00014744 Bid Results.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Vegetables Frozen, Assorted
- Solicitation number
- S-29100-00014743
- Issued by
- Marion County, Oregon
About this file
This is a Bid Results tabulation for Invitation to Bid (ITB) No. S-73000-00014744 issued by the State of Oregon for a road sink repair project on Oregon Route 234, Milepost 15.1 to 15.4, located in the Medford area. The project encompasses comprehensive roadway rehabilitation including excavation, embankment stabilization, drainage improvements, pavement removal and replacement, and erosion control measures. Five bidders submitted proposals by the September 18, 2025, bid closing at 11:00 AM: Visar Construction Co., Inc. (CCB# 146009) from Medford; Morello Construction LLC (CCB# 174397) from Klamath Falls; LTM, Incorporated dba Knife River Materials (CCB# 56603) from Coos Bay; LaDuke Construction, LLC (CCB# 193168) from Central Point; and HP Civil (CCB# 202060) from Salem. The project comprises 32 line items spanning mobilization, traffic control, erosion and pollution control, site preparation, excavation, embankment and drainage work, pavement operations, and permanent seeding.
Total bid prices ranged from $837,610.00 (Visar Construction) to $1,261,038.88 (HP Civil), reflecting significant variation in unit pricing across major cost categories such as general excavation, stone embankment, and culvert pipe installation. Notable pricing disparities include stone embankment costs ranging from $23.00 to $43.00 per ton, 36-inch culvert pipe costs from $394.00 to $1,400.00 per linear foot, and loose rip rap Class 700 costs from $55.00 to $300.00 per cubic yard. The bid tabulation serves as a preliminary summary for evaluation purposes and does not constitute a contract award determination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vegetables Assorted~16.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 9/18/25 | |||||||||||||
| ITB No. | S-73000-00014744 | BIDDER | ||||||||||||
| NAME: | Visar Construction Co., Inc. | Morello Construction LLC | LTM, Incorporated dba Knife River Materials | LaDuke Construction, LLC | HP Civil | |||||||||
| Bid Closing: | 9/18/2025 at 11:00 AM | CITY/STATE: | Medford, OR | Klamath Falls, Oregon | Coos Bay, OR | Central Point, OR | Salem, OR | |||||||
| Description: | ER OR234 MP 15.1 to 15.4 Sink Repair | CCB# | 146009 | 174397 | 56603 | 193168 | 202060 | |||||||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | L.S. | $55,000.00 | $55,000.00 | $58,000.00 | $58,000.00 | $111,590.00 | $111,590.00 | $115,000.00 | $115,000.00 | $ 126,103.88 | $126,103.88 |
| 2 | Temporary Protection and Direction of Traffic | 1 | L.S. | $5,000.00 | $5,000.00 | $6,400.00 | $6,400.00 | $13,321.00 | $13,321.00 | $21,000.00 | $21,000.00 | $ 70,000.00 | $70,000.00 |
| 3 | Temporary Signs | 845 | SqFt | $15.00 | $12,675.00 | $35.00 | $29,575.00 | $26.00 | $21,970.00 | $34.00 | $28,730.00 | $ 30.00 | $25,350.00 |
| 4 | Temporary Barricades, Type 3 | 12 | Each | $300.00 | $3,600.00 | $240.00 | $2,880.00 | $150.00 | $1,800.00 | $185.00 | $2,220.00 | $ 200.00 | $2,400.00 |
| 5 | Temporary Plastic Drums | 37 | Each | $55.00 | $2,035.00 | $50.00 | $1,850.00 | $50.00 | $1,850.00 | $85.00 | $3,145.00 | $ 55.00 | $2,035.00 |
| 6 | Portable Changeable Message Signs | 2 | Each | $2,500.00 | $5,000.00 | $2,000.00 | $4,000.00 | $1,500.00 | $3,000.00 | $3,000.00 | $6,000.00 | $ 5,000.00 | $10,000.00 |
| 7 | Flaggers | 150 | Hour | $82.00 | $12,300.00 | $80.00 | $12,000.00 | $80.00 | $12,000.00 | $83.00 | $12,450.00 | $ 75.00 | $11,250.00 |
| 8 | Flaggers Station Lighting | 3 | Each | $3,500.00 | $10,500.00 | $2,571.00 | $7,713.00 | $500.00 | $1,500.00 | $3,000.00 | $9,000.00 | $ 1,500.00 | $4,500.00 |
| 9 | Erosion Control | 1 | L.S. | $3,500.00 | $3,500.00 | $2,580.00 | $2,580.00 | $9800.00 | $9,800.00 | $4,500.00 | $4,500.00 | $ 5,000.00 | $5,000.00 |
