This document comprises final design plans and specifications for waterline installation on the Center Street Bridge project in Marion and Polk Counties, Oregon, prepared by DOWL engineering firm for the Oregon Department of Transportation (ODOT). The project involves the supply and delivery of waterline materials and the installation of a new 36-inch ductile iron (DI) water main to replace an existing 24-inch main across the bridge and through surrounding areas. The work is divided into five phases scheduled over three work years: Phase 1 (East and West) involves installation of 36-inch and 24-inch mains on Front Street and related connections; Phase 2 covers 36-inch pipeline across Southbound Front Street; Phase 3 extends the 36-inch main from Front Street to Water Street; Phase 4 involves temporary connection to the existing 24-inch waterline across the bridge; and Phase 5 removes the existing 24-inch waterline from the bridge and installs the new 36-inch main to the terminus on the west side. The plans include detailed specifications for restrained joint ductile iron pipe, mechanical joint fittings, valves, air release assemblies, pipe supports, hangers, walkways, and appurtenances. All materials must be hot-dip galvanized, and the contractor is responsible for testing, flushing, disinfection, and chlorination procedures in coordination with the City of Salem.
The contractor shall provide detailed shop drawings, material lists, and specifications for engineer review and approval prior to construction. All pipelines must be hydrostatically tested to specified pressures in accordance with AWWA C-600 standards, with the contractor responsible for repairing any leaks. The City of Salem will perform certain pre-work and post-work tasks, including isolation and connection of existing mains, straddle block installation, and final chlorination and sampling. Restrained joint pipe with fully extended joints is required throughout the project, and all structural steel components must conform to ASTM specifications with proper galvanization. The project requires coordination with existing utilities, potholing verification, and compliance with O.S.H.A. safety regulations for trenching and excavation. Pipeline labeling must follow APWA color code standards with blue backgrounds and white lettering visible from normal eye height.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00017088_Bid Pricing Form.xlsx | XLSX spreadsheet | |
| 00017088_Sample Contract.docx | DOCX document | |
| 00017088_Bid Cover Sheet.docx | DOCX document | |
| 00017088_ITB.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
E " 4
C E
59V-051
C
E " 4
Kevin Johnson
Steve Wolfer Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
PL
AN
S
FI
NA
L R
EV
IE
W
WWW.DOWL.COM
OREGON
RE
GI
ST
ERE
D PROFESSIONALEN
GINEER
EXPIRES: JUNE 30, 2027
K
E V
IN R.OHN
S
O N2
, 211
A
Y
M
97292PE
Perm. ease.
Prop. temp. ease.
Prop. perm. ease.
R/W
R/W
Prop. perm. ease.
Prop. temp. ease.
Perm. ease.
R/W
R
W
R/W
R /W R R R
W
R /W
R R R
W
R/W
R/W
R /W
R R
R /W
R/W
RA01
R_K21705_pl_10.dgn :: Waterlne Key Map 1/13/2026 2:05:45 PM SWolfer
RC08
R C
RC0
RC03
R C
R C
RC06
WATERLINE KEY MAP
CENTER STREET NE
RC07
RB01 RB02 RB03 RB04
RB05
C
E " 4
C
E
C
E
C
E
59V-051
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
PL
AN
S
FI
NA
L R
EV
IE
W
WWW.DOWL.COM
OREGON
RE
GI
ST
ERE
E V
IN R.OHN
S
O N2
M
97292PE
PHASE 1 EAST
PHASE 2
PHASE 3
PHASE 4
PHASE 5
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
LEGEND
R/W R/W R/W
R/W R/W
R/W
Prop. temp. ease.
Prop. temp. ease.
Prop. perm. ease.
Prop. perm. ease.
Perm. ease.
Perm. ease.
R /W
P
/LR
R R
W
R R
R /W
R R R
W
P /L
R
W
W A
T E R S
T
N E
MARINE PARK
WALLACE
PHASE 1 WEST
R/W
RA02
C
E
R_K21705_pl_11.dgn :: Construction Sequence 1/13/2026 2:07:42 PM SWolfer
CONSTRUCTION SEQUENCE
CENTER STREET NE
waterline to terminus on West side.
Phase 5: Remove existing 24" waterline from bridge and install new 36"
Work Year 3:
Phase 4: Temporary connection to 24" waterline across bridge
Work Year 2:
Phase 3: 36" from Front Street to Water St. (temporary termination)
Phase 2: 36" across Southbound Front Street and installation of temporary 24" connection to existing main.
Phase 1 - West: Relocation of 12" main around work bridge embankment
Street and 12"/10" East of Front St.
Phase 1 - East: 36"/24" across Northbound Front Street; 24" within Front
Work Year 1:
CONTRUCTION SEQUENCE:
F R
O N
T S
T (S
B
O U
N D
F R
O N
T S
T (N
B
O U
N D
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
PL
AN
S
FI
NA
L R
EV
IE
W
WWW.DOWL.COM
OREGON
RE
GI
ST
ERE
E V
IN R.OHN
S
O N2
M
97292PE
WORK SEQUENCE:
WORK SEQUENCE
Extend/pull RJ pipe joints inside the casing all the way out to the west.b.
Connect to 36” D.I. on east side of casing.a.
Install 36” carrier pipe through steel casing.3.
Install steel casing under railroad.2.
Continue installing 36” pipeline west toward railroad crossing.1.
Work By ContractorA.
Phase 3: 36” From Front Street to Water St (temporary termination)
Nighttime closures of S. Bound Front St. lane.a.
Install 36” pipeline west across S. Bound Front St.2.
Connect to 36” MJ BFV on west side of cross at Sta. 15+35.1.
Work by ContractorA.
Phase 2: 36” Across South Bound Front Street
3. Abandon 24" DI
2. Install Blind flange (S)
1. Remove 24" Spool and FCA (S)
C. Post work by City
6. Prepare excavation for City to install temporary connection to existing 24" main.
5. Chlorinate, flush and sample. Chlorination and sampling by City.
4. Flush and test new 12" and 36" mains.
3. Install 36" main from 36" BFV at Sta 3+25 to temporary 36"x24" reducer at 3+72 and 12" blow off.
2. Install 36" main from tee at Sta. 2+96 to 36" BFV at Sta. 3+25.
1. Install 12" main from new tee at Sta. 1+00 to valve, reducers and tee assembly at Sta. 2+96.
B. Work by Contractor
5. Abandon existing 12" main between new 12" tee and extg. 24" main to east.
4. Install 12" tee and valve assembly at Sta. 1+00.
west D.I. spools and couplings north and south.
3. At Sta. 3+25 cut existing 24" WL and install 36"x24" cross, valves, temporary blind flanges east and
2. Shut down existing 24" WL to isolate this main.
1. Install straddle block on existing 24" WL north of approx Sta. 3+25.
A. Pre-work by City.
24" connection to existing system.
Phase 1 - West: Relocation of 12" main around work bridge embankment and installation of temporary
2. Install 24” blind flange (N)
1. Remove FCA, pipe spool and coupling (N)
b. South of Center St.; Approx. Sta. 15+35
2. Install 24” blind flange (S)
1. Remove FCA, pipe spool and coupling (S)
a. North of Center St.; Approx. Sta. 21+50 24” Main on Front St. (After Phase 4; see Phase 4, note B)2.
c. Install 10” 45-deg bends and coupling connection to the east to 10” main.
b. Extend 10” D.I. pipe
a. Remove temporary blow off on 10” pipe at approx. Sta. 17+38.
