade
Detail "C" Detail "A"
3" cl.
2" deep scored joint t y p
Finish
Grade
Scoring joint, see bridge plans for location. Place at equal spaces
15'-0" max. between all other joints.
See Elevation for extra bars at open or exp. joints and rail ends.
typ.
1" dia. hole through barrier
@ 10'-0" for anchorage connectors
1" dia. hole through barrier @ 10'-0" for anchorage connectors, starting at 4'-0" from bridge abutment.
See TYPICAL SECTION (Fixed Forms) and Elevation for details not shown, "Z" bars not shown for clarity.
3-12" dia.
x 11 2" long cap screws into resin bonded anchors (backside of rail only)
Expansion Joint or 2" to 1" Open Joint
(see Bridge Plans for
Exp. Joint width)
Use when water drains towards rail and no deck joint seal is used.
Use joint fillers for length of joint opening "J"+6".
#4 Bar "b" @ 71 2"
#4 Bar "b"
@ 71 2"
#4 Bar "a"
@ 15"
1"X3"X10"± polyfoam compression joint sealer
(Evazote or approved equal)
Roughen construction joint
See dwg. BR203 for rail on approach slab.
#4 Bar "a" @ 71 2"
See PLAN: BARS AT OPEN OR
EXPANSION JOINTS AND RAIL ENDS.
Add 4 extra Bar "a"
(or "A") front and back face plus 4 extra Bar "b" each side of open or exp.
joints and at rail ends.
Rail designed and crashed tested to meet NCHRP 350 TL-4 requirements.
Provide all reinforcing steel conforming to ASTM A706 or AASHTO M31
(ASTM A615) Grade 60.
Place all bars 2" clear of the nearest face of concrete unless shown otherwise.
Provide Class 3300 - 11 2 or 34 concrete.
Provide steel cover plates conforming to AASHTO M183 (ASTM A36).
Hot dip galvanize after fabrication.
At skewed bents up to 20° make joints parallel to the bent center line.
For skews greater than 20° make joints normal to rail.
Type "B" Joint, place at � interior bents with continuous deck
2-#4 Bars "Z" x panel length, 2" cl. required in all panels adjacent to ends and all joints except scoring joints.
Double tie to bars "A", "b" and #4 longitudinal bars for 12" each end. Bend as shown for 12" lap splice.
Place inside rebar cage and tie to back bars.
2"11
4"
2"
GENERAL NOTES:
NOTES:
Scoring joint, see bridge plans for location. Place at equal spaces 15'-0" max. between all other joints.
Type 'B' Joint with1 4" Preformed
Expansion Joint Filler. Place at � interior bents with continuous deck.
2.23 ft.³/ft.
NOTE:
3-12" dia. x 1" long
Csk galv. bolts A307 into resin-bonded anchors (front side of rail only)
#3 bolster "U" bar @ 30" max. ctrs. and each side of joints.
4"
Section A-A Detail "A"
Section C-C Section B-B
Detail "B"
#4 BAR "A"
#3 BOLSTER
"U" BAR
Detail "C" scoredjt.
(typ.)
2" deep scored joint (typ.), see Section A-A.
Appy Detail "C".
Place top of parapet 2'-8" above finish grade. Increase dimensions marked thus (*) by depth of ACWS.
** Continuous thru scoring and Type 'B' joints, stop 2" clear at ends and open or exp. joints.
6-#4 longit. bars.
Stop 2" clear at open or exp. joints and rail ends
2" clr. 2" clr.
B R
.d g n
-J A
N -2
BR200
TYPE "F" CONCRETE RAIL
Revised notes and rebar callouts.01-2023
19-JAN-2024N/A
General text revisions.01-20242
ELEVATION: CONCRETE BRIDGE RAIL (SLIP FORMED)
ELEVATION: CONCRETE BRIDGE RAIL (FIXED FORMS)
AND RAIL ENDS
OR EXPANSION JOINTS
PLAN: BARS AT OPEN
TYPICAL SECTION (FIXED FORMS)
TYPICAL SECTION (SLIP FORMED)SECTION D-D
EXPANSION JOINT COVER PLATE
ESTIMATED QUANTITIES
OPEN OR EXPANSION JOINT DETAIL
(FIXED FORMS)
(SLIP-FORMED)
SCORING JOINT DETAIL
(SLIP-FORMED)
TYPE "B" JOINT DETAIL
(FIXED FORMS)
TYPE "B" JOINT DETAIL
DETAIL "D"
C
C A
A
A
AB
B
D D
#4 Bar "A" @ 71 2"
#4 Bar "A" @ 71 2"
ACCOMPANIED BY DWGS.:
BR203
drawing RD407 for details
6"x8" block, see standard
W 6 x 9, typ.
W 8 x 15, typ.
Bridge rail pay length
"4 31'-0
"4 3" = 7'-94
35- spaces @ 1'-6 "219'-4" =2 13- spaces @ 3'-15'-0" taper
Concrete bridge rail
Edge of bridge approach slab on 20'-4" bridge approach slab.
No scoring joint for bridge rail
NOTE
End of bridge approach slab
8" x 8". All posts to be of same material.
Transition posts may be W 6 x 9 or timber
NOTE
PLAN
ELEVATION
joint. See Bridge Plans joint filler or expansion
" preformed expansion4
6- #7 x 10'-0"#4Bar set "a", typ.
Bar "b", typ.
connector, see Detail A Thrie beam terminal
SeeGuardrail transition, each
2- 0.105" thick elements Thrie beam rail, double thickness, see standard drawing RD410 1- 0.135" thick element, Thrie beam rail, single thickness, Plans
Grading
SECTION A–ADETAIL A SECTION B–B
A
A
"2111"417� holes
2'-6" "851'-0 � post lock nuts or jam nuts (on back side) and standard steel washers (ASTM A307) with
" dia. post bolts8 52-jam nuts, snug tight and lock nuts or standard steel washers (ASTM A325), with
" dia. bolts8 76-
B
B to installing through bolts.
sleeves for through bolts. Remove PVC sleeves prior Contractor's option (or similar) to use greased PVC
Grind smooth and cold galvanize.
" max. beyond nut.4
3installation so they extend concrete with low-impact rotary drill. Cut bolts after ") in hardened8
1Drill horizontal bolt holes (bolt dia. +
NOTE
cl.
2" c l."
c l.
alternate with full length bars @ 6" #4 x 7'-0" @ 1'-0" with 180° hook, ty p c l.
cl.
