This is a project specifications document for the Oregon Department of Transportation (ODOT) detailing the I-84 Weatherby to Ontario MBM 2026 Project, a bridge resurfacing initiative along Interstate 84. The project requires contractors to supply all labor, equipment, and machinery necessary to resurface four separate bridge sections located at mile posts 337.27, 370.00, 375.80, and 376.00, with asphalt concrete pavement (ACP) quantities of 7 tons, 68 tons, 240 tons, and 130 tons respectively, for a total of 445 tons. The project is scheduled to commence on June 8, 2026, with substantial completion required by June 30, 2026, and final completion by July 13, 2026. Contractors are solely responsible for inspecting project sites prior to submission; a pre-bid conference is not required. Work must commence within ten working days of the pre-work conference following issuance of the Notice to Proceed. Construction sequencing is contingent upon ODOT District 14 Bridge Crew scheduling, requiring coordination with State Project Manager Jesse Collins at 541-881-7576.
The project is governed by the 2024 Oregon Standard Specifications for Construction with specified modifications addressing environmental protection, emulsified asphalt tack coat requirements, and asphalt concrete pavement acceptance procedures. Key technical requirements include use of approved emulsified asphalt materials with maximum 1:1 dilution ratios, optional aggregate treatment using latex polymer or liquid anti-stripping additives as alternatives to lime treatment, and strict adherence to paving practices including longitudinal joint placement and wearing course sawcutting specifications. Approximately 1 ton of emulsified asphalt tack coat will be required, with no separate payment provided. ODOT will provide temporary traffic control, and contractors must maintain a responsible party on-site capable of making job decisions and providing daily activity summaries upon request. No separate payments will be made for asphalt cement or emulsified asphalt tack coat; these costs must be incorporated into the overall bid price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00016247 Invitation To Bid.docx | DOCX document | |
| 00016247 Sample Contract.docx | DOCX document | |
| 00016247 Addendum 1.docx | DOCX document | |
| 00016247 Exhibit 6 Plans.pdf | ||
| 00016247 Exhibit 6 Plans.Revised.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SPECIFICATIONS
I-84: Weatherby to Ontario MBM 2026 Project
State Highway Number
Route Number
Estimated Bridge Mile Post Location
Estimated
ACP
Quantity (Tons) Project Manager Phone No.
I-84
337.27 370.00 375.80 376.00
7 Tons 68 Tons
240 Tons 130 Tons
Jesse Collins (See above)
541-881-7576
Tentative Start Date: June 8, 2026 (coordinate with State Project Manager, listed above) Substantial Completion: June 30, 2026 Final Completion Date: July 13, 2022
Description
Scope - This project scope consists of supplying all labor, equipment and machinery as necessary for resurfacing various bridges along I-84 between MP 337.27 and MP 376.02 according to the 2024 Oregon Standard Specifications for Construction and modifications listed in these contract documents. ODOT to provide temporary traffic control.
2024 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION: The 2024 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed technical specifications that apply to this Invitation To Bid and resulting Contract.
Some sections of the technical specifications are identified and modified below. Sections of the technical specifications not identified below remain applicable to the Contract according to their original terms. Part 00100 of the Standard Specifications (General Conditions) is not applicable to the Contract unless otherwise noted below; however, if a technical specification (Parts 200 and beyond) references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the technical specification. The Standard Specifications are available online:
http://www.oregon.gov/ODOT/HWY/SPECS/Pages/standard_specifications.aspx
General - The Contractor shall always have a responsible party on the job while work is in progress, capable and with authority to make job-site decision as an official Contractor's representative. The Contractor shall provide the State Project Manager with a summarization of activities and work performed daily if requested.
The Contractor shall carry on the work and adhere to the contract schedule during all disputes or disagreements with the State. No work shall be delayed or postponed pending resolution of any disputes or disagreements, except as specifically permitted by the specifications or as Contractor and State may otherwise agree in writing.
The Contractor shall meet with the State Project Manager(s) for a pre-work conference at a time mutually agreed upon. Work shall commence within ten working days of this meeting, providing the Notice to Proceed has been issued. A pre-bid conference will not be required. Bidders are solely responsible for inspecting the sites prior to bidding. In no event shall failure to inspect the site constitute grounds for charges to the State more than the bid price. The Project Manager will be as listed above for the section they will be in.
Construction - Construction sequencing will be dependent on ODOT District 14 Bridge Crew scheduling;
coordinate with the State Project Manager(s) accordingly. Place ACP according to SECTION 00745.