10-inch Main east of Front St.1.
Post work by CityD.
e. Chlorinate, flush, sample. Chlorination and sampling by City.
d. Flush and test 24", 12" and 10" mains.
c. Install 24" D.I. across west lane of Front Street and connect to 24" BFV (Sta. 21+62).
Install 36” D.I. across west lane of Front Street and connect to 36” BFV (Sta. 15+68 to 15+37).b.
Shift northbound traffic to east lane of Front Streeta.
Traffic Shift Stage 22.
travel lane.
d. Install 24” main in Front Street to north approx. Sta 21+30 and west to edge of active (west)
c. Install 12” and 10” mains to east termination at blow off (Sta. 15+68 to 17+38).
active (west) travel lane.
b. Install 36"x 24" cross and valve assembly at approx. Sta 15+68 and extend 36” D.I. to edge of
a. Shift northbound traffic to west lane of Front Street Traffic Shift Stage 11.
Work by contractorC.
Isolate cut and cap existing 10” main crossing Front Street at approx. Sta 20+97.5.
Install blind flanges east and west.
Install 36” x 24” cross, valves to east, south and west, D.I. spools and couplings north and south. 4.
Cut existing 24” main in Front Street median.3.
Shut down existing 24” WL to isolate main at this location.2.
Install straddle block on existing 24” WL south of approx. Sta. 15+35 in Front Street.1.
Advance Work By CityB.
4. Install 24" tee, couplings north & south, valve and blind flange (E)
3. Cut existing 24" WL
2. Shut down existing 24" WL to isolate main at this location.
1. Install straddle block on existing 24" WL north of approx. Sta 21+64
A. Pre-work by City Phase1 - East: 36”/24” across northbound Front Street, 24” within Front Street and 12”/10” east of Front St.
15. Chlorinate, flush and sample. Chlorination and sampling by City.
14. Test pipeline between BFV at Sta. 11+18 to BFV at Sta. 3+25.
13. Flush pipeline from east side BFV at Sta 11+18 to blow off at Sta. 2+96.
3+72. Construct straddle block on new 36" pipe.
12. Remove temporary 24" D.I. pipe and 36"x24" reducer and connect to 36" main at Sta.
11. Continue 36" D.I. pipe install down Bent 15 shaft.
10. With custom pipe section, complete pipeline connection to pipeline on the bridge.
section on bridge.
9. With expansion joint set at 50% of joint travel, measure and fabricate final connecting pipe expansion joint and the first 36" pipe section to the east on bridge.
8. Install 36" pipe across Bent 15 from vertical 90-degree bend at top of shaft through the
7. Connect to expansion joint at Bent 19 with joint set at 50% of joint travel.
Remove temporary caps/plugs.6.
Pressurize pipeline to fully extend the restrained joints.5.
Temporarily cap pipeline at both Bent 19 and Bent 15.4.
Install to last pipe hanger before Bent 19 before expansion joint location.3.
Bent 19. Pipe spigot ends pointing east, bells to west.
Sequentially lift pipe sections to supports near Bent 15 and pull pipeline east toward 2.
Install pipe hangers and roller supports1.
Bent 15 to Bent 19B.
Extend joints and anchor.6.
Install 36” pipeline inside box girder from Bent 20 to Bent 19.5.
Pull existing 24” pipeline and fittings out of the west end of the box girder at Bent 19.4.
pipe is lined with a 22" HDPE pipeline between Bent 15 and Bent 20. also requiring removal.)
Disassemble the 24” pipeline at Bent 15 and pull pipeline toward bent 15. (Note, the 24" DI 3.
Disconnect 36” x 24” reducer from east end of bridge inside the box girder.2.
Isolate and drain existing pipeline across bridge toward the blow off at approx. Sta. 2+96.1.
East Side Installation (Bent 20 to Bent 19)A.
west side
Phase 5: Remove existing 24” waterline from bridge and install new 36” waterline to terminus on
1. City to grout existing 24" water main between Water St. and Front St.
B. Post work by City
b. Chlorinate, flush and sample. Chlorination and sampling by City.
a. Flush pipeline across bridge to blow off at approx. Sta. 2+96.
2. Flush and disinfect pipeline across bridge.
k. Connect to existing 24" expansion joint with D.I. spool and two, 24" FCA's.
j. After pressure test remove temporary blind flange.
Tap reducer for air release as needed.i.
g. Install temporary blind flange on 24” reducer for pressure testing.
h. Bolt up upper 90-deg bend (FL) and 36" x24" Eccentric Red (FL).
Extend 36” pipe up into box girder.f.
e. Connect to 36” BFV at approx. Sta. 11+18.
d. Remove 24” 90-degree bend inside box girder.
c. Remove 24” vertical pipe and thrust block under bridge, Sta. 10+00.
b. Drain pipeline through 12” blow off on west side of river, approx. Sta. 2+96.
a. City to isolate existing 24" main.
East side of river1.
Work by ContractorA.
Phase 4: Temporary Connection to 24” Waterline Across Bridge
7. Chlorinate, flush and sample. Chlorination and sampling by City.
6. Flush and test 36" and 12" mains.
Install pipeline to 36” BFV and 12" blow off terminus of this phase.5.
c. Connect 12" water line to City-installed GV.
perform hot tap and install 12" GV.
b. Excavate and shore around extg. 12" CI water main west of Water St. for City crews to
Install 36"x12” tee and 12” pipeline across Water Street.a.
Continue installing 36” pipeline west and north from casing.4.
RA03
R_K21705_nt_10.dgn :: Work Sequence 1/16/2026 1:58:01 PM SWolfer
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
PL
AN
S
FI
NA
L R
EV
IE
W
WWW.DOWL.COM
OREGON
RE
GI
ST
ERE
E V
IN R.OHN
S
O N2
M
97292PE
After testing, remove all water from the water pipeline if not placed in service immediately.
placement method and layout shop drawings and details for review by the Engineer prior to construction.
The Contractor shall be solely responsible for detailing, fabricating installing and testing the pipelines. Submit pipeline
Number", whichever is larger.
shall be a minimum of 3'-0" long, or a minimum of one letter height beyond the text "Legend, Owner, Emergency Phone self-adhesive, vinyl labels at each end of the bridge and oriented to be seen from normal eye height from the ground. Labels
Pipeline shall be clearly labeled in accordance with the following APWA color code: "Blue Background with White Lettering". Place
Contractor shall be responsible for repairing all leaks to comply with pressure testing requirements.
Hydro-statically test all pipelines to a specified pressure in the Special Provisions and in accordance with the AWWA C-600.
joints.
Bent 15 and bent 19 before final measurement, fabrication of custom pipe section(s) and connections to the expansion
(f) Note this process will be required between the fixed end at Bent 20 and the expansion joint at Bent 19 and again between
(e) Connect the line to the expansion joints set at the mid-range of expansion/contraction length.
