This is a Bid Results tabulation document from the Oregon Department of Transportation (ODOT) for ITB No. S-73000-00015494, the OR38 Elkton Marked Crosswalk at Edgeview Drive project in Douglas County, Oregon. The project encompasses construction of concrete curb ramps along Umpqua Highway (OR38) eastbound at Edgeview Drive near Elkton High School, including work zone traffic control, removal of existing structures, erosion and pollution control, construction survey work, aggregate base installation, asphalt concrete pavement, concrete curbs and gutters, concrete walks, and truncated domes for accessibility compliance. The bid closing occurred on January 7, 2026, at 2:00 PM. Eight contractors submitted bids for the project, which includes 13 line items ranging from mobilization and site preparation through finished concrete work.
The eight bidders and their total bid amounts are as follows: Civil West Construction ($17,500.04), Pacific Excavation ($37,670.00), Wickwire Contracting LLC ($42,770.00), Brown Contracting, Inc. ($44,888.00), Coastal Construction Services LLC ($44,945.00), Guido Construction Inc. ($45,107.00), Wildish Construction Co. ($51,030.00), and Freedom Builders ($57,778.00). The project includes specialized line items for contaminated soil disposal (33 tons estimated) and a mandatory lead compliance plan, reflecting environmental considerations. All bidders are required to be registered with Oregon's Construction Contractors Board and meet the contract's Emerging Small Business (ESB) certification requirements with 51 percent labor performed by the contractor's own workforce. The bid tabulation note indicates that this document is not an indicator of award but rather a compilation of submitted bids for consideration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFCQ Bid Pricing Form.xlsx | XLSX spreadsheet | |
| 00015494 RFCQ.docx | DOCX document | |
| 00015494 RFCQ R1.docx | DOCX document | |
| Exhibit 2 Plans~25.pdf | ||
| 00015494 Attachments R1.docx | DOCX document | |
| 00015494 Attachments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 1/7/26 | |||||||||||
| ITB No. | S-73000-00015494 | BIDDER | ||||||||||
| NAME: | Civil West Construction | Pacific Excavation | Wickwire Contracting LLC | Brown Contracting, Inc. | Coastal Construction Services LLC | Guido Construction Inc. | Wildish Construction Co. | Freedom Builders | ||||
| Bid Closing: | 1/7/2026 @ 2:00 PM | CITY/STATE: | Salem, OR | Eugene, OR | Pleasant Hill, OR | Eugene, OR | Coquille, OR | Roseburg, OR | Eugene, OR | Azalea, OR | ||
| Description: | OR38 Elkton Marked Crosswalk at Edgeview Dr. | CCB# | 237876 | 135018 | 243625 | 11420 | 235637 | 183146 | 695 | 198888 | ||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | MOBILIZATION | 1 | LS | $2,000.00 | $2,000.00 | $8,800.00 | $8,800.00 | $2,500.00 | $2,500.00 | $4,444.00 | $4,444.00 | $5,000.00 | $5,000.00 | $4,100.00 | $4,100.00 | $15,000.00 | $15,000.00 | $5,493.00 | $5,493.00 |
| 2 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE | 1 | LS | $678.00 | $678.00 | $2,000.00 | $2,000.00 | $1,000.00 | $1,000.00 | $5,565.00 | $5,565.00 | $7,500.00 | $7,500.00 | $5,000.00 | $5,000.00 | $2,500.00 | $2,500.00 | $5,000.00 | $5,000.00 |
| 3 | EROSION CONTROL | 1 | LS | $240.00 | $240.00 | $2,000.00 | $2,000.00 | $200.00 | $200.00 | $1,000.00 | $1,000.00 | $500.00 | $500.00 | $1,500.00 | $1,500.00 | $300.00 | $300.00 | $1,500.00 | $1,500.00 |
| 4 | POLLUTION CONTROL PLAN | 1 | LS | $100.00 | $100.00 | $175.00 | $175.00 | $500.00 | $500.00 | $250.00 | $250.00 | $500.00 | $500.00 | $3,500.00 | $3,500.00 | $200.00 | $200.00 | $1,500.00 | $1,500.00 |
| 5 | CONTAMINATED SOIL DISPOSAL | 33.00 | TON | $148.22 | $4,891.26 | $190.00 | $6,270.00 | $250.00 | $8,250.00 | $50.00 | $1,650.00 | $95.00 | $3,135.00 | $190.00 | $6,270.00 | $100.00 | $3,300.00 | $450.00 | $14,850.00 |
| 6 | LEAD COMPLIANCE PLAN | 1 | LS | $100.00 | $100.00 | $175.00 | $175.00 | $1,000.00 | $1,000.00 | $250.00 | $250.00 | $500.00 | $500.00 | $6,500.00 | $6,500.00 | $500.00 | $500.00 | $2,500.00 | $2,500.00 |
| 7 | CONSTRUCTION SURVEY WORK | 1 | LS | $1,000.00 | $1,000.00 | $2,800.00 | $2,800.00 | $1,500.00 | $1,500.00 | $2,222.00 | $2,222.00 | $2,500.00 | $2,500.00 | $900.00 | $900.00 | $1,600.00 | $1,600.00 | $3,500.00 | $3,500.00 |
| 8 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | 1 | LS | $2,010.00 | $2,010.00 | $2,500.00 | $2,500.00 | $1,000.00 | $1,000.00 | $3,000.00 | $3,000.00 | $1,500.00 | $1,500.00 | $7,200.00 | $7,200.00 | $10,500.00 | $10,500.00 | $5,000.00 | $5,000.00 |
| 9 | AGGREGATE BASE | 25.00 | TON | $40.65 | $1,016.25 | $80.00 | $2,000.00 | $150.00 | $3,750.00 | $144.00 | $3,600.00 | $100.00 | $2,500.00 | $90.00 | $2,250.00 | $50.00 | $1,250.00 | $75.00 | $1,875.00 |
| 10 | COMMERCIAL ASPHALT CONCRETE PAVEMENT | 13.00 | TON | $173.85 | $2,260.05 | $330.00 | $4,290.00 | $750.00 | $9,750.00 | $515.00 | $6,695.00 | $250.00 | $3,250.00 | $195.00 | $2,535.00 | $400.00 | $5,200.00 | $300.00 | $3,900.00 |
| 11 | CONCRETE CURBS, CURB AND GUTTER | 60.0 | FOOT | $17.58 | $1,054.80 | $45.00 | $2,700.00 | $100.00 | $6,000.00 | $115.00 | $6,900.00 | $95.00 | $5,700.00 | $42.00 | $2,520.00 | $50.00 | $3,000.00 | $35.00 | $2,100.00 |
| 12 | CONCRETE WALKS | 240.0 | SQFT | $6.04 | $1,449.60 | $13.00 | $3,120.00 | $25.00 | $6,000.00 | $33.00 | $7,920.00 | $45.00 | $10,800.00 | $8.00 | $1,920.00 | $30.00 | $7,200.00 | $40.00 | $9,600.00 |
| 13 | TRUNCATED DOMES ON NEW SURFACES, CONCRETE | 24 | SQFT | $29.17 | $700.08 | $35.00 | $840.00 | $55.00 | $1,320.00 | $58.00 | $1,392.00 | $65.00 | $1,560.00 | $38.00 | $912.00 | $20.00 | $480.00 | $40.00 | $960.00 |
| TOTAL | $ 17,500.04 | $ 37,670.00 | $ 42,770.00 | $ 44,888.00 | $ 44,945.00 | $ 45,107.00 | $ 51,030.00 | $ 57,778.00 |