This is an Exhibit 3 Specifications document for the Oregon Department of Transportation (ODOT) regarding a maintenance yard fencing project. The work consists of removing the existing fence and installing approximately 770 linear feet of new Type CL-6 (6-foot) chain link fencing with barbed wire security top around a stockpile site located on OR202 at MP 28.86 near Jewel, Oregon. The project also requires installation of one 20-foot single swing gate along the property frontage at a location to be determined by the contractor and the Resident Project Representative (RPR). Work must be performed between 7:00 am and 7:00 pm, Monday through Friday, excluding weekends and state-observed holidays. The contractor may use the stockpile site as a staging area for materials and equipment during the project duration and is responsible for brush and material removal along the proposed fence line necessary for installation.

Payment will be made only for bid items installed per specifications, with all compensation including labor, equipment, materials, traffic control, mobilization, supervision, and brush and fence removal and disposal. The completed work must be inspected and accepted by the Project Manager or RPR prior to payment issuance. The contractor shall contact the Utility Notification Center before work begins, though no buried utilities are anticipated in the work area. All removed materials become the contractor's property and must be disposed of in a manner satisfactory to the Project Manager. The contractor is responsible for protecting all materials left on state property, with ODOT assuming no responsibility for loss, theft, or damage to equipment or materials on the jobsite.

View the file

Other files

File Type Posted
00017568 ESB_RFCQ_279C.docx DOCX document
00017568 ESB_Sample_Contract_279C~1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 3

SPECIFICATIONS

ESB – OR202 MP 28.86 Maintenance Yard Fencing OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION. The 2024 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed specifications in Part 00200 and beyond (“technical specifications”) that apply to this Project. Some sections of the technical specifications may be identified and modified in the Contract Documents. Sections of the technical specifications not identified in the Contract Documents remain applicable to the Contract according to their original terms.

Sections 00120-00199 in Part 00100 of the Standard Specifications are not applicable to the Contract unless they are specifically identified in a Contract Document as being applicable. However, if a section in Part 00100, Section 00120—00199, that has been identified as being applicable references another section in Part 00100, or if a technical specification references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the specification that referenced it. Abbreviations, definitions, and conventions in Part 00100, Section 00110, apply to the ITB and any resulting Contract as required for context within the Contract Document. The Standard Specifications can be accessed online at:

http://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx

SPECIAL PROVISIONS

The special provisions below identify and modify certain sections of the Standard Specifications.

All number references in the special provisions shall be understood to refer to the sections and subsections of the Standard Specifications bearing like numbers.

1. PROJECT MANAGER:

Cody Stone, PE

Maintenance and Operations Project Manager Cell: 503-953-6334

Cody.Stone@ODOT.Oregon.gov

2. RESIDENT PROJECT REPRESENTATIVE

Don Miller

Transportation Maintenance and Operation Manager – Warrenton Crew Cell: 503-440-2671 Don.E.MILLER@odot.oregon.gov

3. WORK SCHEDULE:

Contractor must perform all work under the Contract during the hours of 7:00 am and 7:00 pm Mondays through Fridays. No work may be performed on weekends or state-observed holidays.

4. MATERIALS:

Contractor shall comply with Section 01050 of the 2024 Oregon Standard Specifications for Construction. The Standard Specifications are available online at:

Oregon Department of Transportation : Standard Specifications : Doing Business : State of Oregon Contract work shall also comply with ODOT Standard Drawings RD815 and RD820, as applicable:

Oregon Department of Transportation : Standard Drawings | Roadway : Engineering : State of Oregon

5. DESCRIPTION OF WORK:

The work to be done under this Contract consists of the following:

1. The stockpile site is located on OR202 (047) at MP28.86 on the south side of the highway, just west of Jewel (the intersection of OR202 and OR103).

2. Contractor shall install approximately 770 LF of new “Type CL-6” (6’ chain link fencing, see detail RD815), with barbed wire security top, around the site. The existing fence is to be removed, and the new fence is to be installed in its place. Any questions about the layout or limits of the work not clearly defined here can be answered by the Resident Project Representative (RPR) listed above.

3. The installation of this fencing is intended to secure the existing stockpile site, and the work also requires the installation of one 20’ single swing gate installed along the frontage of the property in an ideal location to be determined by the contractor and RPR.

4. The contractor may use the stockpile site as a material and equipment staging area for the duration of the project.

5. Brush and material removal along the proposed fence line necessary to install new fence shall be removed by the Contractor.

6. TRAFFIC CONTROL:

No traffic control is required.

7. SPECIAL PROVISIONS:

1. Contractor shall contact the Utility Notification Center, but no buried utilities are anticipated in the work area. The Utility Notification system telephone number is 1-800-332-2344.

2. Removed materials will become the property of Contractor at the point of removal and must be disposed of in a manner satisfactory to the Project Manager.

3. No disposal of unused concrete on the jobsite. All cleanout of concrete delivery trucks shall be performed in an environmentally safe manner approved by the Project Manager or RPR.

4. Payment will be made only for bid items installed per specifications. Payment for bid items installed will include all labor, equipment, materials, traffic control, mobilization, supervision, brush and fence removal and disposal, and any other costs incidental to the work.

5. Completed work will be inspected and must be accepted by the Project Manager or RPR prior to any payment being issued.

6. Protect all materials left on state property or right of way. ODOT is not responsible for any loss, stolen, or damaged equipment or materials.