(d) Release pressure and remove blind flanges.
the pipe supports so the supports are not restraining the longitudinal deflection, typical.
longitudinal at (c) Slowly pressurize the line to the testing pressure checking to makes sure that as the line extends it slides
(b) Place temporary restrained cap or plug before expansion joints at Bent 15 and Bend 19.
manufacturer's recommended procedures.
(a) Manually extend each ductile iron joint during pipe installation to minimize pullout expansion following caused by lengthening of the pipeline under pressure if not pre-extended:
extend the pipeline installation across the bridge. This procedure minimizes longitudinal distortion at the expansion joint
Prior to connection of pipeline at both ends of the bridge and the expansion joints, the following procedure shall be followed to treatments, and specialty items for review and approval by the Engineer.
Contractor shall provide a material list and a detailed pipeline layout shop drawing including fittings, spool sections, end
530.14. Place inserts such that the hanger rods are plumb without bending the hanger rods.
per ASTM Specifications A123 and A153 as applicable. Structural concrete inserts shall meet the requirements of specification washers are required. All bolts, rods, nuts, structural steel, rollers and miscellaneous attachments shall be hot dip galvanized
Specification A36 or A500 Gr. B. All washers shall conform to ASTM Specification F436 except where low-friction polymer
F1554 Grade 55. All nuts for threaded rod shall conform to ASTM A563. Structural steel in supports shall conform to ASTM
All bolts and nuts shall conform to ASTM Specification A307 unless noted otherwise. All threaded rod shall conform to ASTM be hot dip galvanized after fabrication.
Pipe roller materials shall conform to the Anvil figure numbers shown on the plans or approved equal. All hanger material shall
See Special Provisions for requirements of the expansion joints.
equal. Exceptions include where otherwise indicated in the drawings to utilize a restrained mechanical joint.
All joint in pipes and fittings shall provide positive joint separation by means of interference fit weld beads, bolted flanges, or
WATER GENERAL NOTES (ON STRUCTURE):
GENERAL NOTES
and standard street cut requirements.
7. Refer to ODOT standard drawings RD300 and RD302 for trench bedding, and backfill requirements
6. Salvage temporary plugs, caps or blind flanges to the City at the end of the project or upon request.
Monday - Wednesday to provide for water sampling analysis for the 48-hour sample.
water. Provide 14 days notice in advance of disinfection needs. City will only begin chlorination will conduct sampling for bacteriological testing. Provide piping for discharge of the chlorinated
5. City to provide equipment and chemicals for dechlorination for final flushing after disinfection and
City after successful testing.
4. Install chlorination taps as indicated in the drawings, and excavate to the taps for removal by the chemicals for dechlorination during initial blow off and flushing of new water mains.
protection of facilities and environment from discharged water. Provide any required equipment and
3. Contractor responsible for all flushing provisions required to attain adequate flushing and can open valves for filling and flushing pipelines.
2. Only City staff can cut and connect to existing mains and operate city-owned valves. Only City staff sections after assembly of the joint and prior to making connections to bends, fittings or valves.
1. Use restrained joint pipe for all pipelines on the project. Fully extend the restrained joint pipe
WATER GENERAL NOTES:
RA04
R_K21705_nt_11.dgn :: General Notes 1/13/2026 1:46:51 PM SWolfer
PIPE SHIELD DETAIL
3/16"=1'-0"Scale:
Pipe shield, 3'-10" long
SPAN 15 - 1
1"=10'Scale:
� Bent 15
123'-7 15'-7" 19'-10"
SPAN 15 - 2
1"=10'Scale:
� Bent 16
19'-10" 19'-10" 19'-10" 19'-10"
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181 bridge deck Existing concrete ball expansion joint Force balanced double
Waterline Elevation See sht. RB06 for Bent 15
Existing steel girder cross-frame, typ.
Existing steel where shown otherwise connection, typ. except Restrained joint pipe
Hanger Number on bridge.
4. See Sht. RB07 for construction work sequence details for pipeline installation.
3. See RA and RC sheets for additional notes and are maintained unless noted otherwise.
provided minimum clearances to cross-frames to accommodate different pipe lengths
2. Hanger spacing dimensions may be adjusted pipe roller unless noted otherwise.
1. All dimensions horizontal and to centerline of
NOTES:
*Dimension cannot be adjusted.
pipe bell, measured along pipe.
roller to beginning of flare for
**Dimension from centerline of
"4117'-4 min., typ.
"212'-0
19'-10" determine length in field FLxRJ spigot spool, (See Note 2 and Pipe Shield Detail) required to match hanger spacing RJ pipe section, typ., length as see Sht. RB09 for details Waterline hanger, typ., to be removed, typ.
Existing maintenance walkway
Walkway at Bents
See sht. RB15 for Maintenance
Walkway
Maintenance
See shts. J02 and JA01 for list of bridge drawings.
Bridge #00123K
1 2 3 4 5 6
6 7 8 9 10 11
X
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
RB01
BRIDGE WATERLINE LAYOUT - 1
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
WWW.DOWL.COM
BR_K21705_bt_97.dgn :: RB01 1/13/2026 10:07:22 AM SWolfer
� Bent 16
SPAN 16 - 1
1"=10'Scale:
19'-10"19'-10"19'-10""8118'-419'-10""855'-8
SPAN 16 - 2
1"=10'Scale:
� Bent 17
19'-10"19'-10"19'-10"19'-10""8118'-4
Walkway at Bents
See sht. RB15 for Maintenance
11 12 13 14 15 16 17
17 18 19 20 21 22 23
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
19'-10"
19'-10" on bridge.
4. See Sht. RB07 for construction work sequence details for pipeline installation.
3. See RA and RC sheets for additional notes and are maintained unless noted otherwise.
provided minimum clearances to cross-frames to accommodate different pipe lengths
2. Hanger spacing dimensions may be adjusted pipe roller unless noted otherwise.
1. All dimensions horizontal and to centerline of
NOTES:
see sht. RB09 for details Waterline hanger, typ., Shield Detail, sht RB01) spacing (See Note 2 and Pipe as required to match hanger RJ pipe section, typ., length to be removed, typ.
Existing maintenance walkway
Existing steel cross-frame Existing steel girder
See shts. J02 and JA01 for list of bridge drawings.
Bridge #00123K
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
RB02
BRIDGE WATERLINE LAYOUT - 2
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
BR_K21705_bt_96.dgn :: RB02 1/13/2026 10:07:28 AM SWolfer
SPAN 17 - 1
1"=10'Scale:
� Bent 17
19'-10""855'-8 "4118'-4 19'-10" 19'-10" "8119'-10
SPAN 17 - 2
1"=10'Scale:
18'-1" 19'-10" 19'-10" 19'-10" 19'-10"
� Bent 18
Walkway at Bents
See sht. RB15 for Maintenance
23 24 25 26 27 28 29
3 3 2 2 1 2
29 30 31 32 33 34 35
2 2 1 2 3 2 3
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
19'-10"
19'-10"
See sht. RB08 for details.
4" Air and Vacuum Valve (Flomatic Maxiair #6524)
1" Air and Vacuum Valve (Flomatic Maxiair #6521)
1" Air Release Valve (Flomatic Miniair #6503C)
AIR RELEASE VALVE NOTES:
on bridge.
