00014087 Bid Results.xlsx
XLSX spreadsheet 27 KB Posted
- Solicitation number
- S-73000-00014087
- Issued by
- Crook County, Oregon
About this file
This document is a Bid Results spreadsheet for Invitation to Bid (ITB) No. S-73000-00014087, issued by the Oregon Department of Transportation (ODOT) for the US101: MP303.06 Emergency Culvert Repair Project. The bid closing date was July 23, 2025, at 2:00 pm, with two bidders submitting proposals: LaDuke Construction, Inc. from Central Point, OR, and HP Civil, Inc. from Salem, OR. The project involves emergency culvert repair along US Highway 101 at milepost 303.06, encompassing 58 distinct bid items including mobilization, temporary traffic protection, erosion control, tunneling, and culvert installation. The scope includes constructing temporary access roads, implementing water management facilities, performing streambed enhancement, and installing horizontal drains.
The total bid prices were $3,958,460.00 for LaDuke Construction and $5,299,596.61 for HP Civil, Inc., with significant variations in unit pricing across multiple line items. The project is federally funded through the FHWA Emergency Relief Program and requires compliance with federal-aid contract provisions, including Buy America requirements and Davis-Bacon wage rates. Key technical challenges include trenchless culvert installation, working adjacent to the Rocky Point Landslide, and managing complex environmental protections. The contract mandates that contractors employ apprentices for 12% of work hours and be registered with the Oregon Bureau of Labor and Industries. The project has a substantial completion deadline of November 30, 2025, and final completion by December 5, 2025, with an estimated project cost between $1 million and $2 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATT C Bid Pricing Form~6.xlsx | XLSX spreadsheet | |
| ATT F - Geotechnical Engineering Report May 2025.pdf | ||
| Attachment A - Special Provisions and Specifications.pdf | ||
| 00014807 Invitation to Bid.docx | DOCX document | |
| ATT G Project Wage Rates.pdf | ||
| ATT E - Engineering Geology Report.pdf | ||
| ATT H APPRENTICESHIP REQUIREMENTS.docx | DOCX document | |
| ATT D - Constructability Review Summary of Discussions.pdf | ||
| ATT I FHWA Form 1273.pdf | ||
| Attachment B - Plans~1.pdf | ||
| 2025.057 Legal Ad.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 7/23/25 | |||||
| ITB No. | S-73000-00014087 | BIDDER | ||||
| NAME: | LaDuke Construction, Inc. | HP Civil, Inc. | ||||
| Bid Closing: | 7/23/2025 at 2:00 pm | CITY/STATE: | Central Point, OR | Salem, OR | ||
| Description: | ER US101: MP303.06 Emergency Culvert Repair Project | CCB# | 193168 | 202060 | ||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $490,000.00 | $ 490,000.00 | $529,959.66 | $ 529,959.66 |
