00016406 Exhibit 6 Plans.pdf

PDF 3 MB Posted

Attached to
I-84 Eastbound: Rieth Road to OR11 Section
Solicitation number
S-73000-00016406
Issued by
Union County, Oregon

About this file

This is a paving plans document from the State of Oregon Department of Transportation for a highway improvement project in Umatilla County. The project involves paving work on the Old Oregon Trail Highway (I-84 Eastbound) from Rieth Road to OR11, with an overall project length of 0.86 miles located in Township 2 North, Range 32 East, Willamette Meridian. The project is situated between mile markers 207.80 to 210.45, with a designated no-work area from M.P. 207.44 to M.P. 210.95. The document includes comprehensive construction plans with typical sections, traffic control details, asphalt concrete pavement (ACP) specifications, and pavement marking standards. Standard drawings referenced include RD610 for ACP details, TM800 through TM861 for traffic control measures, temporary barricades, sign supports, and freeway section guidelines. The plans show detailed street layouts of Pendleton and surrounding areas with proposed work zones, including McKennon Heights, Pendleton, and Umatilla regions.

The document contains technical specifications for pavement construction methodology, including feathering and taper requirements based on posted speed limits, with taper lengths varying from 1 inch per 50 feet for 45 mph speeds to 1 inch per 100 feet for speeds exceeding 45 mph. Pavement marking specifications detail requirements for durable and high-performance markings with specific thickness and material dimensions. Traffic control device spacing tables are provided based on highway speeds ranging from 20 to 70 mph, with corresponding buffer and flare rate requirements. The plans specify use of temporary barricades, portable changeable message signs (PCMS), temporary sign supports, and traffic control measures consistent with Oregon Standard Specifications effective December 1, 2025 through May 31, 2026. All materials and construction methods must comply with current Oregon Standard Specifications and be designed under the guidance of a registered professional engineer.

View the file

Other files

File Type Posted
00016406 Exhibit 5 Specifications.pdf PDF
00016406 Sample Contract.docx DOCX document
00016406 Preliminary Results.xlsx XLSX spreadsheet
00016406 Invitation To Bid.docx DOCX document
00016406 Att A Form A 2 Bid Pricing Form.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(PVT.)

N

D

TH

'F'

D R

ST

AVE.

'C'

TH

TH

D R

T H

'E'

AVE.

S T.

ST

TH

'H'

'D'

AVE.

'B' D R

TH

MUR

IET

TA

TH

AVE.

TH

Pendair Heights

McKENNON

ST

TH

'C'

AVE.

AVE.

PL.

ST

'N'

TH

R.R

AVE.

AV

E.

(PVT.)

'B

RD.

RD

A

IR

P O R T

PL

AV

E.

PENDLETON

RD.

UNION

O

LD

A

IR

P O

R T

R D

(PVT.

HWY.

S T

T H

JAY

PERKINS

28TH

KIRK

45T H

ST.

DR

(PVT.)

AVE.

T H

S T

PACIFIC

S T.

37TH

PE

RK

IN

S

EXT.

41S T

RIVER

PER

KINS

40TH

S T.

PL.

NO. 67

DR.

39TH

LN.

S T.

S T.

KIRK

LADOW

TH

T H

ST.

S T

(PV

T.)

AVE.

JAY

CT

PL

PL

VIEW

RIV

ER

VI

EW

DR

32N D

R D

MARSHALL

AVE.

AVE.

C T.

(PV

T.)

ST.

ISA

AC

R

D S T

. PE

RK

INS

DR.

KIR

K

31S T

(PV

T.)

NYE

AV

E.

PL

AV

E.

30TH

AV

E.

S T.

R.R.

AVE.

AV

E.

SO

U

TH

G

AT

E

WEST

AVE.

G O

O D

W

IN

AVE.

T H

AVE.

S T.

A

VE

S P R

IN

G S

TH

(P

VT

ST.

(PVT.)

G A

TE

JO

H

N S T.

OLSON

PERKINS

D A Y

NYE

H W

Y

S T

D R

27TH

N O . 36

CARDEN

23R D

S T.

30TH

S T.

S T

1S

T

T H

S T

AVE.

DORIO

N

COUR

T

S T.

LADOW

S T

TH

22N D

S T

R

D

AVE

N

D

BYERS

(P

VT.)

QUINNEY

S T

AVE.

AVE.

AVE.

QUINNEY

AV

E.

RU

NNIO

N

R U N N

IO

N

1S

T

S T

20TH

PL.

QUI

NNE

Y

S T.

S T.

S T

T H

LN

DR.

22N D

19TH

R U N N

IO

N

A

VE.

CT

QUIN

NE

Y

AVE.

DR

AVE.

S T.

21S T

18TH

18TH

PL

ISAA

C

KING

TH

ST.

S T.

S T.

INGRAM

17TH

HWY.

ST.

T H

D R

S T.

S T

AVE

FURNISH

GOODWIN

HORN

16TH

G O

O D

W

IN

JOHNS

TH

P L.

S T.

PL.

DESPAIN

SK

Y

LI

N

E

TUTUI

LLA

P L.

AVE.

AVE.

LN

HAIL

EY

15TH

S T

PL.

T H

FRA

ZER

AVE.

SKY

LIN

E

14TH

D R

LN.

S T

AVE.

CARDEN

GILLIAM

FURNISH

AURA

T H

DR.

ELLIS

S T.

12TH

AVE.

S T

T H

13TH

S T.

GOODWIN

S T

HWY.

T H

S T.

BAILEY

S T.

ST.

10TH

LN.

S T

P L.

JOHNS

M A R S H

A

LL

T H

DORIO

N

S T.

GAMMA

CT.

M

AR

SH

AL

L

11TH

S T

T H

AVE

PL.

A T H E N S

HAIL

EY

8TH

PL.

S T

9TH

AVE.

T H

S T.

S T

S T.

HORN

AVE.

T H

INGRAM

S T.

S T

7TH

S T.