4. See Sht. RB07 for construction work sequence details for pipeline installation.
3. See RA and RC sheets for additional notes and are maintained unless noted otherwise.
provided minimum clearances to cross-frames to accommodate different pipe lengths
2. Hanger spacing dimensions may be adjusted pipe roller unless noted otherwise.
1. All dimensions horizontal and to centerline of
NOTES:
to be removed, typ.
Existing maintenance walkway Existing steel cross-frame Existing steel girder see sht. RB09 for details Waterline hanger, typ., Shield Detail, sht. RB01) spacing (See Note 2 and Pipe as required to match hanger RJ pipe section, typ., length
See shts. J02 and JA01 for list of bridge drawings.
Bridge #00123K
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
RB03
BRIDGE WATERLINE LAYOUT - 3
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
BR_K21705_bt_95.dgn :: RB03 1/13/2026 10:07:33 AM SWolfer
SPAN 18 - 1
� Bent 18
5'-6" 19'-10" "4117'-2 19'-10" 19'-10"
SPAN 18 - 2
1"=10'Scale:
� Bent 19
19'-10" "4318'-11 ball expansion joint Force balanced double
* Dimension cannot be adjusted.
determine length in field RJ bell x FL spool, Walkway
Maintenance
35 36 37 38 39 40
40 41 42 43 44 1 2
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
19'-10"
19'-10" on bridge.
4. See Sht. RB07 for construction work sequence details for pipeline installation.
3. See RA and RC sheets for additional notes and are maintained unless noted otherwise.
provided minimum clearances to cross-frames to accommodate different pipe lengths
2. Hanger spacing dimensions may be adjusted pipe roller unless noted otherwise.
1. All dimensions horizontal and to centerline of
NOTES:
Shield Detail, sht. RB01) spacing (See Note 2 and Pipe as required to match hanger RJ pipe section, typ., length to be removed, typ.
Existing maintenance walkway
Existing steel cross-frame Existing steel girder
See shts. J02 and JA01 for list of bridge drawings.
Bridge #00123K
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
RB04
BRIDGE WATERLINE LAYOUT -- 4
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
BR_K21705_bt_94.dgn :: RB04 1/13/2026 10:07:37 AM SWolfer
SPAN 19 - 1
� Bent 19
"434'-6 8 513'-1 "8723'-1 be removed, typ. (7 places) Existing pipe roll stand to long pipe shield Pipe roll with 1'-0" spool FL x RJ spigot
SPAN 19 - 2
1"=10'Scale:
� Bent 20
"8119'-10 "8115'-10 8'-8" see sht. RB23 for access hatch details see sht. JA47 for removal details, Existing access hole to be modified, connection details See sht. RB19 for temporary
Flanged base bend fitting
RJ bell x FL spool
1 2 3 4
3'-4"±
4 5 6 7
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
19'-10" see sht. JA47 for details be modified, typ. (4 locations), Existing concrete diaphragm to on bridge.
4. See Sht. RB07 for construction work sequence details for pipeline installation.
3. See RA and RC sheets for additional notes and are maintained unless noted otherwise.
provided minimum clearances to cross-frames to accommodate different pipe lengths
2. Hanger spacing dimensions may be adjusted pipe saddle unless noted otherwise.
1. All dimensions horizontal and to centerline of
NOTES:
support spacing (see Note 2) length as required to match RJ pipe section, typ., see sht. RB22 for details Pipe saddle "C", typ., see sht. RB18 for details Pipe support, typ., *Dimension cannot be adjusted.
temporary pipe connection.
**Field verify dimension after making
See shts. J02 and JA01 for list of bridge drawings.
Bridge #00123K
19'-10"
" **4 32'-10
" **2 12'-10
"8 12'-9
"4 32'-7
"8 32'-6
"4 32'-4
"8 72'-3
(Bottom Slab to � Pipe) Height
Support Number
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
RB05
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
BRIDGE WATERLINE LAYOUT - 5
BR_K21705_bt_101.dgn :: RB05 1/13/2026 10:07:42 AM SWolfer
1'-3"±, typ.
36'-2"±
"8
4'-11
"CE" Line
El. 126.0
BENT 15 ELEVATION
1"=15'Scale:
Looking back on station sht. RB21 for details
Pipe Saddle "B" see details places, see sht. RB17 for and Pipe Saddle "A", typ. 3
Crossbeam Pipe Support sht. RB21 for details
Pipe Saddle "B", see sht. RC08 for fitting alignment mechanical joint fittings, see
36" ductile iron 90° bend, (adjust length as required for fit) joint spigot x plain end pipe section
36" ductile iron pipe, 3'-8"± restrained pipe, restrained joints
36" ductile iron water of pipe in ground
See sht. RC08 for details x restrained joint bell pipe section
36" ductile iron pipe, 3'-0" flanged
90° bend, typ. 2 places
36" ductile iron water pipe, flanged
36" ductile iron water pipe, flanged required for fit) spool, 3'-0"± (adjust length as
36" ductile iron water pipe, FL x FL
Coordination Detail, this sheet
See Pipe Bracket sht. JA55 for details
Thrust block, see for details support, see sht. JA57
Concrete water line sht. JA65 for details plate washers, see
Structural rods and washers structural rods and plate to avoid conflict with
Field locate pipe bracket
EXPIRES: 6/30/
W
E
I E
E S
E OF
S
O N
OREGON
,2
N G N E R
R G I
TE
R
DPR E
SI
A L
1YL
U
JA
N
DRE
EANHO
W
D
E
60181 determining lengths of final pipe segment(s).
pipe and fully extend all RJ joints prior to
3. Assemble vertical sections of restrained joint sequence.
2. See Sht. RA03 for water line construction work details for pipeline installation.
1. See RA and RC sheets for additional notes and
NOTES:
PIPE BRACKET COORDINATION DETAIL
Scale: 1/4"=1'-0"
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
PL
AN
S
FI
NA
L R
EV
IE
W
RB06
BENT 15 WATERLINE ELEVATION
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
BR_K21705_bt_98.dgn :: RB06 1/13/2026 10:07:46 AM SWolfer
� Bent 15 � Bent 19
Construct Bent 20 wall seismic retrofits. Work maybe concurrent with .
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
2. See Sheet RA03 for construction work sequence.
1. See RA and RC sheets for additional notes and details for pipe installation.
NOTES:
FL x RJ spigot spool FL x RJ bell spool
Bent 15 pipe layout See sht. RB06 for
Span 19 pipe layout See sht. RB04 for for pipe layout see shts. RB01 thru RB03 Restrained joint pipe, Existing hangers and walkway not shown for clarity
3 7
5 7
7 9
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
RB07SEQUENCE
BRIDGE WATERLINE CONSTRUCTION
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
*Install hangers and maintenance walkway prior to Waterline Phase 5.
Install air release valves.
Install upper struts and lateral restraints.
Install 36 inch DI pipe in Spans 15-19. Extend bells.
Remove existing pipe and pipe supports in Spans 15-19, leaving elbow at Bent 20. See sht. RA03 for details.
Construct Bent 15 and 19 bridge deck and joint work.
Remove existing Bent 15. Construct new Bent 15 crossbeam.