"211
"217
#4
6- #7 x 10'-0"
#4
2- #5 taper 5'-0"
W 6 x 9
W 8 x 15
Bar set "a"
Bar "b"
SKETCH
PLACEMENT
REBAR
(W 8 x 15)
THRIE BEAM BLOCK
Hot dip galvanize after fabrication.
Provide steel for wide-flange posts conforming to AASHTO M183 (ASTM A36).
GENERAL NOTES
SIDEFRONT BACK
"43
4"
" dia. hole, typ.4
Front face Back face
Accompanied by drawings BR165, BR200, RD401, RD402, RD407, RD408, RD410, RD412.
B R
.d g n
J A
N
BR203
GUARDRAIL
CONCRETE RAIL TO
TRANSITION TYPE "F"
Update: Changed RD480 to RD48210-2020
10–JAN–2025N/A
2 01-2023 Revised accompanied by dwg references, General text revisions.
3 01-2025 CAD standards updatesAdded contractor option note;
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
1 2
RD500
TYPE "F" PRECAST
32" CONCRETE BARRIER
R D
.d g n
TITLE CHANGED, REVISED DETAILS AND NOTES01-2021
14-JUL-2023N/A
J U
L
04-2021 REVISED DETAILS AND NOTES
12-2021 REVISED NOTES
REVISED DETAILS AND NOTES06-2023
MEDIAN BARRIER
CA
CA B
B
Section length = 12' - 6" (150")
End Detail
See Barrier bar, typ.
#4 Longitudinal
#4 Stirrup pair, typ.
(when required)
" x 4" Pin slot, typ.8
#4 Pin slot bar
PLAN
"2
"2
1" clear min.
#4 Stirrup pairs - 5 spaces @18" "4
311"4
"4
14" 14" "4 311 "4
3"x12" scupper, typ. 12" typ. " typ.2
#4 Longitudinal bar, typ. 3" typ. (when required)
" x 4" Pin slot,8
" dia. loop bar, typ.4
#4 pin slot bar, typ.
ELEVATION
loop bar, typ.
3/4" dia.
"16
3/4" dia. loop bar
LOOP DETAIL
BARRIER PIN
DETAIL
BARRIER END
1/2"
2" typ.
" rad.4
" rad.8
(No pin slots required)
NARROW BASE
side
Traffic where reqd.
paving ledge
"x4"2
"2
"8
"8
10"R.
12"
"4
"2 grade
Finish
SHOULDER BARRIER
STANDARD
" rad.4
" rad.8
12"
24"
" 1
"2
"8
** 4
"8
** 2 grade
Finish
(when reqd.)
and 2" dia. hole
"U" loop bar
24" (Secured)
(Unsecured)
* 24" min.
(Secured)
12" min.
66" (Unsecured) side
Traffic
" 1 " 2
"cl.2
"x2" Slot2
24"
"8
"8
"2
" R.8
" R.4
"R.
SECTION A-A
"x2" Slots2 ends, typ.
bottom, and
" chamfer top,4
Loop Detail
See Barrier Pin ends, typ.
bottom, and
" chamfer top,4
"2
" 2 " 2
"Cl.2
" x 2" Slot2
" R.8
" R.4
10"R.
"8
"8
"x2" Slots2
24"
SECTION B-B
" clear, typ.2 pair, typ.
#4 stirrup
#4 longitudinal bar, typ.
#4 Pin slot bar, typ.
slot , typ.
" x 4" Pin8
"4 bar, typ.
" dia. loop4 typ.
clr.2
SECTION C-C
Construct the 10" radius to provide a smooth transition between the slopes.
Dimensions marked thus are to the intersection point of the barrier slopes.** dimensions cannot be obtained shall be secured to roadway.
Barrier used as shoulder barrier and placed in areas where these* the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
temporary barrier.
surfacing. Maintain smooth, solid surfacing for the clear area behind behind unsecured barrier. Place temporary barrier on smooth, solid clear space behind the barrier if secured or 5.5 feet of clear space
For temporary installations, provide a minimum of 18 inches of11.
galvanized after fabrication.
All pins, bolts, dowels, loop bars, and connectors shall be hot-dip10.
thick consistency, as directed.
scuppers shall be portland cement grout, weak in strength and of
9. Concrete grout for grouting over pins, pinning holes or grouting of inches clear of nearest face of concrete, unless otherwise shown.
All reinforcement shall be full length as shown and shall be 28.
inches of grout, as directed.
7. When scuppers are not required, plug them with a minimum 2 shall be secured to roadway.
Precast concrete barrier used in medians less than 8 feet in width6.
with pin and loop assembly . See Std. Dwg. RD502.
5. Temporary concrete barrier to be precast concrete median barrier backfill behind barrier as shown on plans.
Narrow base shoulder barrier to be used only at locations with4.
radii greater than 770 feet.
3. Normal use of precast barrier units is restricted to curvatures with exceeding 1425 feet shall be 25 feet.
shall be 12.5 feet. Maximum chord length for curves with radii
Maximum chord length for curves with a 1425 foot radius or less2.
barrier that is maintained for use in temporary installations.
being anchored). See Std. Dwgs. Rd515 and RD516 for concrete for new permanent installations barrier anchoring details (when
See Std. Dwg. RD501 for details not shown. See Std. Dwg. RD5021.
RD501
REINFORCING
TYPE "F" PRECAST
32" CONCRETE BARRIER
R D
.d g n
NEW DRAWING CREATED01-2021
19-JAN-2024N/A
J A
N
07-2021 GENERAL ANNOTATION CLEANUP
PIN AND LOOP CONNECTION
PLAN
Connecting Pin
(See general note 5) as directed.
Grout over connecting pin, A
(Typ.)
" Dia. loop bar4
" Chamfer4
SECTION A-A
A
1" clearance
06-2023 REVISED DETAILS AND NOTES
ALTERNATE
CONNECTING PIN ASSEMBLY DETAIL
NOTE: Washer shall be forged as integral part of pin or shall be welded as shown.
2" min.
6"
(Typ.)
"R.
"4
"2
"8
"4
"8
"2
"Dia.
(Typ.)
" R.2
"4 333 1" R.
45°
144"
"2
"8 36(Typ.)
" R.2
5"
6"
#4
10"
11"
"8
5"
(Typ.)
