00015104_Att C_Bid Pricing Form.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- ITB - Dillard-Peebles Road Bridge Rail Repair
- Solicitation number
- S-73000-00015104
- Issued by
- Lane County, Oregon
About this file
This document is a Bid Pricing Form for a transportation infrastructure project issued by the Oregon Department of Transportation (ODOT) under solicitation number S-73000-00015104. The bid form outlines nine distinct line items for a bridge repair and maintenance project, including mobilization, temporary work zone traffic control, bridge removal work, concrete repair, structural steel maintenance, and replacement of steel tube bridge rail. The estimated quantities range from 1 lump sum (LS) to 22 linear feet (FT) and 17 square feet (SQFT), with the current bid total showing $0.00 across all line items.
The pricing form appears to be a template for potential bidders to complete, with placeholders for unit prices and total project costs. The document provides a structured format for contractors to propose pricing for specific bridge maintenance and repair tasks, suggesting a competitive bidding process for infrastructure improvement work. While the current form is blank, it indicates a comprehensive approach to capturing detailed cost information for the proposed scope of work, allowing ODOT to evaluate and compare potential contractor proposals systematically.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00015104_Bid tab.xlsx | XLSX spreadsheet | |
| 00015104_Att A_Plan.pdf | ||
| 00015104_ITB.docx | DOCX document | |
| S-10000-00015105 REVISED Exhibit D Opportunity Notice.pdf | ||
| Record Drawings~2.pdf | ||
| 00015104_Att B_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT C - BID PRICING FORM S-73000-00015104 |
| Bidder name: |
| City, State: |
The Bidder proposes to furnish all material, equipment and labor, and perform all work for ODOT, in strict accordance with the ITB and the Plans, Specifications and other provisions incorporated in the ITB, on the basis of the lump sum or unit prices, or both, as follows:
| Item | Description | Est Qty | Unit | Unit Price | Total |
| 1 | Mobilization | 1 | LS | $0.00 | |
| 2 | Temporary Work Zone Traffic Control, Complete | 1 | LS | $0.00 | |
| 3 | Temporary Work Access And Containment | 1 | LS | $0.00 | |
| 4 | Bridge Removal Work | 1 | LS | $0.00 | |
| 5 | Coated Reinforcement, Grade 60 | 1 | LS | $0.00 | |
| 6 | Locate Concrete Repair | 1 | LS | $0.00 | |
| 7 | Concrete Repair | 17 | SQFT | $0.00 | |
| 8 | Structural Steel Maintenance | 1 | LS | $0.00 | |
| 9 | Replace Steel Tube Bridge Rail | 22 | FT | $0.00 | |
| BID TOTAL | $0.00 |
File details come from the government source that posted it. Updated .