AVE.

T H

8TH

EMIG

RAN

T

AVE.

6TH

AVE.

AVE.

S T

AVE.

(PVT

R

D

4TH

LN.

S T.

5TH

GOODWIN

S T.

S T.

S T

M A

IN

3R D

R U N N

IO

N

AVE

S T.

NYE

2N D

S T

1S T

R D

1S T

LN.

S T.

S T

N

D

JO

H N S

M A

IN

S T.

AVE.

AVE

EL

LIS

(P V T

S T.

P L.

OWEN

MEACHAM

1S T

(PVT.)

T H

2N D

AVE

NO.

AVE

BYE

RS

CT.

S T.

3R D

2N D

P L.

S T.

(PVT

PL.

S T.

MAIN

NO.

N

D 3R

D

AVE.

S T

4TH

M A

IN

S T.

5TH

HAIL

EY

1S T

KIRK

K

IR

K

P L.

S T.

AVE

S T.

S T.

AVE.

S T

1S T

T H

S T.

JAY

(P

VT.)

AVE

(P

VT

AVE.

AV

E.

2N D

S T

W A S H

IN

G

TO

N

T H

AVE

S T.

S T.

H W

Y

T H

S T

S T.

N O . 8

R

D

BYERS

8TH

6TH

T H

S T

S T.

AVE

9TH

7TH

S T.

T H

D R

S T

S T.

3R D

8TH

D R

KIRK

T H

S T.

S T

AVE

(JUVENILE

10TH

S T.

S T

9TH

11T

H

AL

EX

AN

DE

R

INDIAN

AVE

AVE.

S T.

S T.

T H

S T

DET.

COURT

HILL

AVE.

AV

E.

T H

S T

15TH

CENT

ER

ST.

RD.

ST.

15TH

ALEXANDER

O

LD

S T

T H

RD.)

D U

M P

S T

RD

T H

PL.

S T

BYERS

BYERS

TH

S T

TH

D R

TH

AVE.

PL.

S T

T H

UNION

(PVT.)

PL.

PENDLETON

(PVT.)

(PVT.)

RIVERSIDE

P E T E R S O

N G

O A D

R D

MT.

GOAD-

M.P. 29.99

PE

N D

LE

TO

N

NO.

NO.

HWY.

HWY.

AL

PH

A

CT

VITA

CT.

ZETA

CT.

CT.

DELTA

M A R S H A

LL

LA

DOW

S T.

37TH

TH

TH

ST

21ST ST.

S T.

S T.S

T.

S T.

S T.

S T.

S T.S

T.S T.

COUR

T

S T.

S T.

S T.S T.

HAIL

EY

4TH

S T.3R

D

S T.

1S T

6TH

7TH

9TH

10TH

S T.

GOODWIN

12TH

16TH

15TH

14TH

13TH

ISA

AC

GOODWIN

N

D

S T

PERKINS

S O

U T H

G A T E

28TH

S T.

AC

C

ES

S

LI

PP

ER

T

RD

DR. W

E S

TG

A

TE

D R

GOLDEN

PIONEER

PL.

ST.

OVER

LO

OK

COUR

T

AVE.

PL.

T H

S T

T

H D

R

AVE.

3R D

4TH

5TH

O R E G

O N

2O

TH

S T.

AVE

HAILE

Y

(PVT.)

JAY

AV

E.

D R

AVE

AVE.

HORN

S T

S T

T

H DR.

T H

HWY.

NO. 6

OLD

OREGON

TRAIL

HWY.

NO. 6

OREGON

O

RE

G O N

AVE

AVE

AVE

CLOPTONRD.

MURPHY

RD.

TRAIL

OLD

RD

TH

TERRACE

N

YE

AVE

12THDR.

CT.

T H

C T.

QUINNEY

PL.

14TH

ST.

W Y

P L.

T H

TH D

R

AVE.

ST

INGRAM

FURNISH

CO

UR

T

PL

MARSHALL

JOHNS

TH

GOODWIN

AVE.

TH

'H'

(PVT.)

AVE.

'G'

'J'

'K'

RD

AVE.

GILLIAM

N O

R T H

AVE.

15TH

WESTGATE

RD

RI

VE

R

SO

UT

HGAT

E

PE

RK

IN

S

S T.

45TH

MARSHALL

CT. AVE.

MARSHALL

ST.HAIL

EY

HAILEY

OVER

LOOK

PL.

DR.

11TH

12THCT.

CREEK

ATHENST

H E T A

N

D

S T

1S T

S T

ISA

AC

D R

N

EL

SO

N

D R

HE

BR

ON

TH

PL.

AVE.

DR.

3RD

TH

S T

DESPAIN

(P

VT.)

AVE.

GATE

PENDLETON

MILE

RIVER

MILE

TREATMENT

SEWAGE

PLANT

M cKay

Cr ee k

MILE

MILE

Tutuilla

C reek

C reek

MILE

Patawa

PENDLETON

MILE

UMATILL

A

MILE

Wildh orse

Creek

UMATILLA

59V-065

M.P. 207.44

OF PROJECT

BEGINNING

M.P. 210.95

END OF PROJECT

M.P. 207.80 to M.P. 210.45

NO WORK AREA

PENDLETON

UMATILLA COUNTY

OLD OREGON TRAIL HIGHWAY

I-84 EASTBOUND: RIETH ROAD TO OR11 SECTION

ST. HELENS

ASTORIA

TILLAMOOK

MCMINNVILLE

ALBANYNEWPORT

CORVALLIS

HOOD

RIVER

DALLES

THE

MADRAS

PRINEVILLE

BEND

COQUILLE

GRANTS

PASS

Ashland

BURNS

KLAMATH

FALLS

CONDON

MORO

PENDLETON

LA GRANDE

ENTERPRISE

VALE Ontario

PORTLAND

SALEM

MEDFORD

EUGENE

ROSEBURG

Athena

N. Powder

Unity Dayville

Sisters

Juntura

Frenchglen

Burns Jct.