" R.2
# 4 (Pairs)
REINFORCING STEEL BENDING DIAGRAM
(#4 Rebar)
MEDIAN BARRIER STIRRUP "M"
#4 PIN SLOT BAR
NARROW BASE
#4 LONGITUDINAL BAR
STANDARDALTERNATE
(Fabricated as a single piece)
#4
#4 LOOP BAR DETAIL
(When required)
(#4 Rebar)
SHOULDER BARRIER STIRRUP "S"
placement beveled to facilitate
" may be2
Bottom
1" dia.
" 4
2" dia.
" dia.16
"4
1"x8 UNC
1" dia.
WASHER DETAIL
See Detail "A"
" thkn.)4 circular washer
" dia.4
2" or 2
DETAIL "A"
WELDED WASHER PIN
FORGED HEAD PIN
FLANGE DETAIL
" max.2 min."8
" max.4
"16
3°
1" Dia.
" Max. thkn.)4
" Min. -8
" dia.2
2" or 2
Flange
See Detail "B"
Flange
DETAIL "B"
" Max.2
2" Min.
edges rounded bottom
1" Dia. pin w/
12-2023 GENERAL ANNOTATION CLEANUP
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
is within the minimum and maximum widths specified.
those shown in the details are acceptable, if the bearing surface manufacturers. Pin designs that are shaped differently than
Connecting pin head designs vary among different8.
Barrier Stirrup" Detail.
barrier except for the stirrup bars. See "Narrow Base Shoulder
Barrier" are the same as those shown for the 24 inch wide
The reinforcing steel details for the "Narrow Base Shoulder7.
hot-dip galvanized after fabrication.
All pins, bolts, dowels, loop bars, and connectors shall be6.
strength and of thick consistency, as directed.
grouting of scuppers shall be portland cement grout, weak in
Concrete grout for grouting over pins, pinning holes or5.
barrier with pin and loop assembly. See Std. Dwg. RD502.
Temporary concrete barrier to be precast concrete median4.
backfill behind barrier as shown on plans.
Narrow base shoulder barrier to be used only at locations with3.
shown.
inches clear of nearest face of concrete, unless otherwise
All reinforcement shall be full length as shown and shall be 22.
temporary installations.
RD516 for concrete barrier that is maintained for use in details (when being anchored). See Std. Dwgs. RD515 and
RD502 for new permanent installations barrier anchoring
See Std. Dwg. RD500 for details not shown. See Std. Dwg.1.
RD502
BARRIER TO THE ROADWAY
TALL 42" PRECAST CONCRETE
SECURING 32" TYPE "F" AND
R D
.d g n
12-JUL-2024N/A
J U
L
ANCHORING PIN ASSEMBLY DETAIL
" Dia.16
4"
4"
"2 thick plate washer"2
See detail "A"
FOR ASPHALT SURFACE
FOR CONCRETE SURFACE
DETAIL "A"
"16
13" 59" 59" 19"
19" 13"59"59" side(s) of barrier only required on traffic
1 7#8" x 4" Slot (typ.) -
Concrete barrier slots as a guide in concrete using
" dia. hole4
Drill 1
" x 4" Pin slot8
PLAN
CONCRETE BARRIER ANCHORING PIN LOCATIONS
CONCRETE ANCHORING PIN DETAILS
Traffic side Traffic side Traffic sideShoulder
Traffic side Shoulder Traffic side Traffic side
Concretepavement Edge of paved shoulder pin, typ.
galv. A36 steel anchoring
" long4
" dia. x 212
Precastconcretebarrier Precastconcretebarrier
Concretepavement
Four anchoring pins total per barrier section
(one in each end slot)
Note: Two anchoring pins required on traffic side
(Min.)
9"
M in
(T y p
M in
Six anchoring pins total per barrier section
(one in each end slot)
Note: Three anchoring pins required on traffic side
ASPHALT ANCHORING PIN DETAILS
pin,typ.
galv.A36steelanchoring long36""dia.x2
" x 4" Pin slot8
(Min.)
12"
M in
Edge of paved shoulder
M in
AsphaltConcretepavement AsphaltConcretepavement no.RD501
Seestd.drg.
METHODS OF SECURING CONCRETE BARRIER TO ROADWAY
PLATE WASHER DETAIL
Precastconcretebarrier
Precastconcretebarrier ty p
12-2023 REVISED NOTES AND DETAILS
06-2024 REVISED NOTES AND DETAILS
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this hot-dip galvanized after fabrication.
All pins, bolts, dowels, loop bars, and connectors shall be3.
and of thick consistency, as directed.
of scuppers shall be portland cement grout, weak in strength
Concrete grout for grouting over pins, pinning holes or grouting2.
details not shown.
in temporary installations. See Std. Dwgs. RD500 and RD501 for
RD515 and RD516 for concrete barrier that is maintained for use barrier (when being anchored) to the roadway. See Std. Dwgs.
This drawing applies to new permanent installations of concrete1.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
pulled out later, such as in temporary installations.
bottom for applications where the pin will be
Note: If desired, the plate may be welded top and
RD505
CAST-IN-PLACE
CONCRETE BARRIER
R D
.d g n
REVISED NOTES AND DETAILS06-2023
14-JUL-2023N/A
J U
L
(CONTRACTION JOINT)
SHOULDER BARRIER
MEDIAN BARRIER
DETAIL ''T''
DETAIL ''S''
(EXPANSION JOINT)
(NARROW BASE)
SECTION G-G
PLAN
G
G
ELEVATION
#4 Rebar #4 Rebar
STIRRUP ''S''STIRRUP ''M''
MEDIAN BARRIER SHOULDER BARRIER
(STANDARD)
to provide a smooth transition between the slopes.
point of the barrier slopes. Const. the 10" radius
Dimensions marked thus are to the intersection**
#4 Stirrup bars
" rad.2
"2
#4 bar (Typ.)
10" rad.
Finish grade shear key continuous
2"x12" cl.
"2
1 2
24" filler
" preformed2
"8 3** 2
"8 7** 4 " **8
" **8
"4
"2
"4 down 1' of back face.
contraction joint on front face top and Where shldr. barrier is backfilled, provide
NOTE:
1"2 saw Score and
3 m in
Finish grade
" 1 ra d
" 6
"2
"4 ra d
(See left) reinforcement #4 bar
24"
"8 7** 4
"8 3** 2
"2
"2 where reqd.