| 2 | Temporary Protection and Direction of Traffic | 1 | LS | $29,000.00 | $ 29,000.00 | $150,000.00 | $ 150,000.00 |
| 3 | Temporary Signs | 245 | SQFT | $42.00 | $ 10,290.00 | $28.00 | $ 6,860.00 |
| 4 | Potable Changeable Message Signs | 2 | EA | $4,800.00 | $ 9,600.00 | $8,000.00 | $ 16,000.00 |
| 5 | Flaggers | 120 | HR | $79.00 | $ 9,480.00 | $90.00 | $ 10,800.00 |
| 6 | Temporary Barricades, Type II | 2 | EA | $125.00 | $ 250.00 | $110.00 | $ 220.00 |
| 7 | Temporary Barricades, Type III | 4 | EA | $185.00 | $ 740.00 | $200.00 | $ 800.00 |
| 8 | Temporary Plastic Drums | 24 | EA | $80.00 | $ 1,920.00 | $60.00 | $ 1,440.00 |
| 9 | Temporary Reflective Pavement Markers | 225 | EA | $10.00 | $ 2,250.00 | $8.50 | $ 1,912.50 |
| 10 | Temporary Striping | 6000 | FT | $2.00 | $ 12,000.00 | $0.55 | $ 3,300.00 |
| 11 | Temporary Pavement Bars | 24 | SQFT | $12.00 | $ 288.00 | $6.80 | $ 163.20 |
| 12 | Stripe Removal | 875 | FT | $2.00 | $ 1,750.00 | $1.15 | $ 1,006.25 |
| 13 | Temporary Barrier | 350 | FT | $32.00 | $ 11,200.00 | $18.00 | $ 6,300.00 |
| 14 | Temporary Impact Attenuator, Sand Barrel System | 1 | EA | $3,750.00 | $ 3,750.00 | $3,750.00 | $ 3,750.00 |
| 15 | Temporary Impact Attenuator, Narrow Site System | 1 | EA | $3,750.00 | $ 3,750.00 | $3,750.00 | $ 3,750.00 |
| 16 | Reflective Barrier Panels | 62 | EA | $30.00 | $ 1,860.00 | $30.00 | $ 1,860.00 |
| 17 | Repair Temporary Impact Attenuator, Narrow Site System | 2 | EA | $1,250.00 | $ 2,500.00 | $1,250.00 | $ 2,500.00 |
| 18 | Repair Temporary Impact Attenuator, Sand Module | 12 | EA | $100.00 | $ 1,200.00 | $100.00 | $ 1,200.00 |
| 19 | Portable Traffic Signal | 1 | LS | $18,900.00 | $ 18,900.00 | $45,000.00 | $ 45,000.00 |
| 20 | Construct Temporary Access Road, EAST | 1 | LS | $48,200.00 | $ 48,200.00 | $250,000.00 | $ 250,000.00 |
| 21 | Construct Temporary Access Road, WEST | 1 | LS | $68,900.00 | $ 68,900.00 | $250,000.00 | $ 250,000.00 |
| 22 | Temporary Water Management Facility at Station "A" 24+00 | 1 | LS | $33,000.00 | $ 33,000.00 | $435,000.00 | $ 435,000.00 |
| 23 | Bypass Pump Monitoring | 90 | DAY | $124.00 | $ 11,160.00 | $1,975.00 | $ 177,750.00 |
| 24 | Erosion Control | 1 | LS | $4,600.00 | $ 4,600.00 | $15,000.00 | $ 15,000.00 |
| 25 | Plastic Sheeting | 3000 | SQYD | $1.00 | $ 3,000.00 | $2.45 | $ 7,350.00 |
| 26 | Temporary Mulching, Straw | 0.5 | ACRE | $4,000.00 | $ 2,000.00 | $4,000.00 | $ 2,000.00 |
| 27 | Temporary Mulching, Compost | 0.2 | ACRE | $40,000.00 | $ 8,000.00 | $40,000.00 | $ 8,000.00 |
| 28 | Compost Erosion Blanket | 1500.0 | SQYD | $8.00 | $ 12,000.00 | $8.00 | $ 12,000.00 |
| 29 | Check Dam, Type 1 | 17.0 | EA | $180.00 | $ 3,060.00 | $250.00 | $ 4,250.00 |
| 30 | Erosion and Sediment Control Manager | 1.0 | LS | $6,800.00 | $ 6,800.00 | $35,000.00 | $ 35,000.00 |