SECTION 00210 - MOBILIZATION
Comply with Section 00210 of the Standard Specifications.
SECTION 00290 – ENVIRONMENTAL PROTECTION
Comply with Section 00290 of the Standard Specifications modified as follows:
00290.30 Pollution Control – Replace the paragraph that begins "Prevent, control, and abate…" with the following paragraph:
Prevent, control, and abate pollution of the environment.
00290.30(a)(1) General - Replace this subsection, except for the subsection number and title, with the following:
• Do not allow any foreign substances or objects to enter waters of the State and U.S. that exceed regulated or permit limits.
• Do not cause turbidity in waters of the State and U.S. that exceeds regulated or permit limits.
SECTION 00730 - EMULSIFIED ASPHALT TACK COAT
Comply with Section 00730 of the Standard Specifications modified as follows:
00730.11 Emulsified Asphalt – Replace the sentence that begins “Furnish CSS-1, CSS-1h…” with the following sentence:
Furnish CSS-1, CSS-1h, CMS-2, CMS-2S, CMS-2h, CRS-1, CRS-2, HFRS-2, HFMS-2 or HPTC as selected by the Contractor.
Replace the paragraph that begins “Dilution of the tack coat …” with the following paragraph:
Except for HPTC, dilution of the tack coat material may be allowed to a maximum 1:1 ratio. Determine the proportion of water to be added to the Emulsified Asphalt. Do not dilute the Emulsified Asphalt until the Engineer approves the dilution ratio. Add the water to the Emulsified Asphalt and mix according to the asphalt Supplier. For HPTC, dilution of the tack coat material is allowed only by the asphalt Supplier at a ratio meeting the requirements of ODOT's publication Standard Specifications for Asphalt Materials.
00730.90 Payment - Replace this subsection, except for the subsection number and title, with the following:
No separate or additional payment will be made for Emulsified Asphalt tack coat. Approximately 1 Ton of Emulsified Asphalt in tack coat will be required on this Project.
SECTION 00745 - ASPHALT CONCRETE PAVEMENT - STATISTICAL ACCEPTANCE
Comply with Section 00745 of the Standard Specifications modified as follows:
00745.11(b) Asphalt Cement Additives - Delete the bullet that begins “Anti-stripping asphalt cement…”
Add the following subsection:
00745.11(d) Aggregate Treatment - Latex Polymer - A latex polymer Aggregate treatment Material may be used to treat new crushed Aggregates instead of lime if Tensile Strength Ratio test results on the mixture with the latex polymer treatment at the JMF meet the minimum criteria in 00745.13(a).
(1) General:
a. Provide a system to automatically meter the latex emulsion at the proper rate and apply the emulsion uniformly to the Aggregate prior to the addition of the asphalt cement. Follow manufacturer's recommendations to set up, adjust, and calibrate the Equipment.
b. Demonstrate to the Engineer's satisfaction that the required application rate of latex solids is being met. If it is not, take corrective action. Document and notify the Engineer of the corrective action.
(2) Material - Use latex polymer emulsion concentrate meeting the following:
Minimum Maximum Test Method
Solids Percent 65.0 – ASTM D 1417 pH 9.0 11.0 ASTM D 1417 Brookfield Viscosity 500 3000 ASTM D 1417 Spindle 3, 20 RPM, cPs
Provide a quality compliance certificate for the polymer latex emulsion concentrate to the Engineer according to 00165.35.
(3) Application Rate - Apply the latex emulsion to achieve a minimum of 0.75 pounds of latex solids per Ton of new Aggregate (0.0375%) for dense graded mixtures and a minimum of 0.50 pounds of latex solids per Ton of Aggregate (0.025%) for open-graded mixtures. Higher application rates may be required to meet minimum TSR limits. Determine application rate during mix design testing.
(4) Treatment During ACP Production:
a. Adjust Aggregate moisture content to meet the manufacturer's recommendation for emulsion application. Apply the latex emulsion at the minimum rate specified above or at a higher rate if TSR testing indicates a higher rate is required.
b. Apply the latex emulsion to the Aggregate just prior to entry into dryer drum. Mix Aggregate with the emulsion in a pugmill or in the dryer drum prior to application of asphalt cement. Heat Aggregates to at least 250 °F after treatment and prior to addition of asphalt cement.