Paving ledge
Finish grade ra d
" "4
"2
"8 7** 4
"8 3** 2
" preformed filler2 centered in cross-section 3 - 1" dia. x 24" dowels
Lubricate dowels dowel caps Metal or plastic
Expansion joints 120' center to center
2" 18" nom.
20" nom.
20" nom.
20" nom.
20" nom.
20" nom.
20" 10"
#4 Stirrup pairs between expansion joints Contraction joints 12.5' centers joint joint to expansion from expansion face continuous 4 - #4 bars each
8"
4"
"4
"4
4"
4"
4"
8" from all expansion joints Stop reinforcement 2" see Detail ''S'' Expansion joint, centered in cross-section 3 - 1" dia. x 24" dowels dowel caps Metal or plastic
Lubricate dowels
" preformed filler2 through all contraction joints Reinforcement to be continuous see Detail ''T'' Contraction joint, Finish grade joint to expansion joint continuous from expansion 4 - #4 bars each faceshear key continuous 2"x12" the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this hot-dip galvanized after fabrication.
All pins, bolts, dowels, loop bars, and connectors when present shall be5.
concrete barrier that is maintained for use in temporary installations.
details (when being anchored). See Std. Dwgs. RD515 and RD516 for See Std. Dwg. RD502 for new permenent installations barrier anchoring4.
position.
Reinforcement shown is the minimum required for all barriers in final3.
behind barrier as shown on plans.
Narrow base shoulder barrier to be used only at locations with backfill2.
unless otherwise shown.
All reinforcement shall be 2 inches clear of nearest face of concrete1.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
RD520
CONCRETE BRIDGE RAIL TYPE "F"
BARRIER TRANSITION TO
CAST-IN-PLACE CONCRETE
R D
.d g n
14-JUL-2023N/A
J U
L
10" 4"
Metal or plastic dowel caps
B
B
A
A
12" of face of concrete
" clear8 joint filler. Stop
" thkn. preformed expansion4
Type "F"
Conc. bridge rail, continuous shear key
2"x12" shldr. barrier
Median barrier or dowels
3 - 1" dia. x 24"
6"
9"
9"
Finish grade stirrup pairs
Modified #4 shear key
2"x12" continuous bars each face
4 - 11'-10" #4
Traffic side
Pay limit for conc. bridge rail
(See general note 8)
Var. 6.25' to 18.75'
1'-8" nom.
shldr. barrier
Pay limit for
10"
Tr af fic si de
Va r.
6.
't o .7 5'
(S ee ge ne ra ln ot e 8)
Tr an sit io n shear key
2"x12" continuous conc. bridge rail
Dowels shall be embedded 12" into
3 - 1" dia. x 24" dowels (greased).
8"
4"
8"
4" 4"
4"
"4
2"4
CAST IN PLACE TRANSITION
STIRRUP PAIR
MODIFIED
STIRRUP PAIR
MODIFIED
PLAN
#4 Rebar
SECTION A-A
#4 Rebar
SECTION B-B
transition section.
Dimension variable through
(Looking at side away from traffic) barrier specified, see general note 6 details shall be as detailed for the
End configuration and connection
ELEVATION
*8" barrier specified, see general note 6 details shall be as detailed for the
End configuration and connection the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this transition length and end configurations of connecting barriers.
require varying lengths between 6 foot 3 inch and 18 foot 9 inch. Field verify
Normal length for cast-in-place transition is 12 foot 6 inches. Site conditions may7.
for details not shown.
at transitions. Dowelled connection is an acceptable alternative. See Std. Dwg. RD505
Field verify end configurations of connecting barriers prior to forming connections6.
Not for use on bridge end panel.5.
fabrication.
All pins, bolts, dowels, loop bars, and connectors shall be hot-dip galvanized after4.
See Std. Dwg. BR200 for Concrete Bridge Rail, Type "F".3.
face of concrete, unless otherwise shown.
All reinforcing shall be full length as shown and shall be 2 inches clear of nearest2.
use in temporary installations.
Std. Dwgs. RD515 anad RD516 for securing concrete barrier that is maintained for new permanent installations barrier anchoring details (when being anchored). See
See Std. Dwgs. RD500 and RD505 for details not shown. See Std. Dwg. RD502 for1.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
RD560
STANDARD CONCRETE BARRIER
BARRIER TRANSITION TO
CAST-IN-PLACE TALL CONCRETE
R D
.d g n
REVISED NOTES12-2021
15-JUL-2022N/A
J A
N
A
A
B
B
(see general note 6)
12'-6" Cast-in-place transition general note 3)
(See Std.Dwg. RD545 &
C-Shape (See Std. Dwg. RD500 & general note 3)
Loop bars
(see general note 6)
12'-6" Cast-in-place transition
(See Std. Dwg. RD500)
Standard conc. barrier
(See Std. Dwg. RD545)
Tall conc. barrier
4"
8" 12"
5" transition from A-A to B-B. See general note 6)
(Dimensions shown will be variable throughout
"2
24"
9"
26" for spacing see elev. view
Stirrup pairs, as shown
14 - #4 grade
Finish
Longitudinal bars
12 - #4 for spacing see elev. view
Stirrup pairs, grade
Finish continuous key
Full width continuous key
Full width
4" each
3 sp. @ 4" each
3 sp. @
3" grade
Finish
(See Std.Dwg. RD545 & general note 3)
C-Shape
Full width continuous key
(See Std. Dwg. RD500 & general note 3)
Loop bars
3" 6" each
4 sp. @
(see general note 6)
10" spaces nominal, as required
Modified #4 stirrups
6" each
4 sp. @
" 4
SECTION A-A SECTION B-B
END VIEW B-BEND VIEW A-A
A B
A B
CAST-IN-PLACE TRANSITION ELEVATION
MODIFIED #4 STIRRUPS
CAST-IN-PLACE TRANSITION PLAN
transition length and end configurations of connecting barriers.
Site conditions may require varying lengths between 6'-3" and 18"-9". Field verify
6. Normal length for cast-in-place transition is 12'-6".
fabrication.
5. All pins, bolts, dowels, loop bars, and connectors shall be hot-dip galvanized after
4. See Std. Dwgs. RD500, RD505 & RD545 for details not shown.
RD505 for details not shown.
at transitions. Dowelled connection is an acceptable alternative. See Std. Dwg.