McDermitt

Paisley

La Pine

Crescent

Biggs

Lexington

Hermiston Boardman

Ukiah

Arlington

Malin

Brookings

Coos Bay

Drain

Canyonvil le

Reedsport

Oakridge

Goshen Florence

Lincoln City

Waldport

Home Sweet

Detroit Antelope

Maupin

Forest Grove

Hebo

Cannon Beach

Seaside Rainier

Milton-Freewater

W

26 35 197

39519

3953197

Bonanza

Junction City

BAKER CITY

HEPPNER

Copperfield

Lake Silver

Junction CaveBEACH

GOLD

Orford Port

LAKEVIEW

CANYON

CITY

Day John

CITY

OREGON

HILLSBORO

DALLAS

Redmond

Val ley Jordan

Overall Length Of Project - 0.86 Miles

T. 2 N., R. 32 E., W.M.

F

O T

N E

MTRAPED

N

O G

E R

O

N

OI

T

ATROPS

N A

R T

APRIL 2026

UMATILLA COUNTY

OLD OREGON TRAIL HIGHWAY

I-84 EASTBOUND: RIETH ROAD TO OR11 SECTION

PAVING

PLANS FOR PROPOSED PROJECT

DEPARTMENT OF TRANSPORTATION

STATE OF OREGON

ADMINISTRATION

FEDERAL HIGHWAY

DIVISION

OREGON

PROJECT NUMBER

NO.

SHEET

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

A01A01STATE

INDEX OF SHEETS

SHEET NO. DESCRIPTION

Title Sheet, Index Of Sheets & Std. Dwg. Nos.A01

BA01 Typical Sections

Traffic Control Details

STANDARD DRAWINGS

Asphalt Concrete Pavement (ACP) Details- RD610

R/W Map No. - None

Tables, Abrupt Edge and PCMS Details- TM800

EA01 thru

EA04 incl.

Temporary Barricades- TM820

Temporary Sign Supports- TM821

Temporary Sign Supports- TM822

Freeway Sections-Ramps- TM860

Freeway Sections- TM861

Pavement Marking Standard Detail Blocks- TM500

Alignment Layout: General- TM560

Durable And High Performance Pavement Markings Surface And Groove- TM521

Installed Non-Profiled

R_M26004_ts_01.dgn :: A01 3/17/2026 10:13:06 AM hwye53h

2026.03.17 11:42:38 -07'00'

2026.03.17 11:27:38

2026.03.17 11:34:20-07'00'

2026.03.17 11:35:13

2026.03.17 11:35:56

RD610

DETAILS

PAVEMENT (ACP)

ASPHALT CONCRETE

R D

.d g n

25-JUL-2017N/A

J U

L

1" in 5'

Feather base course Taper 1" in 5'

AT GRAVEL APPROACHES

METHOD OF FEATHERING ACP PAVEMENT

OR BRIDGE ENDS WHEN NOT OVERLAYING THE BRIDGE

ACP PAVEMENT MATCH AT PROJECT ENDS

METHOD OF MATCHING EXTG. ACP INLAY SURFACING

TABLE 1

METHOD A *

METHOD B *

TAPER LENGTHS

ACP wearing course

(When present)

Feather ACP base course

Extg. pvmt.

See "EDGE DETAIL"

Extg. pvmt.

wearing course thkn.

ACP unfeathered

See project plans for method.

Taper (See Table 1)

Cold plane pvmt. removal

Taper (See Table 1)

Cold plane pvmt. removal

Posted Speed Taper Length

1" per 50'45 mph

1" per 100'> 45 mph

See "EDGE DETAIL"

Extg. pvmt.

wearing course thkn.

ACP unfeathered top ACP base course

Construct non-feathered

(See "EDGE DETAIL")

Top of ACP base, Extg. pvmt.

ACP wearing course

(When present)

Feather ACP base course

Extg. gravel surfacewearing course thkn.

ACP unfeathered

Thkn. - Var. (2" to 0)

Aggr. base

Thkn. - Var. (2" to 0)

(When present)

Asph. conc. base course

(Thkn. as shown on plans)

ACP wearing course

Extg. pvmt.

Thkn. - 2"

(When present)

ACP base course e x tg p v m t.

E d g e o f

See "EDGE DETAIL"

ACP wearing courseExtg. pvmt.

See "EDGE DETAIL"

Extg. A.C. pvmt.

Cold plane pvmt. removal

(Inlay to extg. asphalt conc. pvmt.)

not acceptable

Mill edge as shown

Nom. depth

Sawcut & seal

EDGE DETAIL

the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2025 - May 31, 2026

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

Standard Drawing, while

The selection and use of this

TM500

STANDARD DETAIL BLOCKS

PAVEMENT MARKING

T M

.d g n

Changed Min. widths for CH, TM, TM-40, and TS07-2020

07-01-2020N/A

DISABLED PARKING DETAIL (white)

4" white edge line

Edge of pavement

17'

1'

20'

4"

Direction of Traffic

36° 36°

3'

4'

36° 3'

4'

LL

L

L

LL

LL

L

LLL

LL

L

TS

LL

LL

L

L

LL

4'

Direc tionofTr affic

36° 3'

L

9'

3'

8" white line

1'

20'

4'

4" 8 " white line

12'12'12'

L For traversable medianL

9'

3'

L

12'

LL

1'

' 6

1'

For Centerline

DLL DLL-2

36°

36° 3'

Direction of Traffic

BYLD

L E G E N D

36°

36°

Direction of Traffic

CH

For lane lines in drop lanes

LL

For lane lines in acceleration/deceleration lanes

40'

40'

40'

10'

10'

40'

For lane extensions and bike lane extensions For lane extensionsFor lane extensions

TM-40

30'10'

8'

40'

20'

30'

10'

40' 40'

30'

30'

(Typ.)