Remove existing pipe and hangers in Spans 15-18.
Remove existing maintenance walkway and install new walkway stringers and and grating.*
Install hangers in Spans 15-18. Do not install upper struts or lateral restraints.*
WWW.DOWL.COM
BR_K21705_bt_104.dgn :: RB07 1/13/2026 10:07:51 AM SWolfer
CONSTRUCTION WORK SEQUENCE
12" clearance above pipe
Assembly must fit within
(brass/bronze)
1" dia. ball valve Insulation jacket
" dia. brass pipe2
1" air release valve junction box into jacket
Heat wire, route from
12" clearance above pipe
Assembly must fit within
36"� d.i. pipe
Insulation jacket junction box into jacket Heat wire, route from
4" air and vacuum valve
4" cast iron ball valvesleeve, flange 36"x4" steel tapping
- FIPT, 90° bend
- MIPT spools
- tapped flange 4" galvanized fittings
" dia. bolts, typ.8 5 " bolts for length adjustment2
1receive
, slot to 4 1 x 2
1 x 22 1Galvanized L2 tension connections " 304 ss straps w/4
" galvanized unistrut8
36" dia. d.i. pipe
- 1" air release valve
- brass spool
- brass 90° elbow (FIPT)
- brass spool
- ball valve (FIPT) 90° elbow (install w/ teflon tape) 1" dia. direct tap, brass MIPT
Trim downturned angle at each end Trim and bend angle
59V-051
AIR RELEASE/AIR VACUUM VALVE
Scale: No Scale
AIR RELEASE VALVE
Scale: No Scale
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
RB08
Bob Goodrich, PE
Andy Howe, PE
Kevin Johnson
Brian Sevits
WATERLINE DETAILS
WWW.DOWL.COM
OREGON
RE
GI
STE
RED PROFESSIONALEN
EVIN R.OHN
SO
N2
0 , 211 A
Y
M
97292PE
BR_K21705_bt_106.dgn :: RB08 1/13/2026 10:07:55 AM SWolfer
� existing girder � waterline � existing girder
"874'-11
TYPICAL WATERLINE HANGER ELEVATION
1/2"=1'-0"Scale:
sht. RB13 for details Upper Strut, see
" dia. bolt, typ.4 w/ F436 washer for or approved equal, Undercut Anchor M10 Hilti HDA-T sht. RB12 for details Lower Strut, see
Pipe roller
" thick steel8
Pipe shield, for details see sht. RB11 Lateral Retainer, water pipe 52 ductile iron 36" dia. Class for details see sht. RB11 Vertical Hanger, for details see sht. RB14 walkway, typ.
Maintenance for details sht. RB10 Bracket, see Attachment
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
DEPTH
EFFECTIVE
FORCE (lb)
PULLOUT
MINIMUM
GRADESIZETYPESYSTEM
POST-INSTALLED ANCHOR TABLE
3.25"2,80036"2 1ExpansionMechanical
7.5"26,600HDA-T*M16UndercutMechanical
3.9"10,000HDA-T*M10UndercutMechanical
7.5"21,70055"4 3BoltResin
4"7,20060#4RebarResin
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
RB09
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
WATERLINE HANGER ELEVATION
WWW.DOWL.COM
BR_K21705_bt_102.dgn :: RB09 1/13/2026 10:08:01 AM SWolfer
Provide fiberglass walkway grating and fasteners according to the specifications.
Tighten high-strength bolts using the Turn of Nut method unless shown otherwise.
otherwise. Exclude bolt threads from shear planes.
Provide galvanized high-strength bolts according to ASTM F3125, Grade A325 unless shown
Grade 50. Hot-dip galvanize steel after fabrication.
Provide steel shapes according to ASTM A992. Provide steel plates according to ASTM A572 concrete in concrete pipe supports.4 3 Provide Class 4000 -
Provide reinforcement according to ASTM A615 Grade 60 or ASTM A706 Grade 60.
for Construction 2024".
Provide all materials and perform all work according to the "Oregon Standard Specifications
CONSTRUCTION NOTES
40 psf distributed load or 300 pound concentrated load.
Walkway design live loads:
Hanger designed according to 2022 Oregon Structural Specialty Code with SDS = 0.91.
DESIGN NOTES
WATERLINE HANGER GENERAL NOTES
*Seismic Anchor s p a c e s
"2
1 "2 s p a c e s
Stiffener Plate, typ.
W6 x 25 x 15 x 3'-3"16
PL
Undercut Anchor, typ.
dia. bolt for M10 Hilti HDA-T
"4
ASTM F436 washer for
" slotted hole and 8
" x 18
PLAN
1"=1'-0"Scale:
"4
"4
W6 DETAIL
1"=1'-0"Scale:
W6 x 25 high strength bolt
" dia.4
" dia. hole for 16
STIFFENER PLATE DETAIL
1"=1'-0"Scale:
"8
"2
" radius2
"16 x 0'-54 x 52
PL
" snip, 2 places2
W6 x 25 high strength bolt
" dia.4
" dia. hole for 16
Undercut Anchor, typ.
dia. bolt for M10 Hilti HDA-T
"4
ASTM F436 washer for
" slotted hole and 8
" x 18 x 15 x 3'-3"16
PL
Stiffener Plate, typ.
2 places
5 3'-2" of plate, typ.
1/4" from end Stop welds
ELEVATION
1"=1'-0"Scale:
4"
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OF
S
O N
OREGON
,2
N G N E R
R G I
TE
R
DPR E
SI
A L
1YL
U
JA
N
DRE
EANHO
W
D
E
60181
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
PL
AN
S
FI
NA
L R
EV
IE
W
RB10
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
WATERLINE HANGER DETAILS - 1
BR_K21705_bt_105.dgn :: RB10 1/13/2026 10:08:05 AM SWolfer
(SECTION C-C)
LATERAL RETAINER ELEVATION
1 1/2"=1'-0"Scale:
(SECTION D-D)
BOTTOM VERTICAL HANGER
1 1/2"=1'-0"Scale:
"2
1 "2 x 6 x 0'-11"2
PL
Typ.
W5 x 16 vertical hanger
W6 x 25 lower strut
(SECTION B-B)
LATERAL RETAINER PLAN
1 1/2"=1'-0"Scale:
Waterline
W6 x 25 lateral retainer in standard hole, typ.
" dia. ASTM A325 bolt2
W5 x 16 vertical hanger
(SECTION A-A)
TOP VERTICAL HANGER
1 1/2"=1'-0"Scale:
W5 x 16 vertical hanger
"2 x 6 x 0'-11"2
PL
"8
"8
Typ.
high strength bolts, typ.
" dia. 4
" dia. holes for 16
"4
1 "4
W6 x 25 lateral retainer
W5 x 16 vertical hanger
A
C
D
B B ty p
D
C
A
Waterline
VERTICAL HANGER ELEVATION
1"=1'-0"Scale:
Waterline
W5 x 16 vertical hanger
LEFT HANGER
RIGHT HANGER
x 6 x 0'-11"2
PL
x 6 x 0'-11"2
PL
.1
.1 retainer lateral
W6 x 25
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OF
S
O N
OREGON
,2
N G N E R
R G I
TE
R
DPR E
SI
A L
1YL
U
JA
N
DRE
EANHO
W
D
E
60181 to plate, not parallel to W5 x 16.