3. Field verify end configurations of connecting barriers prior to forming connections
".4
2. Chamfer all edges of the nearest face of concrete unless shown otherwise.
" clear2
1. All reinforcing bars shall be full length as shown and shall be placed 1
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
7 - #4 longitudinal bars, each face the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
TM800
PCMS DETAILS
TABLES, ABRUPT EDGE AND
T M
.d g n
12-JUL-2024N/A
J U
L
Freeway
Use aggregate wedge when abrupt edge is 2 inches or greater.
four feet wide protect longitudinal abrupt edge as shown.
When paved shoulders adjacent to excavations are less than
NOTES:
shoulder, as far as practical.
Place cart / generator / power supply off of the on 10' spacing.
Use six tubular markers in shoulder taper outside shoulder, where practical.
Install Flagger Station Lighting beyond the
2" or GreaterExtg. pavement aggregate base rock
Shoulder or message sign (PCMS)
Portable changeable
20'
100'
4' B(III)R
Temp. Plastic Drums
Lighting
Flagger Station
50'
10'
Markers
28" Tubular
Place roll-up signs in advance of barricades.
plaques to the sign face using hook and loop fasteners.
If roll-up signs are used, attach the correct (CW21-9) throughout excavation area at spacings shown.
Continue signing and other traffic control devices
"RIGHT" (CW21-8C) riders with "LEFT" (CW21-8A) riders.
8' B(III)R barricades with 8' B(III)L barricades and replace the
If the excavation is located on left side of traffic, replace the abrupt edges of 1 inch or greater.
or other roadway work. Use abrupt edge signing for longitudinal
Abrupt edges may be created by paving, operations, excavations
GENERAL NOTES FOR ALL TCP DRAWINGS:
for max. spacing.
See TCD Spacing Table
Temp. Plastic Drums for max. spacing.
See TCD Spacing Table
28" Tubular Markers
UNDER TRAFFIC
UNDER CONSTRUCTION
EXCAVATION ABRUPT EDGE SIGN (PCMS) INSTALLATION
PORTABLE CHANGEABLE MESSAGE
LIGHTING DELINEATION
FLAGGER STATION
Sl.1:3
TAPER TYPES & FORMULAS
TEMPORARY BARRIER FLARE RATE TABLE
TAPER FORMULA
Merging (Lane Closure)
Shifting
Shoulder Closure
Flagging (See Drg. TM850)
Downstream (Termination)
"L"
"L"3 1"L"/3 or
50' - 100'
Varies (See Drawings)
"L"2 1"L"/2 or the Speed from the Tables below:
Use Pre-Construction Posted Speed to select
For Lane closures where W < 10', use "L" value for W = 10'.
Limit spacing adjustments to 30% of the "A" dimension for all speeds.
When necessary, sign spacing may be adjusted to fit site conditions.
Place traffic control devices on 10 ft. spacing for intersection and access radii.
NOTES:
SPEED (mph) MINIMUM FLARE RATE
M I N I M U M L E N G T H S T A B L E
"L" VALUE FOR TAPERS (ft) BUFFER "B" (ft)W = Lane or Shoulder Width being closed or shifted
20:1
19:1
18:1
16:1
14:1
12:1
10:1
9:1
8:1
FREEWAYS
SPEED (mph) W = 12 W = 14 W = 16
TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE
20 - 30
35 - 40
45 - 55
60 - 70 700
100 100
15001000 2640
100 20
Device Spacing (ft)
Max. ChannelizingSign Spacing (ft) SPEED (mph)
A B C
CW21-8A
(As noted)
36x18
C W
(Mount on TSS)
(As needed)
42x18
CW21-8C
OR
C
W
Plaques
CW21-9
Abrupt edge
8' B(III)R 8' B(III)R
mi.4 1mi.4
1mi.4
EDGE
ABRUPT
RIGHT
LEFT
(Roll-up sign)
(As needed)
EDGE
ABRUPT 32x11
32x11
32x11
CENTER
RIGHT
LEFT
10≤W
30≤
W/60, S = Speed, W=WidthS45: L = WS, Speeds < 45: L =≥formula, for Speeds For Shoulder closures where W < 10', use "L" value for W = 10' or calculate "L" using
TYPICAL ABRUPT EDGE DELINEATION
Smart Work Zone Systems Portable Traffic Signals
Detail as shown is used for trailered and non-crashworthy components of:
barricade may be omitted when PCMS is placed behind a roadside barrier.
Use six drums in shoulder taper on 20' spacing. The drums and
Left shoulder, use Type B(III)L Right shoulder, use Type B(III)R Use the appropriate type of barricade panels for PCMS location.
Install PCMS beyond the outside shoulder, when possible.
To be accompanied by Dwg. Nos. TM820 & TM821.
divided highways or freeways when positive protection is not available, or as directed.
Provide a truck mounted attentuator (TMA) to protect the active work area on high speed
Flaggers, Traffic Control Measures, or as directed.
Coordinate and control pedestrian movements through a Temporary Accessible Route using
Combine drawing details to complete temporary traffic control for each work activity.
Do not locate sign supports in locations designated for bicycle or pedestrian traffic.
High speed highways have a pre-construction posted speed of 45 mph or higher.
Low speed highways have a pre-construction posted speed of 40 mph or less.
All other signs mounted on barrier sign supports shall not exceed 12 sq. ft. in total sign area.
All diamond shaped warning signs mounted on barrier sign supports shall be 36" by 36".
background of all temporary warning signs.
Use fluorescent orange sheeting for the All signs are 48" x 48" unless otherwise shown.
to indicate traffic movements.
Arrows shown in roadway are directional arrows sequential arrow boards.
Place a barricade approx. 20' ahead of all shown are the minimum required.
Signs and other Traffic Control Devices (TCD)
07-2022 Added a note for TPARs
07-2024 Added a note for TMAs the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM820
TEMPORARY BARRICADES
T M
.d g n
01-JUL-2020N/A
J U
L
LC
CL
CL
CL
sheeting on rail encapsulated lens
White and orange
Extg. ground
" 6 m in m in m in m in
V a r
4' min. - 8' max.
m in
V a r m in
"6 m in
24" min. - 48" max.
sheeting on rail encapsulated lens
White and orange
Extg. groundExtg. ground sheeting on rail encapsulated lens
White and orange
M in
V a r
"6
24" min.
direction toward which traffic must turn in detouring.
it is desirable that the stripes slope downward in the
Where a barricade extends entirely across a roadway, at an angle of 45° in the direction traffic is to pass.