Wheel Stop

YD

NPL

YBWB

TWL

WD-2

NPR

ND

Direction of Traffic

YLD

TM

4 " space

NDW

Thru Traffic Side

WD

D

YW-2W

2'

4" space

36°

36°

L

4" space

4" space

4"

4"

30'

4" YELLOW LINE

4" WHITE BROKEN LINE

4" space

LL

L

L

LL

LL L

L

LL

8'8'

6'6' 6'

2'2'

8'

1' space

8'

4" YELLOW BROKEN LINE

8" WHITE LINE4" WHITE LINE

10'

40'40'

8'

2'

1'

1'

1'

8" WHITE DOTTED LANE LINE4" WHITE DOTTED LANE LINE

Yellow Line Narrow Double

Yellow Line Narrow Double

YIELD LINE (white) for field layout angle orientation for field layout angle orientationfor field layout angle orientation striping plans

Lane line dimensions are shown on the Or Thru Traffic Side

Direction Of Traffic, Increasing Stationing

1' WHITE BARS AT 20' SPACING

CHEVRON BARS

BICYCLE YIELD LINE (white)

4" YELLOW LINES

NO-PASS RIGHT

Yellow Line Narrow Double for field layout angle orientation

4" white line

R o u te

A c c e s s ib le w h ite lin e

1' WHITE BARS AT 20' SPACING

TRANSVERSE SHOULDER BARS

4" YELLOW DOTTED LINE

4" white line

1' YELLOW BARS AT 40' SPACING

TRANSVERSE MEDIAN BARS

distance between left turn refuges exceeds 200' For use at painted medians where

Increasing Stationing Increasing Stationing

Yellow Line Narrow Double

2' (Typ.)

8" WHITE DOTTED LINE4" WHITE DOTTED LINE

1' YELLOW BARS AT 20' SPACING

TRANSVERSE MEDIAN BARS

3' 5"

4" YELLOW LINES

NO-PASS LEFT

4" YELLOW LINES

TWO-WAY LEFT TURN

TWO 4" WHITE LINES

NARROW DOUBLE NO-LANE CHANGE

TWO 4" YELLOW LINES

DOUBLE NO-PASS

TWO 4" YELLOW LINES

NARROW DOUBLE NO-PASS

(thru traffic side )

HC

4.5' min.

min.

4.5' min.

4.5' min.

4.5' the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2025 - May 31, 2026

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

TM521

NON-PROFILED

SURFACE & GROOVE INSTALLED

PAVEMENT MARKINGS

DURABLE & HIGH PERFORMANCE

T M

.d g n

Changed groove width for 4 in. markings07-2021

20-JAN-2023N/A

J A

N

Top of pavement

Marking Width

Thickness Material

SURFACE INSTALLED MARKINGS

Marking Length

A

Width

Marking

Thickness Material

Depth

Groove

Marking Length Taper 3 ± 1 in.

Taper 3 ± 1 in.

General Notes:

Durable Method 'A' & Method 'D'

2) See Standard Specification 00850.46 for marking installation tolerances.

1) See Standard Drawing TM500 and/or project plans for marking length and width dimensions.

B

GROOVE INSTALLED MARKINGS

B

GROOVE INSTALLED GROOVE AND MATERIAL DIMENSIONS

SECTION B - B

Var. 25 mils

Var.

Pavement Marking Material Type Thickness Material

Groove Depth

High Performance

Recess Depth

Marking Material

Pavement Marking Material Type

SECTION A - A

to top of material from top of pvmt.

Recess depth Top of pavement

Durable Method 'A' & Method 'B' & Method 'D'

25 milsHigh Performance

Thickness

120 mils220 ± 20 mils 45 ± 5 mils

60 ± 10 mils

SURFACE INSTALLED MATERIAL THICKNESS

Marking width + 1 ± 0.125 In.

01-2023 Changed groove width back to previous width for 4 in. markings the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2025 - May 31, 2026

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2025 - May 31, 2026

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

Standard Drawing, while

The selection and use of this

= Lane line dimensions are shown on the Striping plans.

TM560

GENERAL

ALIGNMENT LAYOUT:

T M

.d g n

MODIFIED CONTROL POINTS, ADDED NEW LAYOUT REQUIREMENTS AND DETAILS07-2025

11-JUL-2025N/A

J U

L

ACCOMPANIED BY DWGS.:

TM504

TM500, TM501, TM502, TM503,

GENERAL NOTES:

three dots if the line is broken.

of permanent pavement markings. These lines will be followed by

Typical layout transition details are marked by lines denoting location4.

different pavement marking and at the end of pavement markings.

pavement markings, where pavement markings transition to a

Use pavement marking transition detail marks at the start of3.

surfaces.

white paint on asphalt surfaces and black paint on concrete pavement

Use aerosol paint to mark layout transition details and control point;2.

Use control points to make continuous narrow guideline as specified.1.

LEGEND

LL

BROKEN LINE LAYOUT TRANSITION DETAIL

NO PASS LEFT LAYOUT TRANSITION DETAIL

TWO WAY LEFT LAYOUT TRANSITION DETAIL

LAYOUT TRANSITION DETAIL

DOUBLE LINES 4" TO 12" WIDTH

SOLID LINE LAYOUT TRANSITION DETAIL

ND D

WB YB WD YD DLL DLL-2 WD-2

W Y W-2

NPL NPR

TWL

INCREASED STATIONING

THRU TRAFFIC SIDE

THRU TRAFFIC SIDE

TANGENT SECTIONS

CONTROL POINT LAYOUT

CURVE SECTIONS

CONTROL POINT LAYOUT

CONTROL POINT

LL

Control points, typ.

40' maximum 40' maximum 40' maximum

Control points, typ.

mumixam'52 mumixam'52 mumixam'52

12" to 24"

LL

LL

See General Note 2

LL

LL

LL

LL

LL

INCREASED STATIONING

THRU TRAFFIC SIDE

NDW

NO PASS RIGHT LAYOUT TRANSITION DETAIL

LL

EXAMPLE LAYOUT TRANSITION DETAIL

Control point details above

See control point spacing

LL

LL for transversable medianND

LL for centerlineND typ.

