00017135 Prebid Sign In Sheet.pdf

PDF 237 KB Posted

Attached to
Amtrak Rail Station Roof Replacement
Solicitation number
S-73000-00017135
Issued by
Marion County, Oregon

About this file

This is a pre-bid sign-in sheet for the Oregon Department of Transportation's Amtrak Rail Station Roof Replacement project located at 500 13th Street SE, Salem, Oregon, under ITB BID # S-73000-00017135. The project requires complete removal and disposal of the existing worn membrane, replacement of damaged or wet insulation, and installation of an 80-mil white TPO roofing system with specified insulation layers, vapor retarder, and rigid coverboards. The roofing system must achieve UL Class A fire rating and comply with ASCE-7 wind uplift standards with positive drainage requirements. A mandatory pre-bid conference was held on June 24, 2026 at 10:00 a.m. Pacific at the project site, with attendance required for bid responsiveness. Bids were due on July 2, 2026. Substantial completion is required by August 10, 2026, with final completion by September 10, 2026. Work must occur on weekdays between 7 a.m. and 5 p.m., excluding weekends and state holidays unless approved.

The project cost estimate for bonding purposes is $100,000 to $250,000, with bid security of 10% of the total bid amount required. Bidders must maintain current Oregon Construction Contractors Board licensing, register in OregonBuys, and obtain and maintain a Public Works bond prior to starting work. The roofing contractor must have a minimum of five years' experience with manufacturer approval, and all roofing products must be supplied by a single manufacturer with at least 20 years' experience. Acceptable membrane manufacturers are Carlisle SynTec, Johns Manville, and Elevate, or approved substitutes. Contractors must comply with prevailing wage rate requirements for Marion County (BOLI Region 3) and furnish performance and payment bonds equal to the contract price along with Commercial General Liability insurance of $1,000,000 per occurrence / $2,000,000 annual aggregate. A 25-year manufacturer warranty with no dollar limit applies from substantial completion. Liquidated damages are $400 per calendar day for delays beyond substantial completion. The project manager is David Sturges at david.sturges@odot.state.or.us or (503) 580-1121.

View the file

Other files

File Type Posted
00017135 Invitation To Bid PI.docx DOCX document
00017135 Exhibit 5 Specifications.docx DOCX document
00017135 Exhibit 6 Statement of Work.doc DOC document
00017135 Addendum 1 .docx DOCX document
00017135 Prebid Meeting Agenda.doc DOC document
00017135 Exhibit 7 Plans.pdf PDF
00017135 Sample Contract PI.docx DOCX document
00017135 Addendum 2 .docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

sign in amtrak sign in amtrak_2

File details come from the government source that posted it. Updated .