Detail view is perpendicular
NOTE:
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
PL
AN
S
FI
NA
L R
EV
IE
W
RB11
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
WATERLINE HANGER DETAILS - 2
BR_K21705_bt_113.dgn :: RB11 1/13/2026 10:08:09 AM SWolfer
"2
8'-9
E
E
"8
2 2'-11" "4
2'-7 2'-11" "8
� conn. PL � conn. PL � vertical hanger
"851'-9 "851'-9
� vertical hanger
BOTTOM STRUT ELEVATION
1"=1'-0"Scale:
Pipe roller
CONNECTION (SECTION E-E)
BOTTOM STRUT STRINGER
1 1/2"=1'-0"Scale:
OUTSIDE CONNECTION
BOTTOM STRUT
1 1/2"=1'-0"Scale:
INSIDE CONNECTION
BOTTOM STRUT
1 1/2"=1'-0"Scale:
Pipe roller
W5 x 16 stringer W6 x 25 bottom strut
"21
"212 "411
Typ.
washer, typ.
ASTM A325 bolt, w/ plate
" dia. 4 3" dia. hole for 16
W5 x 16 stringer stringer and lower strut Connection PL for splice between
" cope, typ.2
W6 x 25 bottom strut toe board8 3L6 x 6 x grating, see Specifications 4'-0" wide fiberglass stringer and lower strut Connection PL for splice between W5 x 16 stringer
A325 bolt, typ.
" dia. ASTM 4
"814"211
"215"412
"21
"412
"21
CONNECTION PLATE DETAIL
1 1/2"=1'-0"Scale:
"211"212
" cope, typ.2 bolt, typ.
" dia. ASTM A3254
3for
" slotted hole 8 7" x 116
13"4 3 x 0'-82
1 x 52
1PL
Typ.
3-1216
� conn. PL � conn. PL
"211
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
RB12
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
WATERLINE HANGER DETAILS - 3
BR_K21705_bt_114.dgn :: RB12 1/13/2026 10:08:15 AM SWolfer
"16
4'-3
D x 7 x 0'-10"4 PL W6 x 25 top strut in oversized hole, typ.
" dia. ASTM A325 bolt 4
W5 x 16 vertical hanger
TOP STRUT ELEVATION
1 1/2"=1'-0"Scale:
x 7 x 0'-10"4
PL
W6 x 25 top strut
Typ.
SECTION D-D
1 1/2"=1'-0"Scale:
D
7"
2"
"2
"2
2"
SAFETY RAIL (HANGERS #1 AND #44)
3/4"=1'-0"Scale:
"2
1'-9"Pipe, ASTM A53
2" dia. Std.
R
Pipe, ASTM A53
" dia. Std.2
2 places hanger vertical
W5 x 16 typ
5"
SAFETY RAIL CONNECTION DETAIL
3"=1'-0"Scale:
"8
1 "8 p ip e c o n n e c ti o n p la te
� W5 x 16 vertical hanger = � connection plate high strength bolts, typ.
" dia. 2
1 and W5 x 16 for
9/16" dia. holes in plate
1PL
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
RB13
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
WATERLINE HANGER DETAILS - 4
BR_K21705_bt_115.dgn :: RB13 1/13/2026 10:08:19 AM SWolfer
Bridge deck
Steel girder, typ.
toe board, typ.8 x L6 x 6 see Specfications
4'-0" wide fiberglass grating, W5 x 16 stringer, typ.
iron pipe
36" ductile
" max.2 m in m a x
WALKWAY ELEVATION
3/8"=1'-0"Scale:
L2
L=Hanger Spacing
W5 x 16 diaphragm toe board8 L6 x 6 x
W5 x 16 stringer
W6 x 25 lower strut
WALKWAY STRINGER FRAMING PLAN (ONE SIDE SHOWN)
3/4"=1'-0"Scale:
� lower strut s tr in g e r s tr in g e r
� lower strut around hanger and pipe roller Fiberglass grating, trim
Vertical hanger
Lower strut trim at lower strut toe board, 8
3 L6 x 6 x
2'-11"
Pipe roller
W5 x 16 stringer
WALKWAY PLAN AT HANGERS
1"=1'-0"Scale:
� stringer� stringer l o w e r s tr u t
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
RB14
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
WATERLINE WALKWAY DETAILS - 1
BR_K21705_bt_110.dgn :: RB14 1/13/2026 10:08:24 AM SWolfer
SECTION A-A
1/4"=1'-0"Scale:
SECTION B-B
1/4"=1'-0"Scale:
Tie-off bar
Access ladder see sht. RB16 for details
Bent walkway support, Walkway iron water pipe
36" ductile
Bent
Walkway support stringer
Walkway support stringer see sht. RB16 for details
Bent walkway support, Bent
Walkway iron water pipe
36" ductile
Walkway
� bent
(BENT 17 SHOWN, BENTS 16 & 18 SIMILAR)
BENT WALKWAY DETAILS
1/4"=1'-0"Scale:
PLAN
ELEVATION
Bent walkway support
Bent
� girder support at ladder Bent walkway
Walkway stringers, typ.
lower strut Pipe support hanger
NOTE:
Water pipe and girders not shown for clarity.
Access ladder location 17 and 18, field verify Access ladder at Bents
� bent see sht. RB16 for details Bent walkway support at ladder, Walkway stringers, typ.
Pipe support hanger
Bent see sht. RB16 for details Bent walkway support, 9" 9"
B
B
L im it s o f w a lk w a y it s o f w a lk w it s o f w a lk w it s o f w a lk w a y
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
RB15
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
WATERLINE WALKWAY DETAILS - 2
BR_K21705_bt_118.dgn :: RB15 1/13/2026 10:08:34 AM SWolfer
1'-3""2
6'-31'-3"
8""2
4'-01'-3"
NOTE:
See sht. RB12 for stringer connection plate spacing
B
B
A A
NOTE:
See Bent Walkway Support for details not shown.
"2
"4
SECTION A-A (ONLY W6X25 SHOWN)
1 1/2"=1'-0"Scale:
SECTION B-B (ONLY W6X25 SHOWN)
1 1/2"=1'-0"Scale:
only, see sht. RB12 for details
Connection Plate, span side
"2
" slotted hole, typ.8
" x 116
BENT WALKWAY SUPPORT
3/4"=1'-0"Scale:
BENT WALKWAY SUPPORT AT ACCESS LADDER
3/4"=1'-0"Scale:
W5 x 16 stringer, typ. W6 x 25 floorbeam Fiberglass walkway, typ.
Post, see details this sht.
W5 x 16 stringer, typ. Fiberglass walkway, typ. W6 x 25 floorbeam
POST DETAILS
1"=1'-0"Scale:
t y p typ.
", 2 x 8 x 1'-0" base plate2
PL
resin bonded anchors
" dia. 4
" dia. holes for 16
W6 x 25 post
"2 x 7 x 0'-72
PL
" dia. bolts4 for
" dia. holes 16
* Field verify post height.