6"-12"

See General Note 2

TM800

PCMS DETAILS

TABLES, ABRUPT EDGE AND

T M

.d g n

12-JUL-2024N/A

J U

L

Freeway

Use aggregate wedge when abrupt edge is 2 inches or greater.

four feet wide protect longitudinal abrupt edge as shown.

When paved shoulders adjacent to excavations are less than

NOTES:

shoulder, as far as practical.

Place cart / generator / power supply off of the on 10' spacing.

Use six tubular markers in shoulder taper outside shoulder, where practical.

Install Flagger Station Lighting beyond the

2" or GreaterExtg. pavement aggregate base rock

Shoulder or message sign (PCMS)

Portable changeable

20'

100'

4' B(III)R

Temp. Plastic Drums

Lighting

Flagger Station

50'

10'

Markers

28" Tubular

Place roll-up signs in advance of barricades.

plaques to the sign face using hook and loop fasteners.

If roll-up signs are used, attach the correct (CW21-9) throughout excavation area at spacings shown.

Continue signing and other traffic control devices

"RIGHT" (CW21-8C) riders with "LEFT" (CW21-8A) riders.

8' B(III)R barricades with 8' B(III)L barricades and replace the

If the excavation is located on left side of traffic, replace the abrupt edges of 1 inch or greater.

or other roadway work. Use abrupt edge signing for longitudinal

Abrupt edges may be created by paving, operations, excavations

GENERAL NOTES FOR ALL TCP DRAWINGS:

for max. spacing.

See TCD Spacing Table

Temp. Plastic Drums for max. spacing.

See TCD Spacing Table

28" Tubular Markers

UNDER TRAFFIC

UNDER CONSTRUCTION

EXCAVATION ABRUPT EDGE SIGN (PCMS) INSTALLATION

PORTABLE CHANGEABLE MESSAGE

LIGHTING DELINEATION

FLAGGER STATION

Sl.1:3

TAPER TYPES & FORMULAS

TEMPORARY BARRIER FLARE RATE TABLE

TAPER FORMULA

Merging (Lane Closure)

Shifting

Shoulder Closure

Flagging (See Drg. TM850)

Downstream (Termination)

"L"

"L"3 1"L"/3 or

50' - 100'

Varies (See Drawings)

"L"2 1"L"/2 or the Speed from the Tables below:

Use Pre-Construction Posted Speed to select

For Lane closures where W < 10', use "L" value for W = 10'.

Limit spacing adjustments to 30% of the "A" dimension for all speeds.

When necessary, sign spacing may be adjusted to fit site conditions.

Place traffic control devices on 10 ft. spacing for intersection and access radii.

NOTES:

SPEED (mph) MINIMUM FLARE RATE

M I N I M U M L E N G T H S T A B L E

"L" VALUE FOR TAPERS (ft) BUFFER "B" (ft)W = Lane or Shoulder Width being closed or shifted

20:1

19:1

18:1

16:1

14:1

12:1

10:1

9:1

8:1

FREEWAYS

SPEED (mph) W = 12 W = 14 W = 16

TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE

20 - 30

35 - 40

45 - 55

60 - 70 700

100 100

15001000 2640

100 20

Device Spacing (ft)

Max. ChannelizingSign Spacing (ft) SPEED (mph)

A B C

CW21-8A

(As noted)

36x18

C W

(Mount on TSS)

(As needed)

42x18

CW21-8C

OR

C

W

Plaques

CW21-9

Abrupt edge

8' B(III)R 8' B(III)R

mi.4 1mi.4

1mi.4

EDGE

ABRUPT

RIGHT

LEFT

(Roll-up sign)

(As needed)

EDGE

ABRUPT 32x11

32x11

32x11

CENTER

RIGHT

LEFT

10≤W

30≤

W/60, S = Speed, W=WidthS45: L = WS, Speeds < 45: L =≥formula, for Speeds For Shoulder closures where W < 10', use "L" value for W = 10' or calculate "L" using

TYPICAL ABRUPT EDGE DELINEATION

Smart Work Zone Systems Portable Traffic Signals

Detail as shown is used for trailered and non-crashworthy components of:

barricade may be omitted when PCMS is placed behind a roadside barrier.

Use six drums in shoulder taper on 20' spacing. The drums and

Left shoulder, use Type B(III)L Right shoulder, use Type B(III)R Use the appropriate type of barricade panels for PCMS location.

Install PCMS beyond the outside shoulder, when possible.

To be accompanied by Dwg. Nos. TM820 & TM821.

divided highways or freeways when positive protection is not available, or as directed.

Provide a truck mounted attentuator (TMA) to protect the active work area on high speed

Flaggers, Traffic Control Measures, or as directed.

Coordinate and control pedestrian movements through a Temporary Accessible Route using

Combine drawing details to complete temporary traffic control for each work activity.

Do not locate sign supports in locations designated for bicycle or pedestrian traffic.

High speed highways have a pre-construction posted speed of 45 mph or higher.

Low speed highways have a pre-construction posted speed of 40 mph or less.

All other signs mounted on barrier sign supports shall not exceed 12 sq. ft. in total sign area.

All diamond shaped warning signs mounted on barrier sign supports shall be 36" by 36".

background of all temporary warning signs.

Use fluorescent orange sheeting for the All signs are 48" x 48" unless otherwise shown.

to indicate traffic movements.

Arrows shown in roadway are directional arrows sequential arrow boards.

Place a barricade approx. 20' ahead of all shown are the minimum required.