Markings for barricade rails shall slope downward directions from the center of the barricade.
slope the chevron striping downward in both
Where both right and left turns are provided for, local road users.
across roadway unless access is required for may be used. Extend barricades completely
For full roadway closures, the C or LR barricade
NOTES:
Traffic Traffic
(For approaching traffic)(For approaching traffic)
(For approaching traffic)
Traffic
(For approaching traffic)
Traffic
BARRICADE RAIL LAYOUT
DIAGRAM FOR BARRICADE PLACEMENT AND SLOPE MARKING
BARRICADE NOTATION
B(III)R
LT. SIDE - L
CLOSED - C LT. / RT. - LR
RT. SIDE - R
TYPE I TYPE II TYPE III
is signed according to the TCP. See Dwg. No. TM844.
closed and a temporary pedestrian accessible route (TPAR)
Do not place barricades in sidewalks unless sidewalk is facility is properly closed and signed.
Do not block bike lanes or shoulders unless the space is limited.
Use 4' Type III barricades where horizontal
Use barricades from ODOT Qualified Products List (QPL).
Rails must be 8" min. to 12" max. in height.
For rails less than 36" long, 4" wide stripes shall be used.
from barricade.
Ballast shall not extend above bottom rail or be suspended may be placed on lower frame to provide additional ballast.
Sandbags (approximately 25 lb sack filled with sand)
GENERAL NOTES FOR ALL DETAILS:
Barricade type
Barricade on the roadway
Indicates barricade placement the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM821
TEMPORARY SIGN SUPPORTS
T M
.d g n
14-JUL-2023N/A
J U
L
4"x 4"x 12'
2 - 2"x 4" @ 45° angle
2"x 6"x 37"
36"
Sandbags per side (typ.)
lag screw
"x 3"8 31 -per side (typ.)
" dia. bolts8 32 -screw per side (typ.)
"x 3" lag8 31 -per support (typ.)
"x 3" lag screws8 32 -
"x 37"2 1"x 54 sign (typ.)
48"x 48" sign area of 20 sq. ft. or less.
Use Double Post TSS for a total
NOTES:
per support (typ.)
2 - 3/8" dia. bolts per support (typ.)
2 - 3/8" dia. bolts
4 - 2"x 6"
40"
"2 12 - 4"x 4"x 5
NOTES:
2' - 8" Sandbags
2' - 6"
A
"4
" - 12 ga. PSST2
" - 12 ga. x 4" PSST Stub2
PSST Stub
" - 12 ga. x 4"2 12 A
See DETAIL A
" - 12 ga. PSST4
" - 12 ga. PSST4 sign (typ.)
48"x 48" per support (typ.)
" dia. bolts8 3Two, support (typ.)
joining brace and
" dia. bolt8
NOTES:
1 - 2"x 4"
1 - 4"x 4"x 4"
2 - 2"x 4"
1 - 4"x 4"x 4"
1- 2"x 4" 40"
Sandbags lag screws
"x 4"8 34 -
4"x 4"x 10'
"x 3" lag screws8 32 -
2"x 4"x35" @ 45° angle
2"x 4"x 6"
"x 3" lag screws8 32 -
"x 4" lag screws8 34 -
" dia. bolts8 31 -
" dia. bolts8 31 -
" dia. bolts8 32 -
" dia. bolts8 31 -sign (typ.)
36"x 36"
" dia. bolts8 32 -
TEMPORARY SIGN SUPPORT GENERAL NOTES:
Sheeting
Retroreflective
Sheeting
Retroreflective
" Sheeting
Retroreflective m in and Right sides)
Sheeting (Left
Retroreflective
NOTES:
SIGN POST REFLECTIVE SHEETING PLACEMENT
Sheeting
Retroreflective Sheeting
Retroreflective signs. Do not mount signs on Type II or III Barricades.
Use Single Post TSS for mounting "Business Access" (CG20-11)
Use Single Post TSS for a total sign area of 12 sq. ft. or less.
Sheeting may be applied directly to post material; or applied to a rigid, lightweight substrate, then securely attached to the posts.
for wood post TSS's. Use 2" wide sheeting for PSST TSS's.
Apply sign post retroreflectivity to each TSS post facing front; and to the left and right sides of the TSS, as shown. Use 3" wide sheeting and "DO NOT ENTER". For "STOP" and "DO NOT ENTER" signs, used red ANSI Type III or IV retroreflective sheeting on the TSS posts.
Apply fluorescent orange, ANSI Type VIII or IX retroreflective sheeting to TSS posts, as shown, for all temporary signs, except "STOP"
Use A325 Bolts or equivalent.
welding. Repair Galvanizing according to ASTM A780.
designation G90. Remove Galvanizing from steel before
Galvanize steel according to ASTM A653 with coating
All members shall have a minimum yield stress of 50 ksi.
Use PSST TSS's for a total sign area of 16 sq. ft. or less.
Society (AWS) D.1.1.
Weld steel according to American Welding
" - 12 ga. x 4" PSST Stub.2 1inside of the 2
" PSST4
1Do not use bolt to secure 2
" - 12 ga. x 4" PSST Stub.2 1inside of the 2
" - 12 ga. PSST to extend entire length4
See Dwg. No. TM204 for flag board mounting detail.
(25 lb. max per bag) (min. 100 lbs per side of each TSS).
Place a minimum of 50 lbs of sandbags on each of the four TSS supports legs.
TSS posts.
away from traffic, or cover the sign. Do not cover reflective sheeting on the
When not in use, locate TSS as far from Public Traffic as practicable and turn
Do not place or stack ballast more than 24" above the ground.
See "Temporary Sign Placement" detail on TM822 for sign installation heights.
four sides (S4S) and free of heart center (FOHC).
For wooden TSS's, use either Douglas Fir or Hem Fir, which is surfaced
Do not locate TSS's in locations that block pedestrian or bicycle traffic.
Do not tip over TSS at any time.
Double Post Perforated Steel Square Tube (PSST) Single Post
DOUBLE POST DETAIL PERFORATED STEEL SQUARE TUBE (PSST) DETAIL SINGLE POST DETAIL
Front Right Left Front FrontRight Left Side
(No Scale)
DETAIL A
" - 12 ga. PSST4
" - 12 ga. PSST2
A A
(No scale)
SECTION A-A
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM822
TEMPORARY SIGN SUPPORTS
T M
.d g n
01-JUL-2020N/A
J U
L
¼ ¼ as shown.
pedestrian pathway, maximum of 4" into it may extend a
7' above the sidewalk is installed less than
If bottom of plaque
B a c k o f c u rb m in m in
3' (min.)