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OF
S
O N
OREGON
,2
N G N E R
R G I
TE
R
DPR E
SI
A L
1YL
U
JA
N
DRE
EANHO
W
D
E
60181
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
PL
AN
S
FI
NA
L R
EV
IE
W
RB16
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
BENT WALKWAY SUPPORT DETAILS
BR_K21705_bt_120.dgn :: RB16 1/13/2026 10:08:43 AM SWolfer
"4
2'-10
4'-0" for details see sht. RB20
Pipe Saddle "A", W12 x 35
W10 x 45 undercut anchors, typ.
3- M16 Hilti HDA-T
A
3"
"2
"2
5" x 15 x 1'-6"4
PL
3 sides
3 sides
CROSSBEAM PIPE SUPPORT
3/4"=1'-0"Scale:
SECTION A-A
3/4"=1'-0"Scale:
NOTE:
Waterline and pipe saddle not shown for clarity.
B B
"8
1'-2 1'-6"
" dia. bolts, typ.4
" dia. holes for16
VIEW B-B
3/4"=1'-0"Scale:
NOTE:
Waterline and pipe saddle not shown for clarity.
W12 x 35
A
"8 5 x 3 x 0'-92
1 PL
at flange to web intersections Web stiffeners with 1" clip
5and web flanges Weld to undercut anchors M16 Hilti HDA-T
" dia. holes for4 x 10 x 1'-3"4
3 PL
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
WWW.DOWL.COM
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
CROSSBEAM PIPE SUPPORT
RB17
BR_K21705_bt_107.dgn :: RB17 1/13/2026 10:08:52 AM SWolfer
� pipe = � support � pipe = � support
7'-11"
"812'-11
V a ri e s t y p
1" grout pad " blockout for 2
1'-6"
V a ri e s
A307 bolt " dia. ASTM 8
7'-11" details enlargement sht. JA47 for diaphragm, see Access hole in for details see sht. RB22 Pipe saddle "C", details enlargement sht. JA47 for diaphragm, see Access hole in for details see sht. RB22 Pipe saddle "C", sht. PA10 for details Heat trace, see
3- #4 C bars
#4 hooks @ 6" into existing slab #4 L bars, resin bond
#4 C bar, rotate as required
6", typ.
3'-5" t y p
3'-1"
3'-0"
Anchor bolt, typ.
3- #4 C bars as shown
#4 hoops @ 6" and washer Leveling nut
" dia. ASTM A307 bolt8
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
PIPE SUPPORT ELEVATION
Scale: 1/4" = 1'-0"
ELEVATION, MINIMUM HEIGHT PIPE SUPPORT
Scale: 1/4" = 1'-0"
PLAN
Scale: 1" = 1'-0"
ANCHOR BOLT DETAIL
Scale: 3" = 1'-0"
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
RB18
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
BOX GIRDER PIPE SUPPORT
BR_K21705_bt_111.dgn :: RB18 1/13/2026 10:09:03 AM SWolfer
� Bent 20
200 expansion joint Existing EBAA Ex-Tend
Remove existing 5'-0" spool
36x24 Eccentric Reducer Box girder stem opening to be enlarged Existing access bend 36" ductile iron pipe Short radius flanged 90°
PLAN
1/4"=1'-0"Scale:
e x is ti n g w a te rl in e
� Bent 20 to align with base bend flange detail this sheet. Field locate Flange support block, see flange support block with double nuts iron pipe. Attach to resin-bonded anchors in Short radius flanged 90° base bend 36" ductile
36x24 Eccentric Reducer existing expansion joint to fit assembly 24" DI spool: PE x PE 15" L± 2, FCA's; adjust
200 expansion joint Existing EBAA Ex-Tend
Existing pipe stand
DI spool, FL x FL; 24" length
1'-3"
36" ductile iron pipe
Elev. = xxx.xx
Matchline, see above right
ELEVATION
1/4"=1'-0"Scale:
5"
New footing
36" bend, MJ restrained joint pipe 36" ductile iron F ie ld v e ri fy bell, 3'-0" as shown 36" ductile iron, FL x RJ
VERTICAL PIPE AT BENT 20 DETAIL
1/8"=1'-0"Scale:
Elev. = 145.38
Matchline, see below
RJ spigot x PE 36" ductile iron sht. JA82 for details Thrust cushion, see sht. JA82 for details Thrust block, see
Finished ground
FLANGE SUPPORT BLOCK
1/2"=1'-0"Scale:
ty p
1'-10" seismic 135° hooks 1-#4 hoop with typ.
5" face of existing concrete Extend anchors 8" beyond into existing concrete.
bonded anchor, typ. Install
" dia. Grade 55 resin-4
1'-4"
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
RB19
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
BENT 20 TEMPORARY CONNECTION
WWW.DOWL.COM
BR_K21705_bt_103.dgn :: RB19 1/13/2026 10:10:25 AM SWolfer
11. Install new access hatch.
and connect to existing expansion joint.
10. Remove blind flange, insert ductile iron spool and two FCA's
9. Pressure test to the 24" blind flange.
temporary air release provisions.
8. Install 24" blind flange on upper 36x24 reducer along with and thrust cushion, see sht. JA82 for details.
7. Temporarily support the lower MJ bend. Form and pour thrust block
90° MJ bend.
6. Trim vertical ductile iron pipe to length and insert into lower
5. Install and temporarily support vertical 36" D.I. pipe. Fully extend restrained joints.
support pipe as required.
reducer, and 36" 90° base bend. Adjust pipe supports and temporarily
4. Install 24" D.I. spool with flange coupling adapters, 36x24 eccentric
3. Construct Bent 20 retrofit, see sht. JA78 for details.
expansion joint. Field verify requried length of new 24" D.I. spool.
existing 90° elbow and 24" D.I. spool and cap pipe at existing
2. Remove existing ductile iron pipe from Bent 20, including
1. Remove existing box girder access cage and enlarge existing access hole.
CONSTRUCTION SEQUENCE (Phase 4)
PIPE SADDLE "A" ELEVATION
1"=1'-0"Scale:
VIEW A-A
1"=1'-0"Scale:
A
A
Saddle Plate
Plate A
Plate B
Plate C
Plate A
Plate B
Clamp Plate
Clamp Plate, PL
Saddle Plate, PL
Plate A
Plate B
Plate CBB Base Plate
Base Plate tighten snug tight double nut, typ., Grade A325 bolt with
" dia. ASTM F15544
"8
R
Backgouge S
S
B and C Typ. Plates16
3"
7"
SECTION B-B (BASE PLATE)
1"=1'-0"Scale:
1'-6"9"
" dia. bolts, typ.4
" dia. holes for16 x 6 x 3'-0", typ.8
5 PL"436 "4111 "4111
9"
"436
PLATE "A"
1"=1'-0"Scale:
R
2'-11"
5PL
PLATE "B"
3"=1'-0"Scale:
PLATE "C"
3"=1'-0"Scale:
1" chamfer, typ.
1" chamfer, typ.