Signs and other Traffic Control Devices (TCD)

07-2022 Added a note for TPARs

07-2024 Added a note for TMAs the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2025 - May 31, 2026

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

TM820

TEMPORARY BARRICADES

T M

.d g n

01-JUL-2020N/A

J U

L

LC

CL

CL

CL

sheeting on rail encapsulated lens

White and orange

Extg. ground

" 6 m in m in m in m in

V a r

4' min. - 8' max.

m in

V a r m in

"6 m in

24" min. - 48" max.

sheeting on rail encapsulated lens

White and orange

Extg. groundExtg. ground sheeting on rail encapsulated lens

White and orange

M in

V a r

"6

24" min.

direction toward which traffic must turn in detouring.

it is desirable that the stripes slope downward in the

Where a barricade extends entirely across a roadway, at an angle of 45° in the direction traffic is to pass.

Markings for barricade rails shall slope downward directions from the center of the barricade.

slope the chevron striping downward in both

Where both right and left turns are provided for, local road users.

across roadway unless access is required for may be used. Extend barricades completely

For full roadway closures, the C or LR barricade

NOTES:

Traffic Traffic

(For approaching traffic)(For approaching traffic)

(For approaching traffic)

Traffic

(For approaching traffic)

Traffic

BARRICADE RAIL LAYOUT

DIAGRAM FOR BARRICADE PLACEMENT AND SLOPE MARKING

BARRICADE NOTATION

B(III)R

LT. SIDE - L

CLOSED - C LT. / RT. - LR

RT. SIDE - R

TYPE I TYPE II TYPE III

is signed according to the TCP. See Dwg. No. TM844.

closed and a temporary pedestrian accessible route (TPAR)

Do not place barricades in sidewalks unless sidewalk is facility is properly closed and signed.

Do not block bike lanes or shoulders unless the space is limited.

Use 4' Type III barricades where horizontal

Use barricades from ODOT Qualified Products List (QPL).

Rails must be 8" min. to 12" max. in height.

For rails less than 36" long, 4" wide stripes shall be used.

from barricade.

Ballast shall not extend above bottom rail or be suspended may be placed on lower frame to provide additional ballast.

Sandbags (approximately 25 lb sack filled with sand)

GENERAL NOTES FOR ALL DETAILS:

Barricade type

Barricade on the roadway

Indicates barricade placement the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2025 - May 31, 2026

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

TM821

TEMPORARY SIGN SUPPORTS

T M

.d g n

14-JUL-2023N/A

J U

L

4"x 4"x 12'

2 - 2"x 4" @ 45° angle

2"x 6"x 37"

36"

Sandbags per side (typ.)

lag screw

"x 3"8 31 -per side (typ.)

" dia. bolts8 32 -screw per side (typ.)

"x 3" lag8 31 -per support (typ.)

"x 3" lag screws8 32 -

"x 37"2 1"x 54 sign (typ.)

48"x 48" sign area of 20 sq. ft. or less.

Use Double Post TSS for a total

NOTES:

per support (typ.)

2 - 3/8" dia. bolts per support (typ.)

2 - 3/8" dia. bolts

4 - 2"x 6"

40"

"2 12 - 4"x 4"x 5

NOTES:

2' - 8" Sandbags

2' - 6"

A

"4

" - 12 ga. PSST2

" - 12 ga. x 4" PSST Stub2

PSST Stub

" - 12 ga. x 4"2 12 A

See DETAIL A

" - 12 ga. PSST4

" - 12 ga. PSST4 sign (typ.)

48"x 48" per support (typ.)

" dia. bolts8 3Two, support (typ.)

joining brace and

" dia. bolt8

NOTES:

1 - 2"x 4"

1 - 4"x 4"x 4"

2 - 2"x 4"

1 - 4"x 4"x 4"

1- 2"x 4" 40"

Sandbags lag screws

"x 4"8 34 -

4"x 4"x 10'

"x 3" lag screws8 32 -

2"x 4"x35" @ 45° angle

2"x 4"x 6"

"x 3" lag screws8 32 -

"x 4" lag screws8 34 -

" dia. bolts8 31 -

" dia. bolts8 31 -

" dia. bolts8 32 -

" dia. bolts8 31 -sign (typ.)

36"x 36"

" dia. bolts8 32 -

TEMPORARY SIGN SUPPORT GENERAL NOTES:

Sheeting

Retroreflective

Sheeting

Retroreflective

" Sheeting

Retroreflective m in and Right sides)

Sheeting (Left

Retroreflective

NOTES:

SIGN POST REFLECTIVE SHEETING PLACEMENT

Sheeting

Retroreflective Sheeting

Retroreflective signs. Do not mount signs on Type II or III Barricades.

Use Single Post TSS for mounting "Business Access" (CG20-11)

Use Single Post TSS for a total sign area of 12 sq. ft. or less.

Sheeting may be applied directly to post material; or applied to a rigid, lightweight substrate, then securely attached to the posts.

for wood post TSS's. Use 2" wide sheeting for PSST TSS's.

Apply sign post retroreflectivity to each TSS post facing front; and to the left and right sides of the TSS, as shown. Use 3" wide sheeting and "DO NOT ENTER". For "STOP" and "DO NOT ENTER" signs, used red ANSI Type III or IV retroreflective sheeting on the TSS posts.

Apply fluorescent orange, ANSI Type VIII or IX retroreflective sheeting to TSS posts, as shown, for all temporary signs, except "STOP"

Use A325 Bolts or equivalent.

welding. Repair Galvanizing according to ASTM A780.

designation G90. Remove Galvanizing from steel before

Galvanize steel according to ASTM A653 with coating

All members shall have a minimum yield stress of 50 ksi.

Use PSST TSS's for a total sign area of 16 sq. ft. or less.

Society (AWS) D.1.1.

Weld steel according to American Welding

" - 12 ga. x 4" PSST Stub.2 1inside of the 2

" PSST4

1Do not use bolt to secure 2

" - 12 ga. x 4" PSST Stub.2 1inside of the 2

" - 12 ga. PSST to extend entire length4

See Dwg. No. TM204 for flag board mounting detail.

(25 lb. max per bag) (min. 100 lbs per side of each TSS).

Place a minimum of 50 lbs of sandbags on each of the four TSS supports legs.