4" max. *
2' (min.)
width is less than 6'
2' min. when the shoulder
6' - 12'
E d g e o f tr a ff ic l a n e m in m in . R
/W
1' min.
Urban Areas With Curb/Sidewalk surface, as shown.
minimum of 7'0" above pavement
(plaque) so bottom of sign is a bicycle traffic, install secondary sign shoulder or other surface used by adjacent to or intrude into a paved
Where temporary signs are located
E d g e o f tr a ff ic l a n e
Shoulder
Paved m in
R /W
1' min.
6' - 12'
E d g e o f tr a ff ic l a n e m in m in
TEMPORARY SIGN PLACEMENT
L 2-1/2"x 2-1/2"x 5/16"
"8 d eg head and clip
" dia. pin wth4
"16 5"x2
1"x 22 1L 2
"2
"16 5"x2
1"x 22 1L 2
" Sch. 40 pipe2 1210"
"2
"2
6" max.
of total sign area) (or, max. 12 sq. ft.
36" x 36" sign
2" Sch. 40 pipe
" Sch. 40 pipe2
Conc. Barrier
NOTES:
CONCRETE BARRIER SIGN SUPPORT
other than concrete.
Follow manufacturer recommendation when installing signs on barrier
Do not use clipped signs.
Weld steel according to American Welding Society (AWS) D.1.1.
Place support at connection between two concrete barrier sections.
Use for supporting a maximum 12 sq. ft. of total sign area.
Support fits both 32" and 42" tall "F" barrier.
All structural steel shall conform to ASTM A36.
and pinned when not in use.
Drill additional holes so sign can be rotated 90 degrees
To be accompanied by Dwg. Nos. TM670, TM671, TM687, TM688 & TM689.
according TCP Design Manual, MUTCD, ADA, or as directed.
Do not block bicycle lanes, sidewalks, or TPAR's with sign supports. Maintain minimum widths for these facilities
Rural Areas
Bicycles On Shoulder Rural or Urban Areas - Curb or No Curb
No Curb/Sidewalk Divided Highway/Freeway Medians the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM861
FREEWAY SECTIONS
T M
.d g n
01-JUL-2020N/A
J U
L
"L"
2'
W 8-
NOTES:
EDGE
ABRUPT
(All stages)
36x24
R2-6aP
B A 2 A
30'±30'±
300'±
30'±
300'±
Median
A
A
A
AC B A
See INSET "A"
Median mi.±2
30'±30'±30'±
8' B(III)R 8' B(III)R
under construction
End of area under construction
Start of area traffic adjacent to
Abrupt edge
Use "LEFT SHOULDER CLOSED" sign.
For left shoulder work, place TCD to close the left shoulder.
NOTE:
Sequential Arrow
(Mount on TSS)
(As needed)
(Mount on TSS)
(Mount on TSS)
C W
C W
W a
W a
W
(Roll-up sign)
CW21-9
32x11
32x11
32x11
(All stages)
36x24
R2-6aP
(All stages)
36x24
R2-6aP
W
W
W
W
W
W
W
W
Traffic
Under
Construction
Under
1000'
Taper
"B"
Buffer
"B"
Buffer
"B"
Buffer
"B"
Buffer
"B"
Buffer
AHEAD
WORK
ROAD
DOUBLE
FINES
CLOSED
SHOULDER
RIGHT
CLOSED
SHOULDER
RIGHT
"L"
RIGHT
LEFT
CENTER
AHEAD
WORK
ROAD
DOUBLE
FINES
½MILE
CLOSED
RIGHT LANE
½MILE
CLOSED
RIGHT LANE
AHEAD
WORK
ROAD
DOUBLE
FINES
(As needed)
54x18
CW21-8B
EDGE
ABRUPT
CENTER
(As needed)
54x18
CW21-8B
EDGE
ABRUPT
CENTER
BUMP
(As needed)
BUMP
(As needed) W
W
GENERAL NOTES FOR ALL DETAILS:
To be accompanied by Dwg. Nos. TM820, & TM821.
signed by the State Traffic Engineer.
* Regulatory speed reductions on State Highways require a Speed Zone Order
*Temp. Regulatory Speed Zone Reductions.
work zone, including; PMCS, Radar Speed Trailers, Advisory Speed signing, Additional traffic control devices may be used, as directed, to enhance the area. Locate TMA as per manufacturer's instructions, or as directed.
Truck Mounted Attenuator (TMA) should be used to protect the active work
AHEAD" (W20-5) signs and the appropriate "LEFT LANE ENDS" (W4-2) signs.
For work in the left lane, place TCD to close the left lane. Use "LEFT LANE CLOSED
UNDER CONSTRUCTION
UNDER TRAFFIC
Median
C
30'±
(All stages)
36x24
R2-6aP
W
DOUBLE
FINES
AHEAD
WORK
ROAD
W bAHEAD
CLOSED
SHOULDER
RIGHT
W bAHEAD
CLOSED
SHOULDER
RIGHT
unless otherwise directed.
For Freeway preservation work use Dwg. No. TM880, Remove rumble strip according to the plans and Dwg. No. TM830.
Do not stage traffic across longitudinal shoulder rumble strips.
plaques to the sign face using hook and loop fasteners.
If roll-up signs are used, attach the correct (CW21-9) where applicable.
"BUMP" (W8-1) signs to be installed on both sides of highway throughout area under construction where applicable.
mile intervals2 1to be installed on both sides of highway at
Additional ''ABRUPT EDGE''(CW21-(7,9)) signs with appropriate riders of 1 inch or greater.
Use "ABRUPT EDGE" (CW21-(7,9)) signing for longitudinal abrupt edges
CONTROL DEVICES (TCD) SPACING TABLE" on Dwg. No. TM800.
To determine sign spacing A, B, and C, use "TRAFFIC on Dwg. No. TM800 to determine Taper Length "L" and Buffer Length "B".
Unless otherwise shown, use the "MINIMUM LENGTHS TABLE"
TM822 for Concrete Barrier Sign Support details.
with a maximum 12 sq. ft. of total sign area. See Dwg. No.
Use Concrete Barrier Sign Supports for mounting signs with the work areas, shall move with the work areas.
Signing and other TCD shown to be installed in conjunction
Flaggers are not permitted to stop or hold freeway traffic.