| 10 | Pollution Control Plan | 1 | L.S. | $1,500.00 | $1,500.00 | $950.00 | $950.00 | $1250.00 | $1,250.00 | $1,200.00 | $1,200.00 | $ 500.00 | $500.00 |
| 11 | Construction Survey Work | 1 | L.S. | $3,500.00 | $3,500.00 | $19,500.00 | $19,500.00 | $7500.00 | $7,500.00 | $17,300.00 | $17,300.00 | $ 20,000.00 | $20,000.00 |
| 12 | Removal of structures and Obstructions | 1 | L.S. | $10,500.00 | $10,500.00 | $3,368.00 | $3,368.00 | $15000.00 | $15,000.00 | $3,400.00 | $3,400.00 | $ 2,500.00 | $2,500.00 |
| 13 | Clearing and Grubbing | 0.25 | Acre | $40,000.00 | $10,000.00 | $30,280.00 | $7,570.00 | $80,000.00 | $20,000.00 | $70,000.00 | $17,500.00 | $ 50,000.00 | $12,500.00 |
| 14 | General Excavation | 7300 | CUYD | $23.00 | $167,900.00 | $23.00 | $167,900.00 | $35.00 | $255,500.00 | $20.60 | $150,380.00 | $ 30.00 | $219,000.00 |
| 15 | Stone Embankment | 12000 | TON | $23.00 | $276,000.00 | $38.00 | $456,000.00 | $24.00 | $288,000.00 | $43.00 | $516,000.00 | $ 33.00 | $396,000.00 |
| 16 | Rip Rap Geotextile, Type 2 | 2100 | SQFT | $1.00 | $2,100.00 | $2.00 | $4,200.00 | $2.00 | $4,200.00 | $0.70 | $1,470.00 | $ 0.65 | $1,365.00 |
| 17 | Filter Blanket | 50 | SQYD | $60.00 | $3,000.00 | $2.00 | $100.00 | $39.86 | $1,993.00 | $60.00 | $3,000.00 | $ 90.00 | $4,500.00 |
| 18 | Loose Rip Rap, Class 200 | 42 | CUYD | $55.00 | $2,310.00 | $85.00 | $3,570.00 | $110.00 | $4,620.00 | $110.00 | $4,620.00 | $ 150.00 | $6,300.00 |
| 19 | Loose Rip Rap, Class 700 | 56 | CUYD | $55.00 | $3,080.00 | $85.00 | $4,760.00 | $110.00 | $6,160.00 | $123.00 | $6,888.00 | $ 300.00 | $16,800.00 |
| 20 | 12 Inch Drain Pipe | 300 | Foot | $105.00 | $31,500.00 | $82.00 | $24,600.00 | $75.00 | $22,500.00 | $89.00 | $26,700.00 | $ 120.00 | $36,000.00 |
| 21 | Subsurface Drain Outlets | 1 | Each | $5,365.00 | $5,365.00 | $1,326.00 | $1,326.00 | $2,200.00 | $2,200.00 | $300.00 | $300.00 | $ 2,000.00 | $2,000.00 |
| 22 | 36 Inch Culvert Pipe, Over 20 foot Depth | 125 | Foot | $394.00 | $49,250.00 | $427.00 | $53,375.00 | $1400.00 | $175,000.00 | $500.73 | $62,591.25 | $ 750.00 | $93,750.00 |
| 23 | Sloped End Sections, 36 Inch | 2 | Each | $2,800.00 | $5,600.00 | $888.00 | $1,776.00 | $700.00 | $1,400.00 | $300.00 | $600.00 | $ 1,500.00 | $3,000.00 |
| 24 | Concrete Storm Sewer Manholes | 3 | Each | $5,800.00 | $17,400.00 | $7,881.00 | $23,643.00 | $7000.00 | $21,000.00 | $5,500.00 | $16,500.00 | $ 7,500.00 | $22,500.00 |
| 25 | Cold Plane Pavement Removal, 3 Inches Deep | 760 | SQYD | $9.00 | $6,840.00 | $17.00 | $12,920.00 | $8.25 | $6,270.00 | $13.00 | $9,880.00 | $ 17.00 | $12,920.00 |
| 26 | Aggregate Base | 50 | TON | $55.00 | $2,750.00 | $200.00 | $10,000.00 | $55.00 | $2,750.00 | $32.00 | $1,600.00 | $ 60.00 | $3,000.00 |
| 27 | Level 3 ½ Inch ACP Mixture | 800 | TON | $138.00 | $110,400.00 | $146.00 | $116,800.00 | $115.00 | $92,000.00 | $150.00 | $120,000.00 | $ 175.00 | $140,000.00 |
| 28 | Delineators, Type 2 | 4 | Each | $200.00 | $800.00 | $150.00 | $600.00 | $135.00 | $540.00 | $90.00 | $360.00 | $ 250.00 | $1,000.00 |
| 29 | Culvert Drainage Markers, Type 1 | 2 | Each | $15.00 | $30.00 | $150.00 | $300.00 | $65.00 | $130.00 | $85.00 | $170.00 | $ 250.00 | $500.00 |
| 30 | Bi-Directional Yellow Type IAR Markers | 15 | Each | $25.00 | $375.00 | $28.00 | $420.00 | $15.00 | $225.00 | $15.00 | $225.00 | $ 15.00 | $225.00 |
| 31 | Thermoplastic, Sprayed, Surface, Non-Profiled | 2000 | Foot | $8.00 | $16,000.00 | $7.00 | $14,000.00 | $3.70 | $7,400.00 | $4.00 | $8,000.00 | $ 3.70 | $7,400.00 |
| 32 | Permanent Seeding | 0.24 | Acre | $7,500.00 | $1,800.00 | $3,500.00 | $840.00 | $14,400.00 | $3,456.00 | $20,000.00 | $4,800.00 | $ 11,000.00 | $2,640.00 |
| TOTAL | $ 837,610.00 | $ 1,053,516.00 | $ 1,115,925.00 | $ 1,175,529.25 | $ 1,261,038.88 |
File details come from the government source that posted it. Updated .