| 31 | Construction Entrance, Type 1 | 2.0 | EA | $3,600.00 | $ 7,200.00 | $5,000.00 | $ 10,000.00 |
| 32 | Concrete Washout Facility | 1.0 | EA | $1,600.00 | $ 1,600.00 | $2,500.00 | $ 2,500.00 |
| 33 | Sediment Fence | 1350 | FT | $6.00 | $ 8,100.00 | $4.90 | $ 6,615.00 |
| 34 | Straw Bale | 100 | EA | $16.00 | $ 1,600.00 | $25.00 | $ 2,500.00 |
| 35 | Pollution Control Plan | 1 | LS | $1,200.00 | $ 1,200.00 | $500.00 | $ 500.00 |
| 36 | Turbidity Monitoring | 1 | LS | $3,400.00 | $ 3,400.00 | $5,000.00 | $ 5,000.00 |
| 37 | Construction Survey Work | 1 | LS | $29,000.00 | $ 29,000.00 | $65,000.00 | $ 65,000.00 |
| 38 | Removal of Structures and Obstructions | 1 | LS | $26,000.00 | $ 26,000.00 | $15,000.00 | $ 15,000.00 |
| 39 | Clearing and Grubbing | 1 | ACRE | $86,000.00 | $ 86,000.00 | $25,000.00 | $ 25,000.00 |
| 40 | Ditch Excavation | 500 | CUYD | $32.00 | $ 16,000.00 | $40.00 | $ 20,000.00 |
| 41 | Stone Embankment | 20 | CUYD | $155.00 | $ 3,100.00 | $155.00 | $ 3,100.00 |
| 42 | Riprap Geotextile, Type 2 | 350 | SQYD | $4.50 | $ 1,575.00 | $5.00 | $ 1,750.00 |
| 43 | PVC Liner | 400 | SQYD | $8.00 | $ 3,200.00 | $15.00 | $ 6,000.00 |
| 44 | Filter Blanket | 350 | SQYD | $69.00 | $ 24,150.00 | $98.00 | $ 34,300.00 |
| 45 | Loose Riprap, Class 50 | 200 | CUYD | $145.00 | $ 29,000.00 | $195.00 | $ 39,000.00 |
| 46 | Loose Riprap, Class 2000 | 300 | CUYD | $190.00 | $ 57,000.00 | $195.00 | $ 58,500.00 |
| 47 | Tunneling, Boring, and Jacking | 1 | LS | $1,560,000.00 | $ 1,560,000.00 | $2,000,000.00 | $ 2,000,000.00 |
| 48 | Low Density Cellular Concrete | 900 | CUYD | $129.65 | $ 116,685.00 | $80.00 | $ 72,000.00 |
| 49 | 48 Inch Steel Casing Pipe | 370 | FT | $2,285.00 | $ 845,450.00 | $600.00 | $ 222,000.00 |
| 50 | 5 Inch Steel Casing Pipe | 260 | FT | $110.00 | $ 28,600.00 | $100.00 | $ 26,000.00 |
| 51 | Sloped End Sections, 48 Inch | 1 | EA | $1,200.00 | $ 1,200.00 | $7,500.00 | $ 7,500.00 |
| 52 | Paved Culvert End Slopes | 98 | SQFT | $54.00 | $ 5,292.00 | $120.00 | $ 11,760.00 |
| 53 | Filling Abandoned Structures | 1 | EA | $19,800.00 | $ 19,800.00 | $110,000.00 | $ 110,000.00 |
| 54 | Drain Orientation Readings | 13 | EA | $500.00 | $ 6,500.00 | $750.00 | $ 9,750.00 |
| 55 | Horizonal Drains | 3670 | FT | $46.00 | $ 168,820.00 | $80.00 | $ 293,600.00 |
| 56 | Midwest Guardrail System, Type 2A | 50 | FT | $68.00 | $ 3,400.00 | $75.00 | $ 3,750.00 |
| 57 | Temporary Seeding | 0.2 | ACRE | $9,000.00 | $ 1,800.00 | $9,000.00 | $ 1,800.00 |
| 58 | Permanent Seeding | 1 | ACRE | $6,500.00 | $ 6,500.00 | $6,000.00 | $ 6,000.00 |
| 59 | Streambed Enhancement | 1 | LS | $78,340.00 | $ 78,340.00 | $250,000.00 | $ 250,000.00 |
| 60 | Engineering | 1 | LS | $6,500.00 | $ 6,500.00 | $7,500.00 | $ 7,500.00 |
| TOTAL | $ 3,958,460.00 | $ 5,299,596.61 |