00017202 - Preliminary Results.pdf

PDF 88 KB Posted

Attached to
ESB I-5: SB MP 95 Selective Dead Tree Removal Project
Solicitation number
S-73000-00017202
Issued by
Douglas County, Oregon

About this file

This preliminary bid results document is submitted by the Oregon Department of Transportation (ODOT) for the ESB I-5: SB MP 95 Selective Dead Tree Removal Project in Douglas County, Oregon. The project involves selective cutting and removal of dead or visibly dying trees and vegetation from ODOT right-of-way along southbound Interstate 5 between mileposts 95.4 and 94.7, with all materials to be removed and chipped on-site. The scope of work is structured as two lump sum bid items: mobilization and selective dead tree removal. The competitive quote closing date was June 29, 2026, with work authorization not to commence before September 1, 2026 and all work to be completed by November 20, 2026. No pre-quote conference or public opening was held. The bid tabulation was issued on June 15, 2026, with aggrieved bidders having seven calendar days from the issued date to protest the intent to award.

Two bids were received for this project: Trees Plus Northwest, LLC from Salem, Oregon submitted a total bid of $85,290.00 (mobilization $15,290.00 and selective dead tree removal $70,000.00), while Papaya Contracting, LLC submitted a total bid of $48,000.00 (mobilization $5,000.00 and selective dead tree removal $43,000.00). This solicitation was restricted exclusively to firms certified as Emerging Small Businesses (ESBs) under Oregon's Certification Office for Business Inclusion and Diversity (COBID). Insurance requirements include commercial general liability of $1 million per occurrence/$2 million aggregate, commercial automobile liability of $1 million combined single limit, and workers' compensation with employer's liability of at least $500,000 per accident. The successful contractor must perform at least 51 percent of labor using its own workforce, with payment made monthly by the 10th following owner acceptance, net 30 days, with ODOT retaining up to 5 percent. The apparent successful offeror must submit certificates of insurance and a W-9 form within seven calendar days of the intent-to-award notification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Issued:

ITB No.

BIDDER

NAME:

Bid Closing: CITY/STATE:

Description:

CCB#:

Bid Item # Description Est

QTY UNIT

UNIT

PRICE

TOTAL

PRICE

UNIT

PRICE

TOTAL

PRICE

1 Mobilization 1 Lump Sum

15,290.00$ 15,290.00$ 5,000.00$ 5,000.00$

2 Selective Dead Tree Removal 1 Lump Sum

70,000.00$ 70,000.00$ 43,000.00$ 43,000.00$ 3 -$ -$ 4 -$ -$

TOTAL 85,290.00$ 48,000.00$

6/15/2026

Baker City, OR

Trees Plus Northwest, LLC

Salem, OR

This bid tabulation shall serve as ODOT's notice of intent to award a contract to (Insert Contractor Name). Aggrieved Bidders have __ (GTS ITB says 7 days, PW ITB says 5 days;

confirm that duration here matches the ITB language) calendar days from the issued date shown above to protest the intent to award. (If a potential winning bid is rejected, repost the revised bid tab and restart the award protest period)

(OR)

This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.