Add the following subsection:
00745.11(e) Liquid Anti-Stripping Additive - An asphalt cement liquid anti-stripping additive (LASA) may be used instead of lime treatment of Aggregate.
(1) General - For LASA to be considered for use, meet the following criteria:
• Be designated as an asphalt anti-strip additive, with test results posted on the Warm Mix Asphalt Technologies category on the AASHTO Product Evaluation and Audit Solutions (APEAS) website.
• APEAS test results indicate an increase of 10 percent or greater in TSR (AASHTO T 283) performed on durable Aggregate, not limestone.
• Be approved for use by another State DOT as an anti-stripping additive.
If a product meets these criteria, it may be used in the JMF development according to the ODOT Contractor Mix Design Guidelines for Asphalt Concrete. The standard addition rate of LASA for the JMF is the rate used in the APEAS testing. If no rate is published, the minimum rate will be 0.5% of the virgin binder. If the APEAS published rates are 0.5% of total binder or higher, the minimum rate may be reduced to 0.5% of the virgin binder.
Approval of the JMF is also dependent on Hamburg wheel-track testing results conducted at the ODOT Central Materials Laboratory. When tested according to AASHTO T 324 for 20,000 passes at a test temperature of 50 °C the minimum requirements are:
• Rut depth (Level 4 wearing Course) ........................................ 5mm max.
• Rut depth (All others) .............................................................. 7mm max.
• Stripping inflection point (All levels) .................................................. none
(2) Addition to Asphalt Cement - Blend the LASA at the asphalt terminal prior to delivery to the mixing plant. Use LASA compatible with the asphalt cement. Comply with all asphalt cement requirements for the blended product. Do not change the LASA addition rate without prior approval from the Engineer.
(3) Field Testing During Production - At the Agency’s discretion, production mixture may be tested at the Central Materials Laboratory. Failure to meet the criteria listed above may require a change in addition rate, a change of approved LASA, or lime-treatment of Aggregate to continue production.
00745.13 Job Mix Formula Requirements - Replace the paragraph that begins "Do not begin production of ACP for use..." with the following paragraph:
Do not begin production of ACP for use on the Project until the JMF is reviewed by the Engineer and written consent is provided to proceed. The JMF proposed for use on the Project will be evaluated based on the criteria identified in 00745.13(a) and 00745.13(b) and the latest ODOT Contractor Mix Design Guidelines for Asphalt Concrete. A new JMF is required if the asphalt cement source or grade, any additives, or the source of the Aggregate change during production. A change in the source of asphalt cement requires a new passing TSR.
00745.46(b) Depositing - Replace the paragraph that begins "Deposit ACP from..." with the following paragraph:
Deposit ACP from the hauling vehicles so segregation is prevented. Do not deliver the ACP directly into the paving machine for wearing Courses where the continuous length of the Panel is greater than 500 feet.
Deliver the ACP to the paving machine by either a windrow pick-up machine or an end-dump transfer machine.
00745.47(a)(2) Wearing Course - Replace this subsection, except for the subsection number and title, with the following:
Construct longitudinal joints six inches from permanent lane markings, or as shown or directed.
00745.48(c) Bridge Deck Overlays - Replace the paragraph that begins "Saw cut the wearing Course of Pavement …" with the following paragraph:
Sawcut the wearing or base Course of Pavement directly over the joints in bridge decks, bridge end joints and end Panel end joints as soon as practical but within 48 hours of paving each stage of the wearing or base Course, unless otherwise directed. Saw the cut 3/8 inch wide, ± 1/8 inch, by 1/2 inch less than the thickness of the Panel of Pavement depth or 1 1/2 inches deep, whichever is less.
00745.51 Opening Sections to Traffic - Schedule Work so that, during the same shift, the surfaces being paved are paved full width and length through the wearing Course before opening to traffic.
00745.80 Measurement - Add the following paragraph to the beginning of this subsection:
The quantities of ACP shown in the Contract Schedule of Items were computed on the basis of Aggregates having a specific gravity of 2.75.
00745.90 Payment -
In the paragraph that begins "No separate or additional payment…", add the following bullet to the end of the bullet list:
• Aggregate treatment - latex polymer
Add the following paragraph to the end of this subsection:
No separate or additional payment will be made for asphalt cement used in the mixture.
In the paragraph that begins "No separate or additional payment…", add the following bullet to the end of the bullet list:
• liquid anti-stripping asphalt cement additives
***END OF SPECIAL PROVISIONS***