48x24
CG20-2A
ROAD WORK
END
48x24
CG20-2A
ROAD WORK
END
SHOULDER CLOSURE
Divided Highway or Freeway
ONE LANE CLOSURE
Divided Highway or Freeway
(Signing Detail)
INSET "A"
SECTION A-A
on 40' max. spacing.
Temp. Plastic Drums the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM880
(PAVING OPERATIONS)
SPEED REDUCTION
FREEWAY or DIVIDED HIGHWAY
T M
.d g n
01-JUL-2021N/A
J U
L
07-2021 Revised sign sequence and PCMS message.
W 4-
AHEAD
WORK
ROAD
FINES
DOUBLE (All stages)
36x24
R2-6aP
W
AHEAD
CLOSED
LANE
RIGHT
W
30'±
A
A B
"L" (Non-Fwy)
1000' Taper (Fwy)
8' B(III)R
Median
A A
"B"
Buffer 2
A
1000'
See INSET "A"
Area Under Construction
Machine
Paving
Trailer 1
Speed
Radar
8' B(III)R
Arrow Sequential
"L"PCMS
NOTES:
30'±
30'±
AHEAD
WORK
ROAD
FINES
DOUBLE
W
W
5AHEAD
CLOSED
LANE
RIGHT
W
(All stages)
36x24
R2-6aP
YY
YY
30'±
ZZ
ZZ
ROAD WORK
END
CG20-2A, 48x24
EDGE
ABRUPT
(Roll-up sign)
CW21-9
32x11
32x11
32x11
YY
W
C W
EDGE
ABRUPT * *
C W a x
C W a
Trailer 2
Speed
Radar
EDGE
ABRUPT
C W
C W a
BUMP
(A s n ee d ed
W
Operations
End of Paving
300'±mi. ±4 1mi. ±2
mi. max4 1mi. ± ***2
mi. ±4
Operations
Paving
Start of
A
A
(Mount on Finish Roller)
2-line PCMS
(Mount on Intermediate Roller)
2-line PCMS
Machine
Paving
IN ROAD
WORKERS*
XX MPH
SLOW TO
WORKERS
SLOW FOR
IN ROAD
WORKERS
GENERAL NOTES FOR ALL DETAILS:
@ 80 ft. max spacing.
28" Tubular Markers
TM800 for max. spacing.
See TCD Spacing Table on
28" Tubular Markers
TM800 for max. spacing.
See TCD Spacing Table on
Temp. Plastic Drums
UNDER TRAFFIC
UNDER CONSTRUCTION
CENTER
LEFT
LIMIT
SPEED
LIMIT
SPEED
LIMIT
SPEED
LIMIT
SPEED
LIMIT
SPEED
30x36
R2-1
48x60
R2-1
48x60
R2-1
48x60
R2-1
W 3-
(CW21-9) sign face using hook and loop fasteners.
If roll-up signs are used, attach the correct plaques to the "ABRUPT EDGE" mile intervals throughout the active work area where applicable, as shown.2 plaques and "ROAD WORK XX MPH" (CW20-1a) to be installed on
Additional alternating ''ABRUPT EDGE'' (CW21-(7,9)) signs with appropriate longitudinal abrupt edges of 1 inch or greater. See Inset A.
Use "ABRUPT EDGE" (CW21-(7,9)) and "BUMP" (W8-1) signing for
1000' +/-mile of the paving machine.4 1Maintain "Radar Speed Trailer 2" within a and TCD, as shown. Move "Radar Speed Trailer 2" as work progresses.
paving operations, place the "Radar Speed Trailer 2" and other signing mile from the start of the2 1Once the Paving Machine is approximately
1000' or less in advance of existing SPEED LIMIT signs, or as directed.
speed limit. Do not install the two "SPEED LIMIT ZZ" signs if located
Install two "SPEED LIMIT ZZ" (R2-1) signs displaying the pre-construction
10 mph below speed zone order for non-freeways ("YY"-10)
15 mph below speed zone order for freeways ("YY"-15)
(CW20-1a) signs, as follows:
Use speed of "XX" on 2-line PCMS and "ROAD WORK XX MPH"
Mount PCMS on finish and intermediate rollers, as shown.
(Must be accompanied by an approved Speed Zone Order)
ONE LANE CLOSURE WITH SPEED REDUCTION (PAVING OPERATIONS)
Freeway or Divided Highway
(Signing Detail)
INSET "A"
Operations
Paving
Start of
Trailer 1
Speed
Radar after rollers have completed compaction.
mile spacing, as shown,4 1Place a Type III barricade in closed lane on on Dwg. No. TM800 to determine Taper Length "L" and Buffer Length "B".
Unless otherwise shown, use the "MINIMUM LENGTHS TABLE" use 36x36 signs, as shown on Dwg. Nos. TM821 and TM822.
If the inside shoulder in either direction is less than 4'
Flaggers are not permitted to stop or hold freeway traffic.
or high-speed divided highways.
paving or pavement preservation activities on freeways
Drawing intended for continuous or intermittantly moving
To be accompanied by Dwg. Nos. TM820 & TM821.
Do not delineate Radar Speed Trailers. Locate trailer as shown, or as directed.
Speed Zone Order from the State Traffic Engineer.
Speed Limit of "YY" shown on signs to be determined by an approved
CLOSED AHEAD" (W20-5) signs and the appropriate "LEFT LANE ENDS" (W4-2) signs.
For work in the left lane, place TCD to close the left lane. Use "LEFT LANE
CONTROL DEVICES (TCD) SPACING TABLE" on Dwg. TM800.
To determine sign spacing A, B, and C, use "TRAFFIC work progresses.
Decrease Tubular Marker spacing to 40 ft. behind the paving machine as
YY
LIMIT
SPEED
W 3-
5 YY
LIMIT
SPEED
48x60
R2-1
A A
RIGHT
X MILES
NEXT
WORKZONE
SPEED
STEADY
MAINTAIN
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
| M26046_CompiledPlans |
| M26046_A01 |
| M26046_BA01-FLAT |
| M26046_C01-FLAT |
| M26046_J01-FLAT |
| M26046_J02-FLAT |
| BR200 |
| BR203 |
| RD500 |
| RD501 |
| RD502 |
| RD505 |
| RD520 |
| RD560 |
| TM800 |
| TM820 |
| TM821 |
| TM822 |
| TM861 |
| TM880 |
File details come from the government source that posted it. Updated .