TSS posts.

away from traffic, or cover the sign. Do not cover reflective sheeting on the

When not in use, locate TSS as far from Public Traffic as practicable and turn

Do not place or stack ballast more than 24" above the ground.

See "Temporary Sign Placement" detail on TM822 for sign installation heights.

four sides (S4S) and free of heart center (FOHC).

For wooden TSS's, use either Douglas Fir or Hem Fir, which is surfaced

Do not locate TSS's in locations that block pedestrian or bicycle traffic.

Do not tip over TSS at any time.

Double Post Perforated Steel Square Tube (PSST) Single Post

DOUBLE POST DETAIL PERFORATED STEEL SQUARE TUBE (PSST) DETAIL SINGLE POST DETAIL

Front Right Left Front FrontRight Left Side

(No Scale)

DETAIL A

" - 12 ga. PSST4

" - 12 ga. PSST2

A A

(No scale)

SECTION A-A

the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2025 - May 31, 2026

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

TM822

TEMPORARY SIGN SUPPORTS

T M

.d g n

01-JUL-2020N/A

J U

L

¼ ¼ as shown.

pedestrian pathway, maximum of 4" into it may extend a

7' above the sidewalk is installed less than

If bottom of plaque

B a c k o f c u rb m in m in

3' (min.)

4" max. *

2' (min.)

width is less than 6'

2' min. when the shoulder

6' - 12'

E d g e o f tr a ff ic l a n e m in m in . R

/W

1' min.

Urban Areas With Curb/Sidewalk surface, as shown.

minimum of 7'0" above pavement

(plaque) so bottom of sign is a bicycle traffic, install secondary sign shoulder or other surface used by adjacent to or intrude into a paved

Where temporary signs are located

E d g e o f tr a ff ic l a n e

Shoulder

Paved m in

R /W

1' min.

6' - 12'

E d g e o f tr a ff ic l a n e m in m in

TEMPORARY SIGN PLACEMENT

L 2-1/2"x 2-1/2"x 5/16"

"8 d eg head and clip

" dia. pin wth4

"16 5"x2

1"x 22 1L 2

"2

"16 5"x2

1"x 22 1L 2

" Sch. 40 pipe2 1210"

"2

"2

6" max.

of total sign area) (or, max. 12 sq. ft.

36" x 36" sign

2" Sch. 40 pipe

" Sch. 40 pipe2

Conc. Barrier

NOTES:

CONCRETE BARRIER SIGN SUPPORT

other than concrete.

Follow manufacturer recommendation when installing signs on barrier

Do not use clipped signs.

Weld steel according to American Welding Society (AWS) D.1.1.

Place support at connection between two concrete barrier sections.

Use for supporting a maximum 12 sq. ft. of total sign area.

Support fits both 32" and 42" tall "F" barrier.

All structural steel shall conform to ASTM A36.

and pinned when not in use.

Drill additional holes so sign can be rotated 90 degrees

To be accompanied by Dwg. Nos. TM670, TM671, TM687, TM688 & TM689.

according TCP Design Manual, MUTCD, ADA, or as directed.

Do not block bicycle lanes, sidewalks, or TPAR's with sign supports. Maintain minimum widths for these facilities

Rural Areas

Bicycles On Shoulder Rural or Urban Areas - Curb or No Curb

No Curb/Sidewalk Divided Highway/Freeway Medians the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2025 - May 31, 2026

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

TM860

FREEWAY SECTIONS - RAMPS

T M

.d g n

01-JUL-2020N/A

J U

L

MPH

(As needed for flaggers)

2'

TO STOP" (W3-4) sign.

used only in conjunction with the "BE PREPARED

The "FLAGGER" (CW23-2) symbol sign shall be

"ON RAMP" (W13-4P) plaque below the sign.

is installed on the crossroad, add an

If "ROAD WORK AHEAD" (W20-1) sign

NOTES:

See Highway Design Manual Comfort Speed Table 3-5.

by radii of ramp curve(s) and superelevation rate(s).

Speed designation shall be the comfort speed as required

GENERAL NOTES FOR ALL DETAILS:

UNDER TRAFFIC

UNDER CONSTRUCTION

SECTION D-D

Construction Under

2'

"B"

Buffer

OFF-RAMP

ON-RAMP

(All stages)

36x24

R2-6aP

(All stages)

36x36

W13-4P

(All stages)

24x24

W13-1P

(As needed)

(Mount on TSS)

42x18

CW21-8c

(All stages)

(Mount on TSS)

48x36

E5-2

C W

W

W

W

C W

W

W

W a

C B A 2

A

2'

Traffic Under

Construction Under

2 - 8' B(III)R C

C

D

D

Traffic Under

Construction Under

Traffic Under

2'

8' B(III)L

B

B

8' B(III)R

A

A

A

"L"

0'±

8' B(III)R

"B"

Buffer

"L"

Taper

"B"

Buffer

1 MILE

WORK

ROAD

MILE2

WORK

ROAD

DOUBLE

FINES

RAMP

ON

NARROWS

RAMP

EDGE

ABRUPT

RIGHT

OPEN

EXIT

XX

Traffic Under

Construction Under

Taper

STOP

PREPARED

BE

TO

AHEAD

WORK

ROAD

CLOSED

SHOULDER

RIGHTDOUBLE

FINES

AHEAD

WORK

ROAD

(All stages)

36x24

R2-6aP

W

"L"

"L"

"L"

C B A

W bAHEAD

CLOSED

SHOULDER

RIGHT

CONTROL DEVICES (TCD) SPACING TABLE" on Dwg. No. TM800.

To determine sign spacing A, B, and C, use "TRAFFIC

Flaggers are not permitted to stop or hold freeway traffic.

on Dwg. No. TM800 to determine Taper Length ("L") and Buffer Length ("B").

Unless otherwise shown, use the "MINIMUM LENGTHS TABLE" for Concrete Barrier Sign Support Details.

a maximum 12 sq. ft. of total sign area. See Dwg. No. TM822

Use Concrete Barrier Sign Supports for mounting signs with with the work areas, shall move with the work areas.