1 PL
1PL
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
"412 "412
WWW.DOWL.COM
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
PIPE SADDLE "A"
RB20
BR_K21705_bt_108.dgn :: RB20 1/13/2026 10:10:50 AM SWolfer
PIPE SADDLE "B" ELEVATION
3/4"=1'-0"Scale:
VIEW A-A
3/4"=1'-0"Scale:
A
A
Saddle Plate
Plate A
Plate B
Plate CBase Plate
Plate B
B B
Plate A Plate A
Plate B
Base Plate
Plate C
3"
7"
Clamp Plate, PL
Saddle Plate, PL
Backgouge S
S
"8
R tighten snug tight double nut, typ., Grade A325 bolt with
" dia. ASTM F15544
Clamp Plate
B and C Typ. Plates16
SECTION B-B (BASE PLATE)
1"=1'-0"Scale:
" dia. bolts, typ.4
" dia. holes for16 x 15 x 3'-0", typ.8
5 PL
PLATE "A"
1"=1'-0"Scale:
2'-11"
R
5 PL
PLATE "B"
1 1/2"=1'-0"Scale:
PLATE "C"
1 1/2"=1'-0"Scale:
1" chamfer, typ.
1" chamfer, typ.
"213
"872
1 PL 2
1 PL
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
"211 1'-0" "211
"435 "435
WWW.DOWL.COM
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
RB21
PIPE SADDLE "B"
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
BR_K21705_bt_109.dgn :: RB21 1/13/2026 10:10:54 AM SWolfer
PIPE SADDLE "C" ELEVATION
1"=1'-0"Scale:
VIEW A-A
1"=1'-0"Scale:
A
A
Saddle Plate
Plate A
Plate B
B Plate C
Plate A
Plate B
B
Plate A
Plate B
Plate C
"8
R
Clamp Plate tighten snug tight double nut, typ., Grade A325 bolt with
" dia. ASTM F15544
Backgouge S
S
B and C Typ. Plates16
1Base Plate
Base Plate
7"
Clamp Plate, PL
3"
Saddle Plate, PL
SECTION B-B (BASE PLATE)
1"=1'-0"Scale:
x 15 x 3'-0", typ.8
5 PL
" dia. bolts, typ.4
" dia. holes for16
PLATE "A"
1"=1'-0"Scale:
2'-11"
R
5 PL
PLATE "B"
3"=1'-0"Scale:
PLATE "C"
3"=1'-0"Scale:
"435
"213
"873
"872
1" chamfer, typ.
1" chamfer, typ.
1PL
1PL
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
PL
AN
S
FIN
AL
RE
VI
EW
"211 1'-0" "211
3 WWW.DOWL.COM
EXPIRES: 6/30/
W
E
I E
E S
E OFS
ON
OREGON
,2004
N G N E R
R
GI
TE
RDPR E
SI
A L
1YL
U
JA
N
DRE
EANHOW
D
E
60181
RB22
PIPE SADDLE "C"
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
BR_K21705_bt_112.dgn :: RB22 1/13/2026 10:10:59 AM SWolfer
PLAN
3/4"=1'-0"Scale:
clip and bolt, typ.
Grating hold down semi-circle cutout for pipe long w/ 3'-4" dia.
3'-9" span x 2'-3"
Grating Panel A, iron water pipe
36" dia. ductile
2'-3" span x 2'-8" wide
Grating Panel C, opening, see sht. JA47
Enlarge existing access top of concrete of angle flush with
(two places), place top
Support angle, typ.
2'-3" span x 2'-1" wide
Grating Panel D, for pipe semi-circle cutout wide w/ 3'-4" dia.
" 2
3'-9" span x 2'-5
Grating Panel B, heat trace, see sht. PA10
Electrical conduit for
Hinge, typ.
A A
SECTION A-A
3/4"=1'-0"Scale:
Grating Panel C
Grating Panel D with hole for lock
Clasp plates and pin
Ladder support bar anchor, typ.
expansion
" dia. mechanical2 bracket, typ.
Attachment top of concrete place top of angle flush with
Framing angle, see sht. RB24, Hinge
GRATING PANEL DETAIL
1/2"=1'-0"Scale:
Width
S p a n
"8
2' -6
R
Pa ne l B o nl y
R
B o n ly
P a n e ls A a n d
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OF
S
O N
OREGON
,2
N G N E R
R G I
TE
R
DPR E
SI
A L
1YL
U
JA
N
DRE
EANHO
W
D
E
60181
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
PL
AN
S
FI
NA
L R
EV
IE
W
RB23
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
BENT 20 ACCESS DETAILS - 1
BR_K21705_bt_116.dgn :: RB23 1/13/2026 10:11:04 AM SWolfer
4'-4" typ.
",2
"4
3 6"
B
B
A
A
L6 x 4 x
" dia. x 3'-5" bar2
Ladder support, Two places
FRAMING ANGLE
1 1/2"=1'-0"Scale:
6"
4" 6"
4"1"
2" "2
7"
1" 1"
"2
"2
L6 x 4 x concrete anchors
" dia. 2
" dia. holes for 8
NOTE:
Field drill holes for grating hold down clip bolts. Repair galvanizing according to 02530.71.
SUPPORT ANGLE
3"=1'-0"Scale:
ATTACHMENT BRACKET
3"=1'-0"Scale:
" dia. bolt, typ.2
" dia. hole for 8 x 0'-4"2 x 32
PL
x 0'-7"2 x 42
PL
dia. concrete anchors
" 2
" dia. holes for 8
"2
"4
"8
SECTION A-A
3"=1'-0"Scale:
" clip2
L6 x 4 x two places
1" radius, typ.
support bar (beyond)
" dia. ladder2 for lock pin
" dia. hole4
PL
"4
"8 two places
1" radius, typ.
support bar
" dia. ladder2
L6 x 4 x
PL
SECTION B-B
3"=1'-0"Scale:
59V-051
EXPIRES: 6/30/
W
E
I E
E S
E OF
S
O N
OREGON
,2
N G N E R
R G I
TE
R
DPR E
SI
A L
1YL
U
JA
N
DRE
EANHO
W
D
E
60181
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
PL
AN
S
FI
NA
L R
EV
IE
W
RB24
Bob Goodrich, PE
Ben Wardell, PE
Andy Howe, PE
Brian Sevits
BENT 20 ACCESS DETAILS - 2
BR_K21705_bt_117.dgn :: RB24 1/13/2026 10:11:08 AM SWolfer
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
MARION & POLK COUNTIES
WILLAMINA-SALEM HIGHWAY
OR22: CENTER ST BRIDGE (SALEM) PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
PL
AN
S
FI
NA
L R
EV
IE
W
WWW.DOWL.COM
OREGON
RE
GI
ST
ERE
E V
IN R.OHN
S
O N2
M
97292PE
10+00" A"
A"
12+00" A"
10+00 11+00
12+00
S e e s h t.
R C
S T
A W
A
M A
T C
H L
IN
E
"A" 10+00 TO "A" 12+00 (PHASES 3 & 4)
WATERLINE - PLAN & PROFILE
Extg. ground @ �
Footing
G a s X
-i n g
G a s X
-i n g
E le c X
-i n g
X -i n g s to rm
5. See sheet D01B for existing utility information.
adjustments or any alignment or grade conflicts.
utility investigation and to make appropriate potholing. Coordinate with engineer to review
4. Provide a minimum of 24 hours notice prior to proceed without rework.
required elevation or alignment adjustments to sufficiently in…