This is a Request for Bid (RFB) document issued by the Oregon Department of Transportation (ODOT) for on-call Region 2 paving work related to the US26 MP33 Burn Paving Project. The project involves pavement replacement on approximately 20 feet by 60 feet of the eastbound direction of US26 near milepost 33, just east of the Mt. St. Helens viewpoint, following a recent vehicle fire. The scope of work includes mobilization, temporary work zone traffic control, pollution control planning, cold plane pavement removal to 2 inches deep (133 square yards), Level 3 1/2-inch dense asphalt concrete pavement mixture installation (15 tons), hi-build paint application (60 linear feet), and continuous rumble strips (0.01 miles). Bids are due by October 16, 2025, at 2:00 PM, with a required project completion date of December 31, 2025. The work will be performed in Washington County, Oregon. No site visit or bidders' conference is mentioned in the documentation.
The project requires compliance with domestic preference requirements under ORS 279C.303 and State Buy America Provisions. If the contract price exceeds $50,000, prevailing wage rates as established by Oregon's Bureau of Labor and Industries apply. Traffic restrictions prohibit lane closures during commute hours (7:00 AM to 9:00 AM and 4:00 PM to 6:00 PM on weekdays) and prohibit work on weekends or holidays. Portable Changeable Message Signs must be placed a minimum of three days in advance of any ramp or lane closure. Contractors must submit completed bids through OregonBuys, including both the RFB/Work Order form with unit and total prices and the total bid price on the Items tab. The ODOT Project Manager is Cody Stone, reachable at 503-953-6334 or Cody.Stone@ODOT.Oregon.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RAIN SOLE SOURCE PUBLIC NOTICE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| REQUEST FOR BID AND RESULTING WORK ORDER |
| On-Call Region 2 Paving |
| INSTRUCTIONS: ODOT will fill in all information below except Contractor Information, Work Order Number (to be added upon award of Work Order), and pricing. ODOT will provide a list of bid items and their estimated quantities. Contractor must complete the Contractor Information section, including a signature, and insert unit and total prices for all bid items. Contractor must submit its bid by uploading the completed Request for Bid/Work Order form to the Attachments tab for the project in OregonBuys and entering the total bid price on the Items tab. |
Request for Bid Number: S-73000-00015078 Work Order Number:
Issue Date: 10/2/2025 Bid due date and time: 10/16/2025 2:00 pm
Project Name: US26 MP33 Burn Paving
Project description (include milepoint locations): Due to a recent vehicle fire, an area approximately 20'x60' in the EB direction of US26 near MP33 (just east of the Mt. St. Helens viewpoint) needs to be replaced. Centerline paint, rumbles, and recesses markers are to remain, grinding area to be from southern edge of CL paint to the southern edge of pavement (EB lane and shoulder). Cut butt joints of grinding to a vertical edge per RD610.
| ODOT Project Manager Name and Phone number: Cody Stone 503-953-6334 |
| ODOT Project Manager Billing Address (may be an email): Cody.Stone@ODOT.Oregon.gov |
ODOT Site Representative (if different than ODOT Project Manager):
Required Completion Date: 12/31/2025
CONTRACTOR INFORMATION
Contractor (COMPANY) Legal Name:
Address:
Contact Person: Email:
Phone: CCB #:
Contractor's On-Call Region 2 Paving Price Agreement Number: PO-73000-
Contractor’s signature below indicates its firm offer to provide the Services described in this Work Order in accordance with all terms, conditions, and specifications contained in the Price Agreement referenced above, and any additional specifications contained within this Work Order and its attachments. The Work Order is not effective until it is signed by ODOT's Procurement Authority, and ODOT issues a notice to proceed.
Contractor Signature: Date:
| ODOT Signature (Procurement Authority): | Date: |
| ANTICIPATED WORK ITEMS (PAY ITEMS) | |
| This Work Order indicates an estimate of services/quantities required. Payment to Contractor will be made based on actual quantities provided/performed: |
| Item | Description | Est. Qty. | Unit | Unit Price | Total Price |
| 1 | Mobilization | 1 | LS | $ - 0 | |
| 2 | Temporary Work Zone Traffic Control, Complete | 1 | LS | $ - 0 | |
| 3 | Pollution Control Plan | 1 | LS | $ - 0 | |
| 4 | Cold Plane Pavement Removal, 2" Deep | 133 | SQ YD | $ - 0 | |
| 5 | Level 3, 1/2" Dense ACP Mixture (PG64-22) | 15 | TON | $ - 0 | |
| 6 | Hi-Build Paint, Extruded or Sprayed, Surface | 60 | FOOT | $ - 0 | |
| 7 | Continuous Rumble Strips | 0.01 | MILE | $ - 0 | |
| $ - 0 | |||||
| PROJECT SPECIFIC REQUIREMENTS |
This project requires compliance with the domestic preference requirements of ORS 279C.303. Contractor shall comply with Price Agreement Exhibit A - State Buy America Provisions.
IF THE CONTRACT PRICE IS GREATER THAN $50,000, this project requires payment of the following prevailing wage rates, which are available online at http://www.oregon.gov/boli/WHD/PWR/Pages/pwr_state.aspx:
The “PREVAILING WAGE RATES for Public Works Contracts in Oregon” July 1, 2025
| County where the work will be performed: Washington |
| The following attachments are incorporated into this Request for Bid and any resulting Work Order: |
X One or more traffic lanes may be closed when allowed, shown, or directed during the following periods of time:
No closures during commute times: (7:00AM to 9:00AM and 4:00PM to 6:00 PM Monday through Friday) No work on weekends or holidays
X Portable Changeable Message Signs (PCMS) shall be placed a minimum of 3 days in advance of any ramp or lane closure to alert the public of the closure. The location of the PCMS and the message on the PCMS shall be submitted to the Project Manager as part of the Contractor’s proposed TCP.
Traffic will be allowed on the cold planed surface up to ____ calendar days after removing the existing surface. Sweep and clean the cold planed surface before opening to traffic.