Signing and other TCD shown to be installed in conjunction

To be accompanied by Dwg. Nos. TM820 & TM821.

clearance between channelization devices, or as directed.

During partial ramp closures provide a minimum of 16' of horizontal or as directed.

at the active work area. Locate TMA per manufacturer's instructions, A Truck Mounted Attenuator (TMA) may be used for additional protection signing shall be in feet or miles.

Speeds shown on signing shall be in MPH. Distances shown on

(All stages)

48x24

CG20-2A

ROAD WORK

END

48x24

CG20-2A

ROAD WORK

END

Stage I Stage II

Stage I Stage II

SECTION A-A SECTION B-B

SECTION C-C

TM800 for max. spacing.

See TCD Spacing Table on

Temp. Plastic Drums

Temp. Plastic Drums

Median

Median Median

Median the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2025 - May 31, 2026

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

TM861

FREEWAY SECTIONS

T M

.d g n

01-JUL-2020N/A

J U

L

"L"

2'

W 8-

NOTES:

EDGE

ABRUPT

(All stages)

36x24

R2-6aP

B A 2 A

30'±30'±

300'±

30'±

300'±

Median

A

A

A

AC B A

See INSET "A"

Median mi.±2

30'±30'±30'±

8' B(III)R 8' B(III)R

under construction

End of area under construction

Start of area traffic adjacent to

Abrupt edge

Use "LEFT SHOULDER CLOSED" sign.

For left shoulder work, place TCD to close the left shoulder.

NOTE:

Sequential Arrow

(Mount on TSS)

(As needed)

(Mount on TSS)

(Mount on TSS)

C W

C W

W a

W a

W

(Roll-up sign)

CW21-9

32x11

32x11

32x11

(All stages)

36x24

R2-6aP

(All stages)

36x24

R2-6aP

W

W

W

W

W

W

W

W

Traffic

Under

Construction

Under

1000'

Taper

"B"

Buffer

"B"

Buffer

"B"

Buffer

"B"

Buffer

"B"

Buffer

AHEAD

WORK

ROAD

DOUBLE

FINES

CLOSED

SHOULDER

RIGHT

CLOSED

SHOULDER

RIGHT

"L"

RIGHT

LEFT

CENTER

AHEAD

WORK

ROAD

DOUBLE

FINES

½MILE

CLOSED

RIGHT LANE

½MILE

CLOSED

RIGHT LANE

AHEAD

WORK

ROAD

DOUBLE

FINES

(As needed)

54x18

CW21-8B

EDGE

ABRUPT

CENTER

(As needed)

54x18

CW21-8B

EDGE

ABRUPT

CENTER

BUMP

(As needed)

BUMP

(As needed) W

W

GENERAL NOTES FOR ALL DETAILS:

To be accompanied by Dwg. Nos. TM820, & TM821.

signed by the State Traffic Engineer.

* Regulatory speed reductions on State Highways require a Speed Zone Order

*Temp. Regulatory Speed Zone Reductions.

work zone, including; PMCS, Radar Speed Trailers, Advisory Speed signing, Additional traffic control devices may be used, as directed, to enhance the area. Locate TMA as per manufacturer's instructions, or as directed.

Truck Mounted Attenuator (TMA) should be used to protect the active work

AHEAD" (W20-5) signs and the appropriate "LEFT LANE ENDS" (W4-2) signs.

For work in the left lane, place TCD to close the left lane. Use "LEFT LANE CLOSED

UNDER CONSTRUCTION

UNDER TRAFFIC

Median

C

30'±

(All stages)

36x24

R2-6aP

W

DOUBLE

FINES

AHEAD

WORK

ROAD

W bAHEAD

CLOSED

SHOULDER

RIGHT

W bAHEAD

CLOSED

SHOULDER

RIGHT

unless otherwise directed.

For Freeway preservation work use Dwg. No. TM880, Remove rumble strip according to the plans and Dwg. No. TM830.

Do not stage traffic across longitudinal shoulder rumble strips.

plaques to the sign face using hook and loop fasteners.

If roll-up signs are used, attach the correct (CW21-9) where applicable.

"BUMP" (W8-1) signs to be installed on both sides of highway throughout area under construction where applicable.

mile intervals2 1to be installed on both sides of highway at

Additional ''ABRUPT EDGE''(CW21-(7,9)) signs with appropriate riders of 1 inch or greater.

Use "ABRUPT EDGE" (CW21-(7,9)) signing for longitudinal abrupt edges

CONTROL DEVICES (TCD) SPACING TABLE" on Dwg. No. TM800.

To determine sign spacing A, B, and C, use "TRAFFIC on Dwg. No. TM800 to determine Taper Length "L" and Buffer Length "B".

Unless otherwise shown, use the "MINIMUM LENGTHS TABLE"

TM822 for Concrete Barrier Sign Support details.

with a maximum 12 sq. ft. of total sign area. See Dwg. No.

Use Concrete Barrier Sign Supports for mounting signs with the work areas, shall move with the work areas.

Signing and other TCD shown to be installed in conjunction

Flaggers are not permitted to stop or hold freeway traffic.

48x24

CG20-2A

ROAD WORK

END

48x24

CG20-2A

ROAD WORK

END

SHOULDER CLOSURE

Divided Highway or Freeway

ONE LANE CLOSURE

Divided Highway or Freeway

(Signing Detail)

INSET "A"

SECTION A-A

on 40' max. spacing.

Temp. Plastic Drums the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: December 1, 2025 - May 31, 2026

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

M26004_A01
M26004_BA01-FLAT
M26004_EA01-FLAT
M26004_EA02-FLAT
M26004_EA03-FLAT
M26004_EA04-FLAT
RD610
TM500
TM521
TM560
TM800
TM820
TM821
TM822
TM860
TM861

File details come from the government source that